大唐同心赖家洼风电场工程造价控制研究
[Abstract]:With the acceleration of energy consumption, the supply of non-renewable energy is becoming increasingly tight. In order to improve the energy structure, reduce the great pressure of energy saving and emission reduction, protect the environment, promote the development and utilization of renewable energy, and realize the sustainable development of economy, the state has formulated a series of supporting policies to encourage the development of renewable energy. It is in this context, wind power ushered in the spring of development. The advantages of wind power, such as no pollution, clean and good economic benefits, are very important to the current social development. However, while facing up to the benign development of wind power, we should also realize that compared with thermal power and hydropower, the cost of wind power generation is high. Big investment, there is still a long way to go from mature technology. Following the benchmark electricity price reduction of 0.02 yuan / k Wh for the onshore wind power project approved in 2015, the National Development and Reform Commission issued in December 2015 a notice on the improvement of the Land Wind Power, Photovoltaic Power Grid benchmark electricity Price Policy (Development and Reform Price [2015] 3044). It is clear that the benchmark price of land wind power in 2016 will continue to be reduced by 0.01-0.02 yuan / k Wh, and 0.02-0.03 yuan / k Wh. in 2018. The reduction of electricity price subsidies has become a clear policy direction, which puts forward higher requirements for reducing the investment cost of wind power projects. At present, the cost control of wind power project has become a key point of wind power project construction. Therefore, it is of great significance for the development and construction of wind power projects in our country to improve the technical level and management level of engineering construction, ensure the quality and duration of the project, and carry out the scientific and reasonable cost control at the same time. The so-called project cost control management means the application of advanced organizational, technical and economic measures in every stage of the project construction, and the control of the project cost within a reasonable investment limit on the basis of the optimization of the design scheme and the construction plan. With the smallest person, money, material resources, obtain the best economic and social benefits. In the process of wind power construction in our country, the phenomenon of out of control of construction cost occurs from time to time. The phenomenon of project cost estimate exceeding estimate, budget exceeding budget estimate and final account exceeding budget seriously affects the benefit of construction project. By reading a large number of research documents on cost control management, the author combines the relevant theories of building economics, computer science, system theory and so on, based on the theory of cost control management. Based on the existing research results of wind farm construction project cost control at home and abroad, this paper makes a scientific and rigorous research and