地铁车站针孔法高压灌浆堵漏施工技术
发布时间:2018-12-05 22:40
【摘要】:工程中通过对局部渗漏点采取针孔法高压注浆堵漏有效解决了顽固渗漏点的渗水问题,取得了良好的堵漏效果,保证了车站主体结构施工质量。
[Abstract]:In the project, the pipe-hole method of high-pressure grouting is adopted to effectively solve the problem of seepage at the local leakage point, and a good plugging effect is obtained, and the construction quality of the main structure of the station is ensured.
【作者单位】: 中铁十八局集团第一工程有限公司;
【分类号】:TU94;TU761.11
本文编号:2365566
[Abstract]:In the project, the pipe-hole method of high-pressure grouting is adopted to effectively solve the problem of seepage at the local leakage point, and a good plugging effect is obtained, and the construction quality of the main structure of the station is ensured.
【作者单位】: 中铁十八局集团第一工程有限公司;
【分类号】:TU94;TU761.11
【相似文献】
相关期刊论文 前2条
1 李锡均;深孔高压灌浆下形成铸钻杆原因分析与解决措施[J];勘察科学技术;2003年04期
2 ;[J];;年期