基于任务派工的船舶生产管控模式及应用研究
发布时间:2018-12-09 16:10
【摘要】:为了实现船舶企业现代造船生产任务精细化控制管理,针对我国船舶企业任务派工存在的问题,提出基于任务派工的生产管理控制模式,分析了任务派工的集成模型,详细设计了标准化的任务包和派工单,详述了任务派工流程。开发了任务派工管理系统,并在某船舶企业实际应用中获得良好的效果,为船舶企业生产管理精细化控制提供了参考。
[Abstract]:In order to realize the fine control management of modern shipbuilding production task in shipbuilding enterprises, aiming at the problems existing in task assignment of shipbuilding enterprises in our country, the production management control mode based on task assignment is put forward, and the integrated model of task assignment is analyzed. The standardized task package and assignment order are designed in detail, and the task assignment process is described in detail. The task assignment management system has been developed, and the good effect has been obtained in the practical application of a ship enterprise, which provides a reference for the fine control of production management of the ship enterprise.
【作者单位】: 江苏科技大学经济管理学院;镇江市金舟软件有限责任公司;
【基金】:中国博士后科学基金面上资助项目(2013M540449) 江苏省博士后科研资助项目(1301076C) 江苏省“青蓝工程”优秀青年骨干教师资助项目
【分类号】:U673
本文编号:2369666
[Abstract]:In order to realize the fine control management of modern shipbuilding production task in shipbuilding enterprises, aiming at the problems existing in task assignment of shipbuilding enterprises in our country, the production management control mode based on task assignment is put forward, and the integrated model of task assignment is analyzed. The standardized task package and assignment order are designed in detail, and the task assignment process is described in detail. The task assignment management system has been developed, and the good effect has been obtained in the practical application of a ship enterprise, which provides a reference for the fine control of production management of the ship enterprise.
【作者单位】: 江苏科技大学经济管理学院;镇江市金舟软件有限责任公司;
【基金】:中国博士后科学基金面上资助项目(2013M540449) 江苏省博士后科研资助项目(1301076C) 江苏省“青蓝工程”优秀青年骨干教师资助项目
【分类号】:U673
【相似文献】
相关期刊论文 前9条
1 李进;张裕芳;易宏;马晓平;;基于仿真的造船“中间产品”任务包评价方法[J];中国造船;2008年02期
2 任南;梁冰;王志英;王平;;造船资源管理与配置研究[J];船舶工程;2011年06期
3 劳云朗;黄少飞;;浅析实习工段管理的探索和实践[J];广船科技;2011年02期
4 陆源源;马晓平;朱骏;;后行作业任务包的分解方法[J];造船技术;2013年01期
5 陈民俊,潘斌,刘建峰;应用BP网络测算造船作业任务包定额工时[J];中国造船;2003年02期
6 张志英;江志斌;张军辉;;船舶生产制造执行系统架构[J];上海交通大学学报;2006年02期
7 ;LCS 1近况[J];现代舰船;2010年05期
8 张浩;任南;史恭波;李正华;;采用MWBS的造船工程多层次多项目计划模型及系统研究[J];现代制造工程;2011年10期
9 ;[J];;年期
相关硕士学位论文 前2条
1 钱勇;基于精益生产分段组立任务包物量工时管理系统研究[D];江苏科技大学;2015年
2 张沪俊;基于精益造船制造资源数据库的研究[D];江苏科技大学;2012年
,本文编号:2369666
本文链接:https://www.wllwen.com/kejilunwen/chuanbolw/2369666.html