当前位置:主页 > 科技论文 > 矿业工程论文 >

基于MODFLOW对敏东二矿矿井涌水量预测研究

发布时间:2018-04-10 15:01

  本文选题:涌水量 + 伊敏组 ; 参考:《河北工程大学》2015年硕士论文


【摘要】:研究区位于伊敏河东区探矿权范围以内的北部,井田面积约116.5km2。本文以水文地质学、地下水动力学理论为指导,结合内蒙古海拉尔区域地质资料,通过抽水试验、水质分析与沉积分析等手段,对伊敏河东煤田含水层与隔水层划分及其空间展布格局与水文地质条件及富水性特征进行研究,并对矿井涌水量进行了预测。本文将研究区域划分为两个主要的含水层组:第四系孔隙含水层和白垩系伊敏组煤系地层含水层,其中白垩系伊敏组煤系地层含水层又进一步划分为15煤层上部含水层、15煤层间含水层、16煤层上部含水层、16煤层间含水层。各含水层富水性大部分较强,上部隔水层不均匀,隔水效果较差。其中白垩系伊敏组煤系地层含水层中的15煤层含水层为本次研究的重点含水层,其上覆的14煤层隔水层和第四系隔水层分布不均匀,存在水头差,有天窗和边缘补给;其下伏的15煤层隔水层,分布均匀,富水性弱,为良好的隔水层。论文在水文地质条件分析成果的基础上,概化出敏东二矿的水文地质概念模型,建立出与水文地质概念模型相适应的数学模型,最后用Visual Modflow进行数值模拟,计算出第一水平矿井正常涌水量为1943 m3/h,最大涌水量为2137 m3/h;先期开采地段正常涌水量为1757m3/h,最大涌水量为1933 m3/h。根据数值模拟结果对矿井开采疏干排水方案做出了建议。
[Abstract]:The study area is located in the northern part of Yimin Hedong District, with an area of 116.5 km ~ 2.Guided by the theory of hydrogeology and groundwater dynamics, combined with the regional geological data of Hailar, Inner Mongolia, the paper adopts pumping test, water quality analysis and sediment analysis, etc.This paper studies the division of aquifer and aquifer, spatial distribution pattern, hydrogeological conditions and water-rich characteristics in the east coal field of Yimin River, and forecasts the mine water discharge.In this paper, the study area is divided into two main aquifer groups: Quaternary pore aquifer and Cretaceous Yimin coal series aquifer.The coal measure aquifer of the Cretaceous Yimin formation is further divided into 15 coal seam upper aquifer, 15 coal seam aquifer, 16 coal seam upper aquifer and 16 coal seam aquifer.Most of the aquifers are rich in water, the upper layer is not uniform, and the effect of water insulation is poor.The 15 coal bed aquifer in the coal measure aquifer of the Cretaceous Yimin formation is the key aquifer in this study. The 14 coal seams and the Quaternary water-isolated strata are unevenly distributed, and there are water head difference, skylight and marginal recharge.Its underlying 15 coal seams have uniform distribution and low water content, which is a good waterproof layer.Based on the results of hydrogeological condition analysis, this paper generalizes the conceptual model of hydrogeology in Mindong No.2 Mine, and establishes a mathematical model suitable to the conceptual model of Hydrogeology. Finally, the numerical simulation is carried out with Visual Modflow.It is calculated that the normal discharge of the first level mine is 1943 m3 / h, the maximum discharge is 2137 m3 / h, and the normal inflow of the first mining area is 1 757 m3 / h, the maximum discharge is 1933 m3 / h.According to the results of numerical simulation, the drainage scheme of mine mining is suggested.
【学位授予单位】:河北工程大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:P641.41

【参考文献】

相关期刊论文 前10条

1 孙从军;韩振波;赵振;范宇;;地下水数值模拟的研究与应用进展[J];环境工程;2013年05期

2 陈孟利;秦勇光;刘文连;龚宪伟;韦立德;;氟在浅层地下水系统中迁移的有限元法模拟[J];中国农村水利水电;2011年09期

3 王浩;陆垂裕;秦大庸;桑学锋;李扬;肖伟华;;地下水数值计算与应用研究进展综述[J];地学前缘;2010年06期

4 薛禹群;;中国地下水数值模拟的现状与展望[J];高校地质学报;2010年01期

5 张二勇;李长青;李旭峰;;区域地下水流数值模拟的方法和实践——以华北平原为例[J];中国地质;2009年04期

6 华解明;;“大井法”预测矿井涌水量问题探讨[J];中国煤炭地质;2009年06期

7 李红军;王旭;;基于有限元法的滑坡地下水渗流场模拟分析[J];西部探矿工程;2009年05期

8 马洪超;林立新;;大井法预测矿坑涌水量[J];采矿技术;2009年02期

9 陈酩知;刘树才;杨国勇;;矿井涌水量预测方法的发展[J];工程地球物理学报;2009年01期

10 束龙仓;王茂枚;刘瑞国;陈国浩;;地下水数值模拟中的参数灵敏度分析[J];河海大学学报(自然科学版);2007年05期



本文编号:1731697

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/1731697.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户87a9d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com