[Abstract]:The main materials for the main pipeline of nuclear power plant in China are cast austenitic stainless steel (CASS) and forged stainless steel (WSS). According to the SRP3.6.3 of the American Nuclear Regulatory Commission (NRC), a comparative study on the (LBB) evaluation of hard front leakage of the main pipeline was carried out for the main pipeline of CASS and WSS. According to the difference of material properties, the critical crack size is calculated by means of limit load method or J-integral tearing modulus intersection method. According to the Henry uniform non-equilibrium two-phase flow model, the size of the leakage crack is calculated. Through the analysis of the toroidal surface crack and the propagation of the penetrating crack, it is proved that the fatigue propagation of the crack will not lead to the sudden fracture of the pipeline. The results show that WSS has better LBB properties than CASS.
【作者单位】: 武汉工程大学机电工程学院;
【基金】:湖北省教育厅科学研究计划中青年人才项目(Q20151507)
【分类号】:TM623
【相似文献】
相关期刊论文 前10条
1 张磊;冯潇;李明权;王欣;林峰;;核电主管道制造工艺发展[J];锻压技术;2014年06期
2 刘新利;;核电站反应堆冷却剂系统主管道安装焊接[J];中国核电;2011年01期
3 刘f;;AP1000核电冷却剂主管道监造分析[J];中国核电;2013年04期
4 ;世界首套AP1000主管道成功制造并发往用户[J];国防制造技术;2012年02期
5 李靖;王东;章科;;基于主管道自动焊项目的团队协同创新管理[J];中国核电;2012年04期
6 ;我国核电站首次成功应用主管道自动焊工艺[J];国防制造技术;2011年06期
7 蒲小芬,王俭;秦山核电二期工程主管道的设计和安装[J];核动力工程;2003年S1期
8 郑日水;;使命与责任——记海阳核电1号机组主管道施工管理[J];电焊机;2013年08期
9 卢华兴;;AP1000核电站主管道国产化研制进展[J];上海金属;2010年04期
10 ;“核电站主管道自动焊技术”获核能科学技术一等奖[J];金属加工(热加工);2013年12期
相关会议论文 前1条
1 薛飞;余伟炜;怓文新;刘璐;王勇;;二代与三代核电站主管道差异分析及老化管理对策研究[A];2011中国材料研讨会论文摘要集[C];2011年
相关重要报纸文章 前5条
1 记者 程云鹤;鞍钢成功锻造先进核电站主管道锻件[N];鞍山日报;2010年
2 记者 苏大鹏;鞍钢成功锻造先进核电站主管道锻件[N];经济日报;2010年
3 记者 宋阳;国内首个核电自动焊接项目取得成功[N];中国经济导报;2011年
4 本报记者 白晶;AP1000首堆主管道出厂始末[N];中国能源报;2011年
5 记者 朱学蕊;自主ACP1000锻造主管道通过鉴定[N];中国能源报;2013年
相关硕士学位论文 前1条
1 唐龙书;AP1000核电主管道热处理过程温度场、应力场数值模拟[D];南昌航空大学;2014年
,本文编号:2236069
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2236069.html