侧向抽气式窄带状凝汽器布管方案研究
[Abstract]:The condenser of power station is an important part of steam turbine generator set in thermal power plant. The performance of condenser has a great influence on the safety and economy of the whole unit. As the most important part of the condenser, the arrangement of the cooling water tube bundle has an important influence on the heat transfer performance of the whole condenser. This paper focuses on the effect of air cooling zone on the performance of condenser. Firstly, three condenser tube bundles with different air cooling zone shapes are collected and numerically simulated on the commercial software Fluent platform for shell side flow and heat transfer. Their heat transfer performance is analyzed, and then a new type of tube bundle is designed, which is a narrow strip condenser bundle with lateral air extraction. The characteristic of the tube bundle is that the air-cooled zone is located at the bottom of the condenser tube bundle and becomes rectangular. Finally, the excellent performance of the new tube bundle is verified by comparing it with a certain tube bundle under the same conditions. The numerical study of the different aspect ratio in the rectangular air-cooled zone of a new type of tube bundle is also carried out, which is carried out under the condition of keeping the air cooling area, steam parameter, cooling water parameter and total pipe number unchanged. Based on the analysis of the simulation results of various schemes, some suggestions on the ratio of length to width of the rectangular air-cooled zone of the new tube bundle designed in this paper are given. The third part of the work is to set the condenser tube bundle with the condenser design needs matching the circulating water system as the scenario, taking the condenser of a 600MW unit as the research object. The thermodynamic design of condenser is carried out under different circulating water flow velocity, and the results of thermodynamic design under different circulating water flow are obtained. Then, the new tube bundle designed in this paper is used as the tube bundle module, and it is arranged in the condenser shell. A series of condenser products corresponding to different circulating water flows are formed.
【学位授予单位】:上海电力学院
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TM621
【相似文献】
相关期刊论文 前10条
1 金军杭;;西门子百万等级超超临界机组凝汽器结构分析[J];电站辅机;2007年02期
2 罗俊;;凝汽器低真空故障及诊断方法[J];科技经济市场;2007年08期
3 鲍引年;;提高凝汽器管端密封可靠性的方法[J];电业技术通讯;1958年02期
4 宋珊卿;;影响凝汽器管材选用的一些主要因素[J];电力技术;1982年12期
5 石磊;凝汽器管维护管理的改善[J];发电设备;1987年12期
6 杨炳良;;石洞口第二发电厂凝汽器的选型和主要参数确定[J];电站辅机;1991年02期
7 许立国,沈竞为;不锈钢凝汽器管的应用选择[J];山东电力技术;2001年01期
8 郑凤才,安丰波;国内凝汽器现状分析与改造[J];华东电力;2002年03期
9 张家新;;凝汽器严密性对于机组运行的影响及原因分析[J];山西电力;2006年05期
10 吴春燕;李海红;;西门子燃气-蒸汽联合循环机组轴向排汽凝汽器的特点[J];电站辅机;2006年04期
相关会议论文 前9条
1 王强;张广兴;陈二松;;凝汽器管侧泄漏危害及检测方法[A];中国计量协会冶金分会2009年年会论文集[C];2009年
2 金成将;王永平;郭永明;;凝汽器在机组频繁启停状态下的腐蚀与防护[A];第四届火电行业化学(环保)专业技术交流会论文集[C];2013年
3 金成将;王永平;郭永明;;凝汽器在机组频繁启停状态下的腐蚀与防护[A];全国火电300MW级机组能效对标及竞赛第四十二届年会论文集[C];2013年
4 何朝辉;;核电650MW机组凝汽器的技术优化[A];中国核科学技术进展报告(第二卷)——中国核学会2011年学术年会论文集第2册(铀矿冶分卷、核能动力分卷(上))[C];2011年
5 闫光明;孙广建;;凝汽器管束堵管原因分析[A];全国火电600MW机组技术协作会第13届年会论文集[C];2009年
6 朱友;;350MW机组凝汽器不锈钢管化学清洗[A];第四届火电行业化学(环保)专业技术交流会论文集[C];2013年
7 韩传伟;孙加生;;华能济宁电厂100MW机组凝汽器改造[A];全国火电100MW级机组技术交流协作网第一届年会论文集[C];2002年
8 崔北休;;600MW超临界机组凝汽器焊接[A];第四届安徽科技论坛安徽省电机工程学会分论坛论文集[C];2006年
9 陈逢志;胡明涛;;不锈钢管式凝汽器安装工艺探讨[A];第四届数控机床与自动化技术高层论坛论文集[C];2013年
相关硕士学位论文 前10条
1 张鹏;滨海电厂凝汽器阴极保护数值仿真研究[D];广东海洋大学;2015年
2 魏诗善;热电车间汽轮发电机凝汽器节能改造技术经济性分析[D];华南理工大学;2015年
3 李婷婷;火电厂凝汽器(火积)耗散分析[D];华北电力大学;2015年
4 杨亮;基于集成神经网络的凝汽器故障诊断[D];华北电力大学;2015年
5 杨蒋文;侧向抽气式窄带状凝汽器布管方案研究[D];上海电力学院;2016年
6 丁燕;凝汽器动态数学模型及故障诊断系统研究[D];武汉大学;2005年
7 曾硕;核电站凝汽器管束布置优化及研究[D];上海交通大学;2012年
8 曲建丽;电站凝汽器的数值模拟研究与应用[D];山东大学;2007年
9 吴春燕;大型电站凝汽器管束排列优化计算及分析[D];上海交通大学;2010年
10 吴鹏;凝汽器分布参数动态仿真模型研究[D];哈尔滨工程大学;2013年
,本文编号:2276140
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2276140.html