锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究硕士论文.pdf全文
本文关键词:锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究,由笔耕文化传播整理发布。
成都理工大学
博士学位论文
锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究
姓名:王胜
申请学位级别:博士
专业:地质工程
指导教师:黄润秋
20100601
I
II
Abstract
Analysis on Geological defects and Reinforcement Techonlogy on
Left Bank Resisting Rock of Jinping I Hydropower
Author
brief introduction:
Wang
Sheng,male,born
in Feb.1982,guided
by
Professor Huang Runqiu from Sep. 2007,and will acquire the doctorial degree by Jun.
2010.
Abstract
Dam abutment resisting force body is key parts to maintain stability of arch dam
and its stability is one of the important engineering geology factors in the process of
arch dam construction. What’s more, the dam will failure triggered by deformation
and constitutes a direct threat to normal operation of hydropower stations induced by
the geological defects of abutment will result in the carrying capacity lacking and
weak
deformation
resistance.Therefore,
it has a quite strong practice indirection
meaning to establish a reinforcement treatment system based on geological defects of
dam abutment resisting force body.This paper conducts a research on the geological
defects and reinforcement of the high arch dam abutment base with complicated
geological condition, on the basis of the resistances on the left bank of the Jinping ?
Hydropower. under the guidance of the geologi
本文关键词:锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究,,由笔耕文化传播整理发布。
本文编号:103321
本文链接:https://www.wllwen.com/kejilunwen/diqiudizhi/103321.html