【摘要】:塔式起重机是建筑施工过程中主要的垂直运输工具,随着建筑结构形式日益多样性,常规的塔式起重机附墙设计无法满足新型结构施工的要求,以武汉新能源研究院工程塔楼钢结构施工为例,建筑造型呈放射状、上大下小,屋顶为大跨度悬挑花冠型钢结构,介绍了塔式起重机多点超长距离附墙的设计及应用。
[Abstract]:Tower crane is the main vertical transportation tool in the construction process. With the increasing diversity of building structure, the conventional tower crane wall design can not meet the requirements of the new structure construction. Taking the construction of tower steel structure of Wuhan New Energy Research Institute as an example, the shape of the building is radial, the top is large and the lower is small, and the roof is a long-span cantilever Corolla type steel structure. This paper introduces the design and application of multi-point long distance wall attached to tower crane.
【作者单位】: 中建三局集团有限公司;
【分类号】:TU974;TU61
【正文快照】: 0引言当下随着城市化发展节奏日益加快,更多的新型和超高层建筑出现在我们视野中,塔式起重机作为建筑施工中主要的垂直运输设备,扮演着极其重要的角色,塔式起重机顶升过程中,为确保安全性,需以附墙的方式与建筑结构连接,按照相关规定,塔身中心距离结构边应在5m内,如若超出范围
【相似文献】
相关期刊论文 前10条
1 秦三明;艾迪美塔机附墙装置的三项改进[J];建筑机械化;2000年04期
2 蒋世伟,孔维潮,谢建民;塔式起重机提前附墙对联杆和基础的影响[J];建筑机械化;2003年05期
3 王晓霞;塔机附墙技术探讨[J];建筑安全;2005年01期
4 赵春潮;;塔机长附墙杆件的计算[J];建筑机械化;1993年06期
5 李伯勋;;塔机附墙安装竖向布置方案及结构局部抗剪措施[J];建筑安全;2014年01期
6 姚刚;黄金宝;卢育坤;邓先德;阁春雷;;内爬式塔吊附墙架设计的研究[J];施工技术;2009年S1期
7 杨华炳;;附墙式旗杆孔[J];建筑工人;1983年12期
8 邢勇;附墙电梯位置选择一法[J];建筑工人;2004年07期
9 朱诚强;;浅谈塔吊附墙装置的正确使用[J];建筑安全;2009年10期
10 陆德海,黄志明;浅谈塔机的附墙节点载荷及超高使用问题[J];建筑机械;2002年02期
,本文编号:1403167
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/1403167.html