当前位置:主页 > 科技论文 > 地质论文 >

锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究硕士论文.pdf全文

发布时间:2016-08-25 15:23

  本文关键词:锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究,由笔耕文化传播整理发布。


成都理工大学 博士学位论文 锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究 姓名:王胜 申请学位级别:博士 专业:地质工程 指导教师:黄润秋 20100601 I II Abstract Analysis on Geological defects and Reinforcement Techonlogy on Left Bank Resisting Rock of Jinping I Hydropower Author brief introduction: Wang Sheng,male,born in Feb.1982,guided by Professor Huang Runqiu from Sep. 2007,and will acquire the doctorial degree by Jun. 2010. Abstract Dam abutment resisting force body is key parts to maintain stability of arch dam and its stability is one of the important engineering geology factors in the process of arch dam construction. What’s more, the dam will failure triggered by deformation and constitutes a direct threat to normal operation of hydropower stations induced by the geological defects of abutment will result in the carrying capacity lacking and weak deformation resistance.Therefore, it has a quite strong practice indirection meaning to establish a reinforcement treatment system based on geological defects of dam abutment resisting force body.This paper conducts a research on the geological defects and reinforcement of the high arch dam abutment base with complicated geological condition, on the basis of the resistances on the left bank of the Jinping ? Hydropower. under the guidance of the geologi


  本文关键词:锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究,,由笔耕文化传播整理发布。



本文编号:103321

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/diqiudizhi/103321.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户9b3bb***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com