analysis on the whole process of wind farm project construction cost. In this paper, the current situation of research on cost control management of wind farm project at home and abroad is expounded. Taking the project of Tongxin Lai Jiawa wind power project in Datang as an example, the shortcomings of cost control management in the whole process of construction are discussed. The cost budget of each stage of the project construction is analyzed. In view of the existing problems, the countermeasures and guarantee measures are put forward from the point of view of the factors affecting the control and management of the project cost of the wind farm. It is also expected that through the study of the cost control of the Tongxin Lai Jiawa wind power project in Datang, it will be able to sum up the research methods of the accumulated project cost control, broaden the thinking, and build a scientific and reasonable construction project for the same type of wind farm. The effective cost control system can improve the cost control management level of wind farm construction project and reduce the financial risk of project investment.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM614;TU723.3
【相似文献】
相关期刊论文 前10条
1 江眺;水利水电工程设计阶段的造价控制[J];安徽建筑;2001年06期
2 王家胜;谈造价控制在工程设计中的作用[J];工程建设与档案;2003年03期
3 沈浮;《建设工程施工合同》中有关造价控制条款的阐析[J];有色冶金设计与研究;2003年02期
4 王瑞研;造价控制——公路工程的“重头戏”[J];黑龙江交通科技;2005年05期
5 陈新华,赖兆平;高速公路建设造价控制探讨[J];广东公路交通;2005年03期
6 李平;;浅谈设计阶段的造价控制[J];广东建材;2006年08期
7 洪亮;;浅谈如何加强设计阶段的造价控制[J];广东建材;2007年01期
8 冀业;刘锁铁;宋艳霞;;建设工程材料的造价控制[J];科技情报开发与经济;2007年15期
9 毛俊辉;;浅析工程项目全过程的造价控制[J];广东建材;2007年09期
10 周慧朴;;谈监理在施工阶段的造价控制[J];山西建筑;2007年30期
相关会议论文 前10条
1 郭锡斌;;医院工程管理与造价控制[A];2010’全国医院建设大会——贵州省医院建设与发展专题研讨会会刊[C];2010年
2 高林红;;建筑工程的造价控制与管理探讨[A];2013年7月建筑科技与管理学术交流会论文集[C];2013年
3 尹琳琳;彭龙仕;王秀娜;;风险管理视角下海缆敷设工程的造价控制[A];电网工程造价管理优秀论文[C];2011年
4 李延滨;;浅析住宅建设的造价控制[A];现代建设工程应用技术学术交流会论文集[C];2009年
5 彭凌;;浅谈高校房屋设施维修改造项目的造价控制[A];机遇与挑战——北京高校后勤物业管理研究论文集[C];2003年
6 冯松;王波;王兵;;工程建设全过程的造价控制[A];土木工程建造管理:2008年辽宁省土木建筑学会建筑施工专业委员会论文集[C];2008年
7 谢立君;;建筑安装工程施工过程中的造价控制[A];土木工程建造管理:2007年辽宁省土木建筑学会建筑施工专业委员会论文集[C];2007年
8 商伟江;;监理工程师进行造价控制的要点[A];河南省土木建筑学会2008年学术交流会论文集[C];2008年
9 林瑛;;水利工程施工阶段的造价控制探讨[A];2013年7月建筑科技与管理学术交流会论文集[C];2013年
10 董拥军;宋继红;;探析建设项目的造价管理控制[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
相关重要报纸文章 前10条
1 浙江宏成建设集团有限公司 沈昆明 赵永乐 楼赛婷;造价控制应贯穿工程全过程[N];建筑时报;2013年
2 胡俊霞 董毅;北京公司强化电网工程现场造价控制[N];国家电网报;2008年
3 辛凤云;浅谈公路造价控制与管理[N];中华建筑报;2006年
4 上海冲佳电力工程安装有限公司 俞军;工程施工中的造价控制[N];建筑时报;2013年
5 成龙建设集团有限公司 吴锦宏;也谈工程施工阶段的造价控制[N];建筑时报;2011年
6 王晓娟 山西省晋中市水利建筑工程总公司;浅谈水利工程的造价控制[N];晋中日报;2011年
7 李瑾瑜;浅论房地产开发项目的造价控制[N];建筑时报;2004年
8 邱磊 陈存恩 范文龙;优化设计与造价控制[N];建筑时报;2007年
9 浙江舜元建设有限公司 邵渭标邋徐光新 刘风华;工程施工中的造价控制[N];建筑时报;2007年
10 ;工程项目全过程的造价控制和管理[N];财会信报;2011年
相关硕士学位论文 前10条
1 邹英;码头工程设计阶段造价控制评价方法研究[D];大连理工大学;2015年
2 郝然;政府投资中小型项目的造价管理与控制研究[D];大连理工大学;2015年
3 葛建平;EP业主单位工程建设项目造价控制研究[D];北京理工大学;2015年
4 刘双果;黎托公司长沙高铁站安置房项目造价控制研究[D];湖南大学;2015年
5 戴晓倩;西安市园林绿化工程造价控制的应用研究[D];西安建筑科技大学;2015年
6 马瑶;变电站工程前期造价控制及其在X工程的应用[D];山东大学;2016年
7 越光平;大唐同心赖家洼风电场工程造价控制研究[D];吉林大学;2017年
8 王戎;代理业主造价控制的研究与应用[D];重庆大学;2006年
9 党胜利;沈阳工程学院新校区建设造价控制研究[D];吉林大学;2009年
10 袁春林;设计阶段工程造价咨询单位的造价控制研究[D];重庆大学;2008年
,本文编号:2282135
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2282135.html