从工序控制谈核电厂施工现场精细管理
发布时间:2018-10-12 07:04
【摘要】:国内经济发展正处于转型时期,作为施工企业,也处于转型的潮流中,如何从以往的粗放型管理方式转变为精细型施工管理方式,成为整个施工行业需要考虑的事情。作者结合核电厂施工经验,从工序控制影响进度、质量、安全、成本等方面谈核电厂施工现场该如何进行精细管理。
[Abstract]:Domestic economic development is in the transition period, as a construction enterprise, but also in the trend of transformation, how to change from the previous extensive management mode to the fine construction management mode, become the whole construction industry to consider the matter. Based on the experience of nuclear power plant construction, the author discusses how to manage the construction site of nuclear power plant from the aspects of process control, quality, safety, cost and so on.
【作者单位】: 中国建筑第二工程局有限公司核电建设分公司;
【分类号】:TU721.2
本文编号:2265222
[Abstract]:Domestic economic development is in the transition period, as a construction enterprise, but also in the trend of transformation, how to change from the previous extensive management mode to the fine construction management mode, become the whole construction industry to consider the matter. Based on the experience of nuclear power plant construction, the author discusses how to manage the construction site of nuclear power plant from the aspects of process control, quality, safety, cost and so on.
【作者单位】: 中国建筑第二工程局有限公司核电建设分公司;
【分类号】:TU721.2
【相似文献】
相关期刊论文 前5条
1 田德强;;广西防城港核电厂施工供水规划实施方案[J];红水河;2010年06期
2 胡波;徐英虎;;非能动核电厂一回路核辅助设备安装方式探讨[J];机械工程师;2012年11期
3 周兵;;核电厂四通一平阶段取水工程应用[J];建设科技;2012年21期
4 周涛;孙灿辉;李精精;傅涛;;核电厂与火电厂电气 仪表及控制设备建设标准比较研究[J];国防技术基础;2010年12期
5 ;[J];;年期
相关重要报纸文章 前1条
1 通讯员 蔡燕国;防城港核电厂600吨门吊主梁吊装到位[N];中国船舶报;2011年
,本文编号:2265222
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2265222.html