  本文选题:大采高综采 + 顶板断裂 ; 参考:《太原理工大学》2017年硕士论文


【摘要】:随着厚煤层综采技术的不断发展,以及大采高综采设备的不断推陈出新,大采高综采工作面支架-围岩关系的研究逐渐成为人们关注的焦点。厚煤层大采高综采条件下,具有采场开采空间大、岩层垮落范围增大、工作面发生支架压死或支架损坏的事故率高的特点,因此研究液压支架与顶板围岩间的相互作用关系,对保证厚煤层矿井安全生产具有重要的现实意义。首先,本文通过现场实测和数值模拟(FLAC3D)相结合的手段,对大采高综采工作面的矿压显现特征进行了分析。通过对上湾矿12401大采高综采工作面的矿压观测,可知大采高综采条件下周期来压步距比较小,通过FLAC3D数值模拟发现大采高综采条件下顶板的应力出现明显增加,超前支承压力的峰值也出现明显增加。其次,通过理论分析与数值模拟(UDEC)相结合的方法,建立力学模型对大采高综采工作面顶板的断裂运动进行了研究。根据薄板理论分别建立了大采高综采顶板初次破断、顶板周期破断力学模型,分别推导了对应模型的挠曲面方程;结合工程概况运用UDEC软件建立了平面应变模型,对大采高综采工作面上部岩层的破断运移进行了模拟分析。然后,结合围岩与支架相互作用机理理论分析和开采期间对现场初撑力和循环末阻力的实测统计,对大采高综采工作面支架-围岩的适应性进行了研究。其中围岩与支架作用机理分析包括支架围岩系统刚度分析和支架围岩力学模型分析,得到了围岩-支架维持稳定的三个基本条件;现场实测统计表明,液压支架循环末阻力与初撑力呈正比线性关系,支架初撑力越大,循环末阻力越大。最后,对大采高支架载荷特性进行了分析,然后利用FLAC3D对液压支架主要零部件进行了建模、组装;最后对支架结构进行了优化分析。
[Abstract]:With the continuous development of fully mechanized mining technology in thick coal seam and the continuous innovation of large-height fully mechanized mining equipment, the research on the relationship between support and surrounding rock in large-height fully mechanized mining face has gradually become the focus of attention. Under the condition of large mining height in thick coal seam, it has the characteristics of large mining space in stope, enlarged falling range of rock, high accident rate of crushing dead or damaged support in working face, so the interaction relationship between hydraulic support and roof surrounding rock is studied. It has important practical significance to ensure the safety production of thick coal seam mine. Firstly, through the combination of field measurement and numerical simulation (FLAC3D), this paper analyzes the characteristics of mine pressure behavior in a fully mechanized mining face with large mining height. Based on the observation of mine pressure in 12401 fully mechanized mining face of Shangwan Coal Mine, it can be seen that under the condition of large mining height fully mechanized mining, the interval of periodic pressure step is relatively small, and the roof stress under the condition of high mining height is obviously increased by FLAC3D numerical simulation. The peak value of leading support pressure also increases obviously. Secondly, through the combination of theoretical analysis and numerical simulation (UDEC), a mechanical model is established to study the roof fracture movement of fully mechanized mining face with large mining height. According to the theory of thin plate, the mechanics models of first breaking and periodic breaking of roof in fully mechanized mining with large mining height are established, and the flexural surface equations of corresponding model are derived respectively, and the plane strain model is established by UDEC software combined with the general situation of engineering. The fracture migration of the upper strata of the fully mechanized mining face with large mining height is simulated and analyzed. Then, based on the theoretical analysis of the interaction mechanism between surrounding rock and support and the statistics of the field initial support force and the circulating end resistance during mining, the adaptability of the brace-surrounding rock in the fully mechanized mining face with large mining height is studied. The analysis of the interaction mechanism between the surrounding rock and the support includes stiffness analysis of the surrounding rock system and mechanical model analysis of the surrounding rock of the support, and three basic conditions for the maintenance of the stability of the surrounding rock and the support are obtained. The end resistance of hydraulic support is proportional to the initial support force, and the greater the initial support force is, the greater the end cycle resistance is. Finally, the load characteristics of large mining support are analyzed, and the main components of hydraulic support are modeled and assembled by FLAC3D. Finally, the structure of the support is optimized and analyzed.
【学位授予单位】:太原理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD323;TD355

