【摘要】:柔模流体充填留巷技术是在利用风积砂流体充填采空区的同时,通过设置巷道侧向支挡结构,保留进入巷道,为下一工作面服务。该技术属于无煤柱开采技术,是我国煤矿科技方面取得的又一重大创新成果,具有巨大的技术和经济优势,值得推广。研究柔模流体充填留巷围岩的稳定性对减少巷道掘进量、进一步提高煤炭采出率具有重要意义。本文以榆阳煤矿2307流体充填留巷工作面为背景,采用理论分析、室内试验、数值模拟等综合研究手段,主要结论如下:(1)在分析柔模流体充填采煤及充填留巷工艺的基础上,对充填材料力学特性的影响因素进行试验研究,得到风积砂含量对充填体7d强度影响显著,粉煤灰细度对充填体28d强度影响显著,同时柔模作用下能够提高充填体强度及弹性模量。(2)根据流体充填留巷覆岩仅弯曲下沉而无破断的规律,建立了流体充填留巷力学模型,分别求出顶板下沉量、煤帮竖向应力峰值的解析方程式,并得到了不同因素条件下顶板下沉量的影响曲线,同时分析了巷旁充填体的稳定性,确定出了充填体地基系数km、强度及欠接顶量U为充填留巷稳定性的控制因素。(3)通过对柔模流体充填留巷进行的三维数值模拟结果进行分析,得到了不同充填体强度和不同充填率条件下充填留巷围岩应力分布、塑性区分布及变形量变化的特征,分析得到充填体强度越小,充填留巷顶底板移近量越大,确定充填体强度应大于等于4MPa;充填率越小,留巷围岩变形量越小,并确定充填率应大于等于95%。(4)结合榆阳煤矿2307流体充填留巷现场试验,充填体28d强度为4MPa,弹性模量为1.26GPa,充实率达到95%以上,巷内采用锚网索支护,通过对现场监测数据进行整理和分析可知,柔模流体充填留巷围岩结构稳定,满足要求。
[Abstract]:The technology of flexible formwork fluid filling and retaining roadway is to use aeolian sand fluid to fill goaf at the same time, through setting roadway lateral retaining structure, reserving into roadway, serving for the next working face. This technology belongs to coal pillar free mining technology and is another important innovation achievement in coal mine science and technology of our country. It has huge technical and economic advantages and is worth popularizing. It is of great significance to study the stability of surrounding rock of roadway filled with flexible formwork to reduce the tunneling quantity and to further improve the coal mining rate. Based on the background of 2307 fluid filling roadway face in Yuyang Coal Mine, this paper adopts comprehensive research methods such as theoretical analysis, laboratory test and numerical simulation. The main conclusions are as follows: (1) on the basis of analysis of flexible fluid filling coal mining and filling roadway technology, The factors influencing the mechanical properties of filling materials are studied. The results show that the content of aeolian sand has a significant effect on the 7 d strength of the filling body, and the fineness of fly ash has a significant effect on the 28 d strength of the filling body. At the same time, under the action of flexible die, the strength and elastic modulus of the filling body can be improved. According to the rule that the overburden rock in the roadway with fluid filling only bends and sinks without breaking, the mechanical model of fluid filling retaining roadway is established, and the settlement of roof is calculated respectively. The analytical equation of the peak vertical stress of coal side is obtained, and the influence curve of roof subsidence under different factors is obtained, and the stability of backfill beside roadway is analyzed at the same time. It is determined that the foundation coefficient km, the strength and the underconnected roof value U are the controlling factors for the stability of the filling and retaining roadway, and the results of three-dimensional numerical simulation of the flexible mold fluid filling and retaining roadway are analyzed. The characteristics of stress distribution, plastic zone distribution and deformation change in surrounding rock of backfill roadway under different filling strength and different filling rate are obtained. The analysis shows that the smaller the strength of backfill body is, the greater the displacement of roof and bottom slab is. It is determined that the strength of the filling body should be greater than or equal to 4MPa, the smaller the filling rate, the smaller the surrounding rock deformation of the roadway, and the determination that the filling rate should be greater than or equal to 95. 4) combined with the field test of 2307 fluid filling roadway in Yuyang Coal Mine, The filling body has a 28d strength of 4MPa, elastic modulus of 1.26GPaand enrichment rate of more than 95%. The anchor mesh and cable support is used in the roadway. Through sorting and analyzing the field monitoring data, it can be seen that the surrounding rock structure of the roadway left by flexible formwork fluid filling is stable and meets the requirements.
【学位授予单位】:西安科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TD322.4

