【摘要】:现有关于重调度驱动机制的研究中,周期性重调度、事件驱动重调度以及两者相混合的重调度虽已得到广泛的应用,但周期性重调度缺乏对突发事件的应变能力,与实时工况的耦合性不强,事件驱动的重调度易导致系统计算量过大、增大重调度频率、引起系统震荡,,而混合驱动重调度则很难协调事件驱动与周期驱动之间的关系。因此本课题以加强实时工况与调度系统的耦合性、增强系统稳定性以及最大化企业效益为目标,研究不确定环境下Job Shop制造车间的重调度驱动机制。 首先分析归类Job Shop制造车间生产过程中面临的不确定因素,并通过模糊数学与径向基神经网络相结合的方法,量化其对调度系统的扰动程度;然后通过综合加权相同工序的时间偏差成本、相同工件的相邻工序的时间偏差成本、设备的工作时间偏差成本以及等待时间偏差成本,实现对重调度执行成本的衡量,并以此为基础建立预调度损失函数,同时根据重调度的优化目标建立预调度获益函数,构建损益模型;最后通过对损益模型的定量分析研究,建立基于模糊逻辑的重调度驱动机制,判断重调度的最佳决策点,以此过滤不必要的重调度,解决因频繁重调度而引起的生产系统震荡问题,降低各种不确定性问题给生产系统带来的损失,保证调度系统的有效性与稳定性。
[Abstract]:Although periodic rescheduling, event-driven rescheduling and mixed rescheduling have been widely used in the research of rescheduling drive mechanism, periodic rescheduling lacks the ability to respond to emergencies. The coupling with real-time conditions is not strong, and event-driven rescheduling can easily lead to excessive calculation, increase the frequency of rescheduling and cause system oscillation, while hybrid driven rescheduling is very difficult to coordinate the relationship between event-driven and periodic drive. Therefore, in order to enhance the coupling between real-time operation and scheduling system, enhance the stability of the system and maximize the efficiency of the enterprise, this paper studies the rescheduling driving mechanism of Job Shop manufacturing shop in uncertain environment. Firstly, the uncertain factors in the production process of Job Shop manufacturing workshop are analyzed and classified, and the disturbance degree of the scheduling system is quantified by combining fuzzy mathematics with radial basis function neural network. Then, by synthetically weighting the cost of time deviation of the same working procedure, the cost of time deviation of adjacent processes of the same workpiece, the cost of working time deviation of equipment and the cost of waiting time deviation, the cost of rescheduling execution is measured. On this basis, the loss function of pre-scheduling is established, and the profit function of pre-scheduling is established according to the optimization goal of rescheduling, and the profit and loss model is constructed. Finally, the quantitative analysis of profit and loss model is carried out. The rescheduling driving mechanism based on fuzzy logic is established to judge the optimal decision point of rescheduling so as to filter unnecessary rescheduling and solve the problem of production system shock caused by frequent rescheduling. Reduce the loss of production system caused by various uncertainty problems, and ensure the efficiency and stability of scheduling system.
【学位授予单位】:合肥工业大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:TH186

【参考文献】

相关期刊论文 前10条

1 刘治红,严中青;车间生产管理数字化解决方案[J];兵工自动化;2005年04期

2 顾幸生;不确定性条件下的生产调度[J];华东理工大学学报;2000年05期

3 刘志都;王爱民;;面向车间作业计划与执行同步的动态调度技术[J];计算机工程与应用;2008年16期

4 刘沙;周学功;王颖;王伶俐;;可重构系统在线任务预约重调度算法[J];计算机工程;2011年08期

5 姚锡凡,张毅,董绍强,姚小群;不确定信息的度量及其在制造中的应用示例[J];计算机集成制造系统;2004年11期

6 李琳;江志斌;;虚拟生产系统的自适应动态调度机理及算法[J];计算机集成制造系统;2006年09期

7 乔非;李莉;王遵彤;过纯中;;面向半导体生产的改进的混合重调度策略研究[J];计算机集成制造系统;2007年03期

8 孙志峻,朱剑英,潘全科;基于遗传算法的多资源作业车间智能动态优化调度[J];机械工程学报;2002年04期

9 刘琳;谷寒雨;席裕庚;;工件到达时间未知的动态车间滚动重调度[J];机械工程学报;2008年05期

10 阎长罡,朱子勇,汤武初;Job Shop调度中重调度问题研究[J];机械制造;2005年10期

相关硕士学位论文 前3条

1 石国新;生产调度中不确定因素研究及其定量评价[D];武汉理工大学;2007年

2 单晖;基于实时工况的Job Shop动态随机重调度方法研究[D];合肥工业大学;2008年

3 卢佳;实时工况驱动的Job Shop变权式动态调度理论研究[D];合肥工业大学;2009年



本文编号:1952223

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jixiegongcheng/1952223.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户6dd5c***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com