【相似文献】

相关期刊论文 前10条

1 王继明;;世界首个7m大采高综采面投产[J];煤炭工程;2010年02期

2 ;世界首个7m大采高综采面投产[J];煤矿开采;2010年01期

3 张金耀;;大采高综采技术在三交河煤矿的实践与应用[J];山西焦煤科技;2009年05期

4 袁永;屠世浩;王瑛;马小涛;吴其;;大采高综采技术的关键问题与对策探讨[J];煤炭科学技术;2010年01期

5 易伟明;;浅论大采高综采技术[J];民营科技;2010年08期

6 王朝阳;大采高综采高产高效工艺及配套技术研究通过技术鉴定[J];河北煤炭;1996年01期

7 何富连,钱鸣高,赵庆彪,尚多江;高产高效大采高综采技术的研究与实践[J];阜新矿业学院学报(自然科学版);1997年01期

8 张友林;侯正利;李兴柱;;玉华矿4~(-2)煤层大采高综采可行性研究[J];山东煤炭科技;2013年05期

9 惠本利;;深部矿井厚煤层超大采高综采技术研究展望[J];煤炭科学技术;2014年04期

10 谢伟;;煤矿大采高综采技术的实践和应用[J];中国高新技术企业;2014年19期

相关会议论文 前10条

1 韩振先;;关于厚煤层大采高综采技术问题及措施研究[A];第七届全国煤炭工业生产一线青年技术创新文集[C];2012年

2 司荣军;;大采高综采煤层塑性区宽度的确定方法[A];中国煤炭学会煤矿安全专业委员会2009年学术研讨会交流论文(部分)[C];2009年

3 刘建功;赵庆彪;祁泽民;;5.0m大采高综采集约高效技术集成研究[A];全国大型煤炭企业综采技术发展成果集[C];2010年

4 杨智文;石永奎;刘文;;大同“两硬”条件下大采高综采技术研究[A];全国煤矿复杂难采煤层开采技术[C];2012年

5 轩涛;;兖州矿区复杂条件大采高综采设备配套浅析[A];第六届全国煤炭工业生产一线青年技术创新文集[C];2011年

6 魏民涛;王建树;;“三软”高承压水厚煤层大采高综采技术[A];煤炭开采新理论与新技术——中国煤炭学会开采专业委员会2006年学术年会论文集[C];2006年

7 贾川;何维胜;;羊场湾煤矿大采高综采大倾角仰斜开采技术研究[A];全国煤矿复杂难采煤层开采技术[C];2012年

8 魏民涛;刘军;王建树;;马丽散固化技术在“三软”突出厚煤层大采高综采中的应用[A];煤炭开采新理论与新技术——中国煤炭学会开采专业委员会2007年学术年会论文集[C];2007年

9 肖大军;;黄陵二号煤矿大采高综采设备选型配套[A];安全高效矿井机电装备及信息化技术——陕西省煤炭学会学术年会论文集(2011)[C];2011年

10 王家臣;张剑;姬刘亭;郑厚发;;“两硬”条件大采高综采老顶初次垮落力学模型研究[A];东北岩石力学与工程分会学术讨论会论文集[C];2005年

相关重要报纸文章 前4条

1 魏国军 杨新保;获奖的“大采高综采技术”[N];中国矿业报;2011年

2 王继明;世界首个7米大采高综采面投产[N];中国煤炭报;2010年

3 王俊;“山东第一架”试用成功[N];中国煤炭报;2008年

4 记者 樊晋铁 通讯员 白跃新;我省又一科研成果达到国际领先水平[N];山西经济日报;2011年

相关博士学位论文 前2条

1 吴凤东;大海则煤矿大采高综采技术适应性研究[D];北京科技大学;2016年

2 朱涛;软煤层大采高综采采场围岩控制理论及技术研究[D];太原理工大学;2010年

相关硕士学位论文 前6条

1 王威;大采高综采面运输巷自移式超前支架支护研究[D];西安科技大学;2015年

2 赵奇;长平矿大采高综采面矿压显现规律及围岩控制技术研究[D];辽宁工程技术大学;2014年

3 刘小明;羊场湾煤矿大采高综采工艺设备确定与应用[D];西安科技大学;2011年

4 刘兴滨;软煤层大采高综采围岩控制技术研究[D];太原理工大学;2010年

5 刘艳辉;大采高综采和综放工作面矿压显现特征的对比研究[D];河南理工大学;2012年

6 郭爱伟;大采高综采面压裂煤层煤壁稳定性研究[D];西安科技大学;2017年



本文编号:2076895

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/2076895.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f2af8***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com