义煤综能公司煤制气项目进度控制和质量管理
发布时间:2018-07-21 19:40
【摘要】:近些年来煤化工行业发展迅速,有煤炭资源的地方都在规划以煤炭作为原料进行建设项目。义煤综能公司煤制气项目系统复杂,投资额巨大,在进度、质量、安全、成本等各方面的控制难度都非常大。并且,在项目建设过程中,涉及到设计单位、原材料和设备的供货商、施工承包商、分包商和监理单位等众多队伍的参与。必须利用有效且科学的项目进度控制和质量管理方法,才能对项目进行有效控制和管理。 本文以义煤综能公司煤制气项目为研究对象,对义煤综能公司煤制气项目的建设背景进行了分析,提出了义煤综能公司煤制气项目在建设过程中存在的问题,并在项目建设中引入项目管理的重要性。在深入分析项目管理理论体系的过程中,把项目进度控制的理论应用到义煤综能公司煤制气项目的建设之中。研究了义煤综能公司煤制气项目建设进度控制中的项目进度计划,并对项目进度的检测和调整进行了具体的分析。在项目质量管理方面,建立了该项目的质量管理职责,分析了义煤综能公司煤制气项目在设计、采购和施工方面的质量管理内容,以及义煤综能公司煤制气项目质量管理记录和检测的方法。
[Abstract]:In recent years, coal chemical industry has developed rapidly, where coal resources are in the planning of coal as raw materials for construction projects. The system of coal production project is complex, the investment is huge, and it is very difficult to control the progress, quality, safety, cost and so on. In the process of project construction, it involves the participation of design units, suppliers of raw materials and equipment, construction contractors, subcontractors and supervision units. The effective and scientific method of project schedule control and quality management must be used in order to control and manage the project effectively. In this paper, the construction background of the coal gas production project of Yiwei Coal Comprehensive Energy Company is analyzed, and the problems existing in the construction process of the project are put forward. And introduce the importance of project management in the project construction. In the process of deeply analyzing the theory system of project management, the theory of project schedule control is applied to the construction of coal gasification project in Yiwei Coal Comprehensive Energy Company. This paper studies the progress plan of the construction progress control of the coal gas production project in Yiwei Coal Comprehensive Energy Company, and makes a concrete analysis on the detection and adjustment of the project progress. In terms of project quality management, the quality management responsibility of the project is established, and the content of quality management in the design, purchase and construction of the coal production project of Yiwei Coal Comprehensive Energy Company is analyzed. And the quality management record and test method of coal production project in Yiwei Coal Comprehensive Energy Company.
【学位授予单位】:华东理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TQ54;F273.2;F426.21
本文编号:2136649
[Abstract]:In recent years, coal chemical industry has developed rapidly, where coal resources are in the planning of coal as raw materials for construction projects. The system of coal production project is complex, the investment is huge, and it is very difficult to control the progress, quality, safety, cost and so on. In the process of project construction, it involves the participation of design units, suppliers of raw materials and equipment, construction contractors, subcontractors and supervision units. The effective and scientific method of project schedule control and quality management must be used in order to control and manage the project effectively. In this paper, the construction background of the coal gas production project of Yiwei Coal Comprehensive Energy Company is analyzed, and the problems existing in the construction process of the project are put forward. And introduce the importance of project management in the project construction. In the process of deeply analyzing the theory system of project management, the theory of project schedule control is applied to the construction of coal gasification project in Yiwei Coal Comprehensive Energy Company. This paper studies the progress plan of the construction progress control of the coal gas production project in Yiwei Coal Comprehensive Energy Company, and makes a concrete analysis on the detection and adjustment of the project progress. In terms of project quality management, the quality management responsibility of the project is established, and the content of quality management in the design, purchase and construction of the coal production project of Yiwei Coal Comprehensive Energy Company is analyzed. And the quality management record and test method of coal production project in Yiwei Coal Comprehensive Energy Company.
【学位授予单位】:华东理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TQ54;F273.2;F426.21
【参考文献】
相关期刊论文 前9条
1 李海润;;煤化工设备质量管理及进度控制[J];化工管理;2013年02期
2 陈晓惠;;论大型项目的进度控制[J];化学工程与装备;2014年01期
3 李菁宇;李艳杰;;石化项目建设中设计进度控制的探讨[J];管理观察;2014年01期
4 雷少阳;王志会;;浅谈工程质量管理审计的几个环节[J];工业审计与会计;2013年03期
5 沈勇;;化工工程项目施工进度综合管理措施浅析[J];科技与企业;2013年09期
6 曹文思;;工程项目进度控制管理方法[J];江西建材;2014年07期
7 王万荣;陈兵;李霄;;石化扩改项目施工进度控制与质量管理[J];石油工业技术监督;2009年04期
8 孙宪来;;浅谈如何加强生产过程的质量管理[J];石油工业技术监督;2014年06期
9 吴瑜;亢万忠;;粉煤气化项目工期和质量风险管理[J];大氮肥;2008年05期
,本文编号:2136649
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2136649.html