330MW机组协调控制系统优化设计与改造
[Abstract]:The coordinated control system (CCS,Coordinated Control System) provides a reliable guarantee for the safety, stability and economic operation of thermal power units. On the one hand, the coordinated control system makes full use of feedforward, feedback, cascade control and other control techniques to ensure that the unit can meet the requirements of power network load change quickly and maintain the stability of unit parameters when the unit responds to load changes; on the other hand, the coordinated control system makes full use of feedforward, feedback, cascade control and other control techniques. When the unit fails, the coordinated control system can cooperate with the unit protection system to deal with the accident automatically and avoid human error. Generally speaking, the coordinated control system receives the load instruction from dispatch or the operator load instruction, and receives the frequency difference signal of the power network, so that the unit has the ability of peak shaving and frequency modulation. At the same time, the coordinated control system coordinated the supply and demand relationship between boiler and steam turbine, coordinated the control subsystems of the unit, and maintained the stability of the main steam pressure. Based on the DCS transformation project of # 2 unit in Changxing Power Plant, this paper studies the hardware and software of GE Xinhua OC6000e control system, understands the function, working principle, working characteristics of the system, and grasps the related contents of the coordinated control system. The structure, working process and principle of each system of the unit are studied as well as the control methods and optimization methods used in the coordinated control system. Finally, combined with DCS basic performance test, load swing test, fixed value disturbance test, FSSS subsystem debugging test, RB test and so on, the control quality of the unit is tested, through the analysis of test curve and data. The logic configuration and controller parameters of the corresponding system are optimized and modified to improve the reliability of the coordinated control system of the unit.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM621
【参考文献】
相关期刊论文 前10条
1 吴吉;;给水系统控制策略[J];自动化应用;2015年02期
2 吴吉;闵兆俭;肖新;;600MW超临界直流炉机组CCS控制系统分析与应用[J];机电产品开发与创新;2013年02期
3 张瑾哲;马永光;高志存;;300MW机组RUNBACK试验分析[J];电站系统工程;2012年01期
4 朱宝宇;;300MW机组BMS系统优化探讨[J];江西电力;2009年05期
5 庞松涛;李会峰;郑福国;;大型燃煤发电机组风烟系统的经济运行[J];节能与环保;2008年04期
6 姚远;冯新江;;浅谈单元机组的负荷自动控制[J];江西电力职业技术学院学报;2007年02期
7 张秋生;提高机炉协调控制系统AGC响应速率的方法[J];电网技术;2005年18期
8 韩忠旭,黄焕袍,张智,孙颖,吕秀红;基于状态观测器的状态反馈控制在300MW单元机组协调控制系统中的应用[J];中国电力;2004年04期
9 赵志强,秦义;火力发电机组协调控制系统浅析[J];东北电力技术;2002年11期
10 黄延春,赵洪生,吕树祥;350MW机组协调控制系统分析[J];汽轮机技术;2002年05期
相关硕士学位论文 前9条
1 易克难;600MW超临界机组协调控制系统分析与优化设计[D];华北电力大学;2012年
2 张立刚;600MW超临界机组协调控制系统的设计与实现[D];华北电力大学(河北);2010年
3 李冉;超临界机组协调控制策略的优化研究[D];安徽理工大学;2009年
4 马瑞敏;基于Web的报表生成技术研究及其应用[D];重庆大学;2009年
5 霍刚;协调控制系统在黄骅电厂的实践与优化[D];华北电力大学(河北);2008年
6 王东;330MW机组协调控制系统的优化设计与实现[D];华北电力大学(河北);2008年
7 袁利军;300MW机组中压缸启动热应力计算与启动优化[D];华北电力大学(河北);2006年
8 徐文彪;DG670/13.7-4型锅炉燃烧调整及燃烧器改造研究[D];华北电力大学(北京);2004年
9 胡龙华;母管制电厂燃煤锅炉分散控制系统的设计与应用[D];东南大学;2004年
,本文编号:2279571
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2279571.html