大型核、火电厂取水结构施工技术研究
本文选题:取水水工结构 + 循泵房沉井 ; 参考:《上海交通大学》2014年硕士论文
【摘要】:大型核、火电厂厂址多位于沿江、滨海地区,地质条件复杂,其取水构筑物均为大型水工结构,如超大超深的循泵房沉井、大口径取水管道和取水口等,施工具有相当大的难度和风险,因此针对沿江、滨海复杂软土地层中大型取水结构施工关键技术研究有着十分重要的理论意义和工程应用前景。本文依托多个实际工程,运用理论分析、数值模拟、工程实测、方案比选等方法,对大型核、火电厂取水水工结构的循泵房沉井、取水隧道和取水口施工技术进行较系统性地研究,主要研究的内容和结果如下:1.通过开展深井降水工艺、沉井下沉、助沉纠偏措施等关键技术的研究,结合施工方案比选,研发了高灵敏性软土中保护沉井嵌套桩的工艺,并将研究结果应用于江边细砂与海岛高灵敏性软土区域的循泵房沉井施工,在保障工程安全顺利完成的同时加快了施工进度、降低了工程造价。2.针对华能金陵电厂取水盾构需穿越江底抛石沉降区的施工难题,开展了盾构隧道结合气压清障施工工艺和技术的研究,并将成果应用于该工程,使盾构顺利穿越抛石沉降区,可为类似清障工程提供参考。3.在始发段为岩、土交界面的核电取水隧道施工工艺和关键技术研究中,将土压平衡盾构、新奥法、清障技术进行集成创新,首次将该集成创新工艺运用于施工,使盾构机顺利穿越复杂地层,完成了中国核电领域首个大直径盾构海底隧道。4.针对核电超大口径垂直顶升施工难题,研制了相关配套设备、开发了超大口径垂直顶升施工工艺,研究成果在三门核电一期工程中得到首次成功应用。本论文获得的施工工艺和技术研究成果,包括砂层及高灵敏性软土中沉井制作下沉控制技术、助沉纠偏措施、对嵌套桩的保护工艺;抛石沉降区中盾构结合气压清障工艺;岩土交界面中盾构、新奥法、清障技术的集成创新技术;开发的超大口径垂直顶升施工工艺,在工程中均得到了成功应用,可为今后类似的工程提供借鉴和参考。
[Abstract]:The sites of large nuclear and thermal power plants are mostly located along the Yangtze River and coastal areas, and the geological conditions are complex. The water intake structures are all large-scale hydraulic structures, such as ultra-deep caisson, large-caliber water intake pipes and water intake outlets, etc. The construction is very difficult and risky, so it is very important to study the key technology of the construction of large water intake structure along the river and in the coastal complex soft soil strata, which has very important theoretical significance and engineering application prospect. Based on many practical projects, this paper applies the methods of theoretical analysis, numerical simulation, engineering measurement, scheme comparison, etc., to the caisson of a large nuclear and thermal power plant's hydraulic structure. The construction technology of water intake tunnel and water intake is studied systematically. The main contents and results are as follows: 1. Through the research of the key techniques such as deep well dewatering technology, sinking and correcting measures, combined with the comparison and selection of construction scheme, the technology of protecting the nested piles in the high sensitive soft soil is developed. The application of the research results to the caisson construction in the area of riverside fine sand and island high sensitivity soft soil can ensure the project to be completed safely and smoothly at the same time accelerate the construction progress and reduce the project cost. In view of the construction problem that the shield machine of Huaneng Jinling Power Plant needs to pass through the riprap settlement area at the bottom of the river, the research on the construction technology and technology of shield tunnel combined with air pressure clearing barrier is carried out, and the results are applied to the project to make the shield tunneling pass smoothly through the riprap settlement area. It can provide reference for similar obstacle clearing projects. 3. In the study of the construction technology and key technology of the nuclear power intake tunnel at the interface of rock and soil, the integrated innovation of earth pressure balance shield tunneling, new Olympic method and barrier clearing technology was carried out, and the integrated innovation technology was applied in construction for the first time. The shield machine has successfully crossed the complex stratum and completed the first large diameter shield tunneling. 4. In view of the construction problem of super-large caliber vertical jacking in nuclear power plant, the related equipment was developed, and the construction technology of super-large caliber vertical lifting was developed. The research results were successfully applied in the first phase of Sanmen nuclear power project for the first time. The research results of the construction technology and technology obtained in this paper include the sinking control technology in sand layer and high sensitive soft soil, the measures to help the settlement and correction, the protection technology of nested pile, the shield combined with barometric barrier cleaning technology in the area of riprap settlement, and the control technology of sinking-control in sand bed and high sensitive soft soil. The integrated and innovative technology of shield tunneling, new Olympic method and barrier clearing technology in the interface of rock and soil, and the construction technology of super large caliber vertical jacking have been successfully applied in engineering, which can be used for reference and reference for similar projects in the future.
