晟达新材料影响区供水设施建设工程可行性研究
发布时间:2018-01-29 21:45
本文关键词: 供水 供水设施 管网建设 可行性研究 出处:《西华大学》2014年硕士论文 论文类型:学位论文
【摘要】:南充经济开发区是经四川省人民政府批准设立的省级经济开发区,是南充市唯一由市人民政府兴办的对外开放的窗口和深化改革的示范区。2008年9月,四川省发改委批复同意南充经济开发区进行扩区建设,新增扩区范围定位为化学工业园区。依据《南充市城市总体规划》(2008-2030),南充市化工园区与文锋片区、李渡工业片区和曲水组团共同构成以发展二、三类石油化工工业为主的城市“南部产业新城”。因此解决该区域(晟达新材料影响区)的供水问题也迫在眉睫。根据南充市康源水务集团多年来的建设经验,大面积管网的建设,从前期工作开始到竣工通水的周期,往往需要一年甚至更长时间,因而现阶段及时启动晟达材料影响区供水工程建设是市政府的明智之举,也是南充市经济保持良好、快速发展的重要保障。在多次深入现场,察勘研究,广泛收集有关资料,对晟达新材料影响区供水设施建设工程的供水系统总体布局、工程方案、投资造价、经济分析、社会效益、能源节省、环境影响等诸方面进行了充分的分析和研究,在此基础上,完成了晟达新材料影响区供水设施建设工程可行性研究报告。
[Abstract]:Nanchong Economic Development Zone is a provincial economic development zone approved by the Sichuan Provincial people's Government. It is the only window of opening to the outside world and a demonstration area for deepening reform in Nanchong City. September 2008. The Sichuan Development and Reform Commission approved the construction of the Nanchong Economic Development Zone, and the newly expanded area was designated as a chemical industrial park. According to the "Nanchong City Master Plan" (2008-2030). Nanchong Chemical Industry Park, Wenfeng District, Li du Industrial Zone and Qushui Group constitute two groups to develop. Three kinds of petrochemical industry industry mainly city "southern industry new city". Therefore, it is urgent to solve the water supply problem in this area (Shengda new material influence area). According to Nanchong City Kangyuan Water Group's construction experience for many years. The construction of large area pipeline network, from the beginning of the early work to the completion of the cycle of water supply, often takes a year or even longer, so it is wise for the municipal government to start the construction of the water supply project of Shengda material impact area in time at the present stage. It is also an important guarantee for the good and rapid economic development of Nanchong City. The overall layout of water supply system, project plan, investment cost, economic analysis, social benefit and energy saving of the water supply facilities construction project in Shengda new material influence area are discussed. On the basis of the analysis and research on environmental impact, the feasibility study report of water supply facilities construction in Shengda new material affected area was completed.
【学位授予单位】:西华大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU991
【参考文献】
相关期刊论文 前1条
1 王郑;王祝来;张勇;杨明明;;城市供水安全应急保障体系研究[J];灾害学;2006年02期
,本文编号:1474425
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/1474425.html