镇沅金矿田开发建设的技术方案选择及其经济性评价
[Abstract]:In recent years, the changes of international gold prices and the increasing difficulty of mining gold resources, In February, 2004, Yunnan Commodity auction Center Co., Ltd. auctioned the fixed assets (excluding mineral rights) of the original Zhenyuan gold mine. China Gold Group bid for 47 million yuan, China Gold Group Technology Co., Ltd. held by Yunnan Gold Co., Ltd. formally took over. Zhenyuan gold mine administrative division belongs to Zhenyuan Yi nationality, Hani nationality, Lahu nationality autonomous county Heping Township in Yunnan Province, and the east part of the south part of the ore field belongs to Jianxin Township of Xinping County, Yuxi area. Based on the desk literature review, this paper summarizes and analyzes the main ways and methods of gold mining at home and abroad, as well as the relevant suggestions and suggestions of different scholars and experts on the cost control of gold mining. This paper analyzes the natural and mineral reserve conditions of Zhenyuan gold ore field, studies the construction cost of Zhenyuan gold ore field from the aspects of site selection, equipment purchase, personnel input, etc. The measures to control the development cost of gold ore field are put forward from the point of view of organization and guarantee. With the further decline of the international gold price and the sharp decline of gold resources in China, the mining cost of gold ore field is rising constantly, which is facing a great challenge to the survival and development of domestic gold field development enterprises. The research in this paper will promote the development and utilization of refractory gold resources in China, which is of great significance to promote the healthy, stable and sustainable development of gold industry. At the same time, the development and construction of the project will promote the development of local economy and promote the transformation from resource superiority to economic advantage, so it has a strong reference significance for the development of local economy. By introducing the natural situation of Zhenyuan gold ore field, including deposit characteristics, mining technical conditions and mineral environment, the difficulties of mining Zhenyuan gold ore field are put forward. On this basis, considering the natural, technical and environmental factors, the mining scheme of Zhenyuan gold ore field is designed. According to the main construction contents of Zhenyuan gold ore field, various cost and cost investment estimates are analyzed, and the main cost and expense elements are analyzed. On this basis, the economic and social benefits of Zhenyuan gold ore field construction are evaluated. Finally, the guarantee measures for the construction of Zhenyuan gold ore field are put forward. Suggestions are put forward mainly from the aspects of organization structure, project schedule and safety management of tailings reservoir. The exploitation of Zhenyuan gold ore field is economically feasible and the social benefit is remarkable.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TD863
【相似文献】
相关期刊论文 前4条
1 郑汉波,,程定明;镇沅金矿采选工程以设计为龙头总承包工作的实践[J];有色金属设计;1994年03期
2 瞿国相 ,苏东海;镇沅金矿250t/d采选工程通过验收[J];工业安全与防尘;1995年07期
3 小妖;凹凸;;镇沅黑古陶[J];普洱;2011年03期
4 ;[J];;年期
相关重要报纸文章 前10条
1 本报记者 柴红飚 张长虹 周海芬;民族贫困县怎样建山地城镇[N];云南日报;2013年
2 通讯员 明太兴;镇沅国税积极帮扶苦聪人[N];云南日报;2006年
3 本报记者 赵一心 胡琦;镇沅苦聪人经历巨变[N];云南日报;2006年
4 记者 程三娟;镇沅:深入基层听心声[N];云南日报;2009年
5 本报记者 常言 张仲贤 特约通讯员 罗忠政;30年奋进 镇沅交通突破牲发展[N];云南经济日报;2009年
6 记者 高月英;镇沅七名政协干部得到交流提拔[N];云南政协报;2012年
7 李应伟;镇沅食品安全工作通过市级考核[N];中国医药报;2007年
8 本报记者 李汉勇;镇沅:苦聪山寨战贫困[N];云南日报;2006年
9 记者 刘薇薇;云南日报与镇沅县共建理论评论调研基地[N];云南日报;2010年
10 记者 程三娟 通讯员 刘语琴;镇沅城市特困居民患大病可获救助[N];云南日报;2009年
相关硕士学位论文 前4条
1 刘强;镇沅金矿田开发建设的技术方案选择及其经济性评价[D];吉林大学;2016年
2 李彬昕;云南镇沅黑古陶产品研究[D];昆明理工大学;2014年
3 曹培培;镇沅苦聪话祜纳方言音系对比研究[D];云南民族大学;2014年
4 黄雯;镇沅苦聪人畲v吔诘拇醒芯縖D];中央民族大学;2013年
本文编号:2193569
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2193569.html