【学位授予单位】:上海交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU991.1
【相似文献】
相关期刊论文 前10条
1 张振宇;;盾构法施工技术在我国的应用与发展[J];武汉工程职业技术学院学报;2005年04期
2 石双丽;;浅谈盾构法施工对盾构设备的选型[J];山西建筑;2007年15期
3 向昌平;;盾构法施工技术在地铁建设运用中的技术问题分析[J];中国高新技术企业;2008年08期
4 ;轨道交通盾构法施工技术专题[J];城市轨道交通研究;2009年12期
5 刘娜;;盾构法施工单机核算管理模式的应用[J];现代隧道技术;2012年02期
6 顾艳阳;;降低盾构法施工成本的措施探讨[J];价值工程;2013年01期
7 王小红;;小议地铁施工盾构法施工技术[J];科技创新与应用;2013年34期
8 李明X;;大芝加哥1968~1976年污水管盾构法施工工程汇总[J];市政技术;1980年04期
9 马积薪;盾构法今昔[J];隧道译丛;1994年08期
10 汪波;亮马河北路污水工程盾构施工管理[J];市政技术;2001年03期
相关会议论文 前10条
1 孙海霞;赵文;王钊宇;于建军;;地铁盾构法施工对地表变形的影响分析[A];第九届海峡两岸隧道与地下工程学术及技术研讨会论文集[C];2010年
2 陈馈;孙谋;;重庆过江隧洞盾构法施工泥水处理技术[A];中国土木工程学会第十一届、隧道及地下工程分会第十三届年会论文集[C];2004年
3 洪开荣;;我国盾构隧道发展中的几个问题[A];科技、工程与经济社会协调发展——河南省第四届青年学术年会论文集(下册)[C];2004年
4 洪开荣;;我国盾构隧道发展中的几个问题[A];城市地下空间开发与地下工程施工技术高层论坛论文集[C];2004年
5 卿伟宸;廖红建;钱春宇;;盾构法施工影响地面最大沉降的若干因素分析[A];中国土木工程学会第十二届年会暨隧道及地下工程分会第十四届年会论文集[C];2006年
6 桥本正;管茜檬;朱合华;马险峰;;大口径长距离盾构机风险评估事例[A];同济大学校庆论坛——“工程风险管理与保险论坛”暨“中国土木工程学会院士论坛”资料汇编[C];2007年
7 沈建奇;金先龙;丁峻宏;李根国;王吉云;;盾构法施工三维并行数值模拟方法研究[A];首届工程设计高性能计算(HPC)技术应用论坛论文集[C];2007年
8 王暖堂;;城市地铁盾构法施工中的测量技术[A];第四届中国岩石锚固与注浆学术会议论文集[C];2007年
9 孔思丽;王建国;T.Nogami;;都市高密集建筑环境中双隧道盾构法施工引起的地面沉降分析[A];中国土木工程学会第九届土力学及岩土工程学术会议论文集(下册)[C];2003年
10 董伟东;;盾构机激光导向系统原理研究[A];中国测绘学会第八次全国会员代表大会暨2005年综合性学术年会论文集[C];2005年
相关重要报纸文章 前10条
1 本报记者 乔地 通讯员 申阳;开辟盾构数字化智能化新征程[N];科技日报;2014年
2 肖华;盾构“神器”助力新兴市场[N];中华建筑报;2014年
3 本报记者 陈克然;盾构市场“发烧” 科学施工不容忽视[N];中国建设报;2009年
4 本报记者 尤云;盾构企业追逐“英雄”时代[N];中华建筑报;2003年
5 本报记者 赵洪亮;盾构施工如何“创新 安全 突破”[N];中国水利报;2009年
6 本报记者 付毅飞;国产盾构加速地铁建设[N];科技日报;2005年
7 本报记者 王小润;黄昌富:勇往直前的“盾构机”[N];光明日报;2011年
8 成海忠;钟儒华;走在地铁施工前沿[N];中国铁道建筑报;2003年
9 本报记者 汤璇;领先国内的盾构“地中对接 洞内解体”法[N];广东建设报;2006年
10 特约记者 谢建蒲 通讯员 杨延安;盾构直指长江北岸[N];中国交通报;2004年
相关博士学位论文 前10条
1 杨春山;盾构隧道先隧后井施工对隧道变形的影响及对策研究[D];华南理工大学;2015年
2 余莉;苏州软土地层小净距隧道盾构施工交互影响机理研究[D];中国地质大学;2015年
3 胡国良;盾构模拟试验平台电液控制系统关键技术研究[D];浙江大学;2006年
4 马可栓;盾构施工引起地基移动与近邻建筑保护研究[D];华中科技大学;2008年
5 贾勇;盾构施工地层变形实测与三维数值模拟及参数分析[D];天津大学;2010年
6 徐前卫;盾构施工参数的地层适应性模型试验及其理论研究[D];同济大学;2006年
7 陈慧;基于无衍射光的盾构位姿测量系统的理论与技术研究[D];华中科技大学;2011年
8 胡祥涛;土—盾构相互作用研究及推进载荷规划[D];华中科技大学;2012年
9 雷明锋;侵蚀环境下盾构隧道结构性能全寿命计算方法研究[D];中南大学;2013年
10 叶飞;软土盾构隧道施工期上浮机理分析及控制研究[D];同济大学;2007年
相关硕士学位论文 前10条
1 杨宏泰;大直径盾构施工对邻近建筑安全性分析[D];北京建筑大学;2015年
2 梁霄;盾构超近距离下穿既有地铁盾构区间工程监测实例研究[D];中国地质大学(北京);2015年
3 韩金容;卵石地层盾构隧道近接铁路桥桩基施工安全控制技术研究[D];西南交通大学;2014年
4 赵晋;盾构隧道管片位移因素分析及控制措施研究[D];西南交通大学;2015年
5 高照;富水砂砾地层盾构施工地表沉降变形控制参数优化研究[D];西南交通大学;2015年
6 郭孝坤;郑州地铁盾构下穿施工对既有建筑桩基承载力的影响研究[D];郑州大学;2015年
7 杨啸南;地铁隧道盾构法施工下穿建筑物分析[D];南昌大学;2015年
8 张建毅;盾构施工引起地层变形的机理与数值模拟研究[D];中国矿业大学;2015年
9 贾玉生;盾构施工近接桩基的影响研究[D];安徽建筑大学;2015年
10 童雪雪;盾构施工对地下管线的影响分析[D];安徽建筑大学;2015年
,本文编号:2091148
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2091148.html