主运输巷保安矿柱安全高效回采实践
本文选题:保安矿柱 + 阶段空场嗣后充填法 ; 参考:《矿业研究与开发》2017年11期
【摘要】:受中段主运输巷穿插,北阿尔登-托普坎铅锌矿10中段5a矿体前期回采留设有20 m宽保安矿柱。受采空区及不规范回采影响,该保安矿柱回采难度大。经技术经济比较分析,选择采用分段凿岩阶段空场嗣后充填法回采该矿柱,工业实践中,采场综合生产能力达375t/d,损失率10.43%,贫化率10%,安全高效采出高品位矿石45000t。
[Abstract]:By the main transport roadway in the middle section, there are 20 m wide security pillars in the early stage of the 5a ore body in the 10 middle section of the North Alden-Topquin Pb-Zn Mine. Under the influence of goaf and non-standard mining, it is difficult to recover the safety pillar. Through the comparative analysis of technology and economy, the stoping pillar is selected to be mined by the method of subsequent backfilling in the stage of segmented rock drilling. In industrial practice, the comprehensive production capacity of the stope is up to 375 t / d, the loss rate is 10.43%, the dilution rate is 10%, and the high grade ore is produced safely and efficiently for 45000t.
【作者单位】: 长沙矿山研究院有限责任公司;国家金属采矿工程技术研究中心;
【分类号】:TD853.391
【相似文献】
相关期刊论文 前10条
1 B.A.舍什塔科夫;黄启明;;保留保安矿柱损失的评价[J];国外采矿技术快报;1985年14期
2 周正濂;子彦;;缩小水体下保安矿柱尺寸的方法[J];世界采矿快报;1988年24期
3 王志方;竖井稳定性与保安矿柱开采[J];有色矿冶;1993年06期
4 王宏伟,王志方;用“安全深度”对竖井矿柱的圈定与开采[J];化工矿山技术;1994年05期
5 王志方,张合君;探讨保安矿柱回收相关问题[J];有色矿冶;1997年02期
6 王洪江,路东尚,熊伟,刘振东,马天贵,李金奎;竖井保安矿柱回收试验研究[J];黄金;2002年05期
7 金小田,金世伦,谢世禄,张世斌;缓倾斜薄矿体保安矿柱的回收[J];中国矿业;2004年06期
8 宋卫东;陈志海;郭廖武;唐国友;;程潮铁矿保安矿柱控制开采相似模拟实验研究[J];矿业研究与开发;2009年04期
9 杨小平;祝禄发;于水;;重要建(构)筑物下保安矿柱开采试验研究[J];采矿技术;2012年05期
10 M.H.崔加罗夫;王维德;;戈罗布拉哥达特矿床保安矿柱的回采工艺[J];国外采矿技术快报;1987年21期
相关会议论文 前2条
1 李胜辉;杨闯;范天文;王靖;;司家营铁矿平青大公路保安矿柱开采方法的研究[A];第十八届川鲁冀晋琼粤辽七省矿业学术交流会论文集[C];2011年
2 曹明秋;钟纪胜;曾德华;;锡矿山南炼厂保安矿柱342巷道爆破参数探讨[A];2005年全国金属矿山采矿学术研讨与技术交流会论文集[C];2005年
,本文编号:2105025