当前位置:主页 > 科技论文 > 矿业工程论文 >

深井井筒装备快速装配方法研究

发布时间:2018-03-11 14:23

  本文选题:深井井筒 切入点:快速装备 出处:《华北理工大学》2017年硕士论文 论文类型:学位论文


【摘要】:我国煤炭工业发展迅速,新设计煤矿的年产量的增加,千米深的井筒越来越多,矿井规模越来越大,所以深井井筒装备安装装配成为了建井期间的难点和重点。煤矿建设过程中立井井筒装备安装工程是一个重点单位工程,它的危险源多,管理难度大,施工工序复杂,专业性强,工序衔接要求高[1]。井筒装备安装工程在施工以前必须制定施工作业计划和编制安全技术措施,而井筒装备施工作业方案是整个工程施工效果的决定性技术保证,是在整个工程开始施工之前应该完成的关键准备工作,施工方案制定的合理、有针对性,可以在施工前消除危险源,使施工方案与施工区域的恶劣条件相适应,最大限度的保护施工人员的安全,保证工程质量、保证施工进度的正常推进。当前井筒装备安装施工工艺在技术革新的浪潮推动下得到充分发展,但是千米井筒装备安装工艺相对比较落后,因此我们总结一批先进的施工工艺,记录了当前施工方案的最新动向,积极借鉴、吸收同行业的先进之处,探索新材料的投入,大胆替换旧有设备,创新了一批新的施工工艺指导施工。我们在施工方法制定、施工设备选择及搭配、管理资源配置、技术工艺创新,做到具有先进性、科学性和可操作性,解决当前施工工艺落后与快速建井施工需求的矛盾。
[Abstract]:With the rapid development of the coal industry in our country, the annual output of the newly designed coal mines has increased, and there are more and more boreholes with a kilometer depth, and the scale of the mines is becoming larger and larger. Therefore, installation and assembly of deep shaft equipment has become a difficult and important point during well building. In the process of coal mine construction, the installation of vertical shaft equipment is a key unit project, which has many dangerous sources, great difficulty in management, and complex construction procedure. The installation project of wellbore equipment must draw up construction operation plan and draw up safety technical measures before construction, and the construction plan of wellbore equipment is the decisive technical guarantee for the construction effect of the whole project. It is the key preparatory work that should be completed before the whole project begins construction. The construction plan has been formulated reasonably and pertinently, which can eliminate the dangerous sources before construction and adapt the construction plan to the bad conditions in the construction area. To maximize the protection of the safety of construction personnel, to ensure the quality of the project, and to ensure the normal progress of construction. At present, the installation and construction process of wellbore equipment has been fully developed in the light of the tide of technological innovation. However, the installation process of kilometer shaft equipment is relatively backward. Therefore, we sum up a number of advanced construction techniques, record the latest trend of the current construction plan, actively draw lessons from and absorb the advanced aspects of the same industry, and explore the input of new materials. Bold replacement of old equipment, innovation of a number of new construction technology to guide construction. We in the construction method formulation, construction equipment selection and collocation, management of resources, technological innovation, to have advanced, scientific and operational, To solve the contradiction between the backwardness of current construction technology and the requirement of rapid well construction.
【学位授予单位】:华北理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD262.4

【参考文献】

相关期刊论文 前10条

1 宗永宏;;凿井绞车集中控制技术应用[J];能源技术与管理;2014年05期

2 刘建超;;吊盘稳盘装置的研究及应用[J];中州煤炭;2013年11期

3 罗德刚;余波;张德强;;凿井绞车集中控制在立井井筒施工中的应用[J];科技与企业;2013年05期

4 李涛;赖泽金;彭星新;徐支松;刘志强;许大晴;;超深立井凿井吊盘结构设计研究[J];建井技术;2012年02期

5 周宗恒;杨凯华;刘挺进;;通线通尺测量方法在井筒装备工程中的应用[J];中州煤炭;2011年11期

6 刘顺业;;关于煤矿机电设备安装[J];科技传播;2011年16期

7 陈锋;;联锁保护装置在双凿井绞车提升吊盘中的应用[J];能源技术与管理;2011年03期

8 曾凡彪;王正超;高秋野;;杨营矿井主井井筒装备设计[J];山东煤炭科技;2010年04期

9 高红旗,孙跃安,陈振络;树脂锚杆固定立井井筒装备施工模具盘的改进[J];中州煤炭;1997年06期

10 李清云;立井井筒装备施工方法探讨[J];煤;1996年02期



本文编号:1598553

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/1598553.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户04363***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com