【相似文献】

相关期刊论文 前10条

1 邓代强,姚中亮,唐绍辉,杨耀亮;充填体单轴压缩韧性性能试验研究[J];矿业研究与开发;2005年05期

2 许文远;杨小聪;郭利杰;;充填体不均匀性相似模拟实验研究[J];金属矿山;2011年05期

3 G.D.Aitchison;M.Kurzeme;D.R.Willoughby;;矿山充填体的地质力学因素 第一部分:充填体设计的合理方法[J];有色矿山;1976年Z1期

4 ;矿山充填体的地质力学因素 第二部分:充填体反应机理的研究[J];有色矿山;1976年Z1期

5 薛奕忠;安庆铜矿高阶段矿房充填体稳定性的探讨[J];有色矿山;1998年05期

6 胡华,崔明义;高水材料硬化体特性及其充填体力学作用机理分析[J];矿业研究与开发;2001年05期

7 王正辉;充填体的质量与控制[J];采矿技术;2001年03期

8 刘志祥,李夕兵;爆破动载下高阶段充填体稳定性研究[J];矿冶工程;2004年03期

9 罗建祥;影响胶结充填体强度的因素分析[J];甘肃冶金;2005年02期

10 胡飞宇;;安庆铜矿特大型采场充填体稳定性数值模拟研究[J];有色金属(矿山部分);2006年03期

相关会议论文 前3条

1 刘鹏博;樊忠华;明世祥;;充填体支撑矿柱的作用机理研究[A];2011年中国矿业科技大会论文集[C];2011年

2 贝建刚;;采场充填体稳定性理论分析与改进措施[A];晋琼粤川鲁冀辽七省金属(冶金)学会第二十一届矿业学术交流会论文集[C];2014年

3 孙恒虎;刘文永;杨宝贵;刘华生;;高水固结充填技术的应用研究与进展[A];第六届全国采矿学术会议论文集[C];1999年

相关重要报纸文章 前4条

1 范建峰;二矿区“一线工作法”提升工作效率[N];金昌日报;2008年

2 李建东;解决井下充填水分流难题[N];金昌日报;2008年

3 李兴文;江铜东同矿业实现采充平衡[N];中国矿业报;2006年

4 记者 刘泽民 通讯员 盛佳;长沙矿山院两项目达国际先进水平[N];中国有色金属报;2014年

相关博士学位论文 前9条

1 张强;固体充填体与液压支架协同控顶机理研究[D];中国矿业大学;2015年

2 李贞芳;中关铁矿大水下充填开采充填体围岩匹配及沉降控制[D];中国矿业大学(北京);2016年

3 庞奇志;矿柱回收过程充填体与围岩稳定性及安全监控研究[D];中国地质大学;2016年

4 韩斌;金川二矿区充填体可靠度分析与1#矿体回采地压控制优化研究[D];中南大学;2004年

5 姚振巩;矿山充填体作用机理与铝基复合充填胶凝材料研究[D];中南大学;2010年

6 刘志祥;深部开采高阶段尾砂充填体力学与非线性优化设计[D];中南大学;2005年

7 吴锐;综放巷内预充填无煤柱掘巷围岩结构演化规律与控制技术[D];中国矿业大学;2014年

8 江文武;金川二矿区深部矿体开采效应的研究[D];中南大学;2009年

9 朱和玲;松软破碎型复杂矿体开采技术优化与过程控制研究[D];中南大学;2014年

相关硕士学位论文 前10条

1 冯超;柔模流体充填留巷围岩稳定性研究[D];西安科技大学;2015年

2 贺发远;金川二矿区充填体质量与成本控制的研究[D];昆明理工大学;2005年

3 周士霖;深部开采充填体稳定性及与岩体智能匹配研究[D];中南大学;2012年

4 吴祥辉;胶结充填体强度模型与应用研究[D];昆明理工大学;2013年

5 李洋;煤矿充填离析规律与充填体合理强度设计[D];青岛理工大学;2014年

6 兰文涛;充填体碳化及其机理研究[D];山东理工大学;2014年

7 赵龙;浆体膨胀材料充填体的流变性能研究[D];山东理工大学;2015年

8 周华林;空场嗣后充填采矿法充填体合理强度分布规律研究[D];武汉理工大学;2012年

9 董凯程;爆破地震对充填体影响与控制技术研究[D];中南大学;2010年

10 王丹;东同V号矿体充填体下阶段矿柱稳定性分析[D];江西理工大学;2015年



本文编号:1942603