大采高综采成套设备自动化系统的研究
本文选题:自动化 + 分布式控制系统理 ; 参考:《辽宁工程技术大学》2017年硕士论文
【摘要】:随着全球资源供给和环境压力的突出,在煤炭行业转型过程中,生产环节更多的使用自动化的投入和应用必不可少。本文针对煤矿综采自动化技术在7米采高综采工作面实践应用问题,分析综采成套技术与装备发展现状,提出了利用分布式控制系统理念将综采工作面的采煤机、液压支架及泵站的自动化应用及数据采集单独设计,数据由各分站集中汇总,最后统一监测控制,并通过矿用工业以太网将井下工作面生产信息实时传送至地面监控主站,实现井上井下信息一体化。论文分析了采煤机老式通讯控制系统与新式通讯控制系统的优劣,针对采煤机的控制及数据采集环节硬件进行了技术选型,阐明了采煤机的通讯控制系统的整体逻辑关系,详细的对7米采高采煤机的自动割煤逻辑进行分析并给出滚筒高度补偿方案。针对液压支架,简单的介绍了支架端头站与集控台的通讯方式原理,对于支架的监测数据提出了实际应用方案并提出了自动化执行操作过程的优化流程方案以节省生产时间,提高生产效率。最后章节对整个数据采集控制系统的程序及组态设计进行了简单的介绍并进行了应用分析。所得研究结论对于合理设计综采工作面采煤机等设备控制系统、改善设备工作性能和提高生产效率由重要的意义和参考价值。
[Abstract]:With the global resource supply and environmental pressure outstanding, in the coal industry transformation process, the production links more use of automation input and application is essential. Aiming at the practical application of fully mechanized coal mining automation technology in 7 meters mining face, this paper analyzes the present situation of the development of fully mechanized mining complete sets of technology and equipment, and puts forward the idea of applying distributed control system to fully mechanized coal mining face. The automatic application and data acquisition of hydraulic support and pump station are designed separately. The data are collected by each sub-station, and the monitoring and control are unified, and the underground working face production information is transmitted to the ground monitoring main station in real time through the mining industry Ethernet. The integration of downhole information is realized. The paper analyzes the advantages and disadvantages of the old communication control system and the new communication control system of the shearer, selects the hardware for the control and data acquisition of the shearer, and expounds the overall logic relation of the communication control system of the shearer. This paper analyzes the automatic cutting logic of 7 m shearer in detail and gives the compensation scheme of drum height. Aiming at the hydraulic support, the principle of communication between the terminal station of the support and the centralized control station is simply introduced, and the practical application scheme for the monitoring data of the support is put forward, and the optimization flow scheme of the automatic operation process is put forward to save the production time. Improve production efficiency. In the last chapter, the program and configuration design of the data acquisition and control system are introduced and applied. The research conclusions are of great significance and reference value for the rational design of the control system of fully mechanized coal mining face and other equipment, improving the working performance of the equipment and increasing the production efficiency.
【学位授予单位】:辽宁工程技术大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD421.8
【参考文献】
相关期刊论文 前9条
1 商海峰;;基于工业以太网与现场总线的选煤厂综合自动化系统的设计[J];煤炭加工与综合利用;2010年06期
2 伍龙;吴永祥;邢丽坤;;基于以太网的嵌入式煤矿井下电力安全监控系统研究[J];煤炭工程;2010年12期
3 景兴鹏;王伟峰;成连平;姬文龙;;矿井安全无线监控系统的研究[J];煤炭工程;2010年02期
4 张国盛;林安栋;;矿井监测监控系统的发展历史及趋势[J];煤炭技术;2009年02期
5 章程;程文明;肖建军;;基于Modbus协议的PC机与S7-200PLC的串行通信[J];机械工程与自动化;2008年03期
6 王文星;张旭;杜春玲;孟国营;;基于薄煤层综采工作面支架控制单元的研究[J];中国矿业;2008年06期
7 李海东;煤矿自动化的现状与发展[J];煤矿现代化;2005年05期
8 彭立军,龚富堂,李建森;森透里昂600型监测监控系统浅析[J];山西煤炭;2003年01期
9 郑洁,串禾;MOSFET 开关的驱动[J];电力电子技术;1998年01期
相关硕士学位论文 前10条
1 叶杨婷;基于PROFIBUS-DP和CAN的多现场总线接口转换器的设计与实现[D];武汉科技大学;2009年
2 冯志超;基于PLC与组态软件的船舶锅炉监控系统[D];大连海事大学;2008年
3 汤申波;矿山应急救援环境检测子系统研究与实现[D];西安科技大学;2008年
4 黄公平;矿井综合自动化系统的设计与实施[D];北京邮电大学;2007年
5 秦海涛;基于CAN总线和无线传输技术的矿井瓦斯监测系统关键技术研究[D];中北大学;2007年
6 齐军;井下工况状态监测系统研究[D];哈尔滨工程大学;2007年
7 谭威;基于PLC的工业控制系统的设计与实现[D];华中科技大学;2007年
8 章丽芙;PLC自动控制综合实验系统设计[D];东南大学;2006年
9 黄国庆;基于现场总线的智能电量变送器[D];南昌大学;2005年
10 薛菲;现场总线热电偶温度检测装置的研制[D];武汉大学;2004年
,本文编号:1994995
本文链接:https://www.wllwen.com/kejilunwen/kuangye/1994995.html