云天化国际化工XX公司EPC总承包项目造价问题分析及对策研究
发布时间:2018-01-19 05:21
本文关键词: 造价 EPC总承包 存在问题 对策 出处:《云南大学》2014年硕士论文 论文类型:学位论文
【摘要】:在工程项目建设中,有多种承包模式,在诸多承包模式中,因EPC总承包模式具有建设单位管理难度小、风险小、工程工期及质量能得有效到保证等优势,故在云天化国际化工XX公司成为了工程建设的主要承包模式,但在EPC总承包模式下,云天化国际化工XX公司的建设项目超概成了普遍现象,本文对产生该现象的原因进行了分析研究,并提出了解决对策和建议。 论文从工程造价理论和EPC总承包理论出发,采用对比法、统计法等对云天化国际化工XX公司2006年~2012年主要建设项目进行分析,发现80%以上的建设项目都采用了EPC总承包模式。然后对云天化国际化工XX公司四个典型EPC总承包项目造价存在问题进行深入剖析,发现存在造价问题的共同点是全部项目最终投资都超出概算10%以上。 文章对云天化国际化工XX公司四个典型EPC总承包案例从概算形成流程、超概比较、造价结构比较、概算技术要求及中标文件技术要求对比几个方面进行分析,找出云天化国际化工XX公司EPC总承包模式超概的主要原因由“云天化国际化工XX公司建设项目最高概算价格的形成与EPC总承包方式造价控制存在矛盾”等四条组成。 文章的最后,针对云天化国际化工XX公司EPC总承包项目存在的普遍超概现象,提出了“调整云天化国际化工XX公司概算限价指标”等五条解决对策建议
[Abstract]:In the construction of engineering projects, there are many contracting modes. In many contracting modes, the EPC general contracting mode has the advantages of less difficult management, less risk, and effective guarantee of project duration and quality. Therefore, in Yuntianhua International Chemical XX Company has become the main contracting mode of engineering construction, but under the EPC general contract mode, the construction project of Yuntianhua International Chemical XX Company has become a common phenomenon. In this paper, the causes of this phenomenon are analyzed, and countermeasures and suggestions are put forward. Based on the engineering cost theory and EPC general contract theory, this paper analyzes the main construction projects of Yuntianhua International Chemical Industry XX Company from 2006 to 2012 by means of comparative method and statistical method. It is found that more than 80% construction projects have adopted EPC general contracting mode. Then the cost problems of four typical EPC general contract projects in Yuntianhua International Chemical Industry XX Company are deeply analyzed. The common denominator of the cost problem is that the final investment of all projects exceeds the estimated budget by more than 10%. In this paper, four typical EPC cases of Yuntianhua International Chemical Co., Ltd., are compared from the process of budget estimate, and the cost structure is compared. The technical requirements of the budget estimate and the technical requirements of the winning bid documents are analyzed in several aspects. To find out the main reasons for the overgeneralization of EPC general contracting mode of Yuntianhua International Chemical Co., XX Company. " The formation of the highest estimated price of the construction project of Yuntianhua International Chemical Industry XX Company and the contradiction between the cost control of the EPC general contract mode and the construction project cost control are composed of four parts. At the end of the article, aiming at the universal overgeneralization of EPC general contracting project of Yuntianhua International Chemical Industry XX Company. Five countermeasures are put forward, such as "adjust the price limit index of the estimate of Yuntianhua International Chemical XX Company" and so on.
【学位授予单位】:云南大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU723.3;F426.72
【参考文献】
相关期刊论文 前10条
1 黄彩芳;;浅析施工工程项目造价管理及主要方法[J];法制与经济(中旬刊);2008年10期
2 何上福;;工程项目造价管理及造价控制探讨[J];管理工程学报;2005年S1期
3 冯岩;;工程项目造价管理模式探讨[J];江苏建筑;2008年S1期
4 杨井泉;;公路工程项目造价管理[J];交通世界(运输.车辆);2011年05期
5 黄瑞华;;工程项目造价管理与控制必须“两全”[J];审计与理财;2008年03期
6 周魏铭;;对工程项目造价管理的认识和理解[J];建筑经济;2008年08期
7 刘颍敏;;论工程项目造价管理[J];山西建筑;2007年11期
8 张坤;;基于工程量清单计价下工程项目造价管理策略[J];山西建筑;2010年10期
9 乔秀丽;;浅谈入世后的工程项目造价管理对策[J];黑龙江科技信息;2009年22期
10 刘永中;;浅谈如何有效的降低建筑工程造价[J];科技风;2011年06期
,本文编号:1442812
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/1442812.html