北京市燃气翻转内衬工艺实施优化研究

发布时间:2018-03-09 00:17

  本文选题:翻转内衬 切入点:施工组织 出处:《北京建筑大学》2014年硕士论文 论文类型:学位论文


【摘要】:北京市区目前有上千公里的燃气管线,因运行年限过长,腐蚀情况十分严重,急需改造。由于北京市近年来城市建设速度较快,道路上机动车数量猛增,同时地下各综合管线不断实施,造成原位开槽换管实施难度加大,各项非开挖修复工艺大量应用在实际改造工程中,其中翻转内衬修复方式在实际运用过程中体现出了突出的优势。2011年市燃气集团完成对东三环华威桥下700多米燃气高压管线的翻转内衬修复。作为试验段,该工艺经检测完全适用于老旧高压燃气管道的修复工作[1],可以在高压燃气管线修复工作中加以推广,通过试验扩展了翻转内衬工艺应用的范围,解决了高压管线非开挖修复的难题。然而在翻转内衬工艺实施过程中由于受到城市管理要求制约,以及不可知因素限制,造成前期手续办理周期较长,以及现场条件复杂造成施工降效情况发生,无法达到消除管线隐患的目的,因此需要对翻转内衬工艺组织实施过程,尤其是建设单位手续办理方面通过优化组织机构的方式加以改进,在总结工艺实施流程经验的基础上,高效推进工作,确保施工工期的目的。
[Abstract]:At present, there are thousands of kilometers of gas pipelines in Beijing's urban areas. Due to the long service life, the corrosion situation is very serious, and it is in urgent need of renovation. Because of the rapid urban construction in Beijing in recent years, the number of motor vehicles on the roads has increased dramatically. At the same time, the continuous implementation of underground comprehensive pipelines, resulting in in situ slotted pipe change implementation difficulties, various non-excavation repair technology is widely used in the actual transformation project, In 2011, the City Gas Group completed the repair of more than 700 meters of high pressure gas pipeline under Huawei Bridge in East third Ring Road. The process is fully applicable to the repair of old and old high pressure gas pipelines [1], and can be popularized in the repair of high pressure gas pipelines. The scope of application of the reverse liner process is extended through experiments. The problem of non-excavation and repair of high-pressure pipeline is solved. However, due to the restriction of urban management and unknowable factors in the implementation of the overturned lining process, the pre-procedure processing period is longer. And the complex conditions of the site cause the situation of construction efficiency reduction, which can not achieve the purpose of eliminating the hidden danger of pipeline, so it is necessary to organize the implementation process of the overturned lining process. In particular, the procedures of construction units should be improved by optimizing the organizational structure. On the basis of summing up the experience of the process implementation process, the work should be advanced efficiently to ensure the purpose of construction period.
【学位授予单位】:北京建筑大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU996.8

【参考文献】

相关期刊论文 前8条

1 张淑洁;王瑞;王欢;;管道修复用管状纺织复合材料强度的设计原理[J];复合材料学报;2008年02期

2 韩权友;强化施工现场管理促进文明施工的思考[J];建筑管理现代化;2005年02期

3 张一先,张隆;管道煤气泄漏事故评估的不确定性[J];煤气与热力;2000年01期

4 周中;天然气管道防腐问题的探讨[J];煤气与热力;2001年03期

5 梁莉嘉;陈荣清;;埋地燃气管道防腐综合评价与修复技术分析[J];煤气与热力;2009年06期

6 董蓟伟;孙明烨;曹国权;翟博;龚明;;非开挖翻转内衬技术在燃气管道修复的应用[J];煤气与热力;2011年07期

7 王佩建;;浅谈建筑施工企业的文明施工管理[J];建材技术与应用;2007年02期

8 付先波;;建筑企业文明施工管理探讨[J];中州煤炭;2007年01期



本文编号:1586172

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/chengjian/1586172.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户98bb5***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com