综放复采面过空巷支架适应性数值模拟研究
[Abstract]:Aiming at the problem of the type selection of 1301 complex face support in Shenghua Coal Mine, the coupling numerical model of hydraulic support and surrounding rock is established by using Extrusion module in FLAC3D, and the excavation analysis is carried out by fish language. The study shows that when the face of fully mechanized caving passes through the parallel gob, the pillar between the gob and the working face will suddenly destroy and lose stability, which will lead to the ahead fracture of the roof of the working face and cause the greater strength of the pressure-coming ahead. Peak compressive stress of hydraulic support column in the middle of working face reaches 43.1 MPa. The ZFY10200/25/42 two-column cover type hydraulic support for top coal caving can meet the support requirement of 1301 working face in Shenghua Coal Mine.
【作者单位】: 太原理工大学;
【基金】:“十二五”国家科技支撑计划资助项目(2012BAB13B04)
【分类号】:TD355.4
【相似文献】
相关期刊论文 前10条
1 黄汉富;高冒空巷充填技术研究[J];矿山压力与顶板管理;2005年02期
2 周海丰;;大采高综采面过平行全长空巷技术研究[J];陕西煤炭;2008年06期
3 魏永胜;周海丰;;大采高综采工作面过空巷关键技术研究[J];中国煤炭工业;2008年12期
4 温庆华;;神东矿区综采工作面过平行全长大断面空巷技术[J];煤矿开采;2009年02期
5 陈意飞;;阳煤二矿综放面快速过空巷技术应用[J];陕西煤炭;2012年06期
6 赵洪思,李凤坡,赵学政;新邱露天煤矿空巷的探查和处理[J];露天采矿;1991年01期
7 陈伟;露天矿场空巷区机械作业安全厚度的确定[J];露天采矿;1992年01期
8 郭晓彦;;望田煤业旧采区域内遗留空巷稳定性的数值分析[J];山西煤炭;2014年07期
9 迟国铭;;补连塔煤矿过32201工作面空巷的理论分析与计算[J];陕西煤炭;2005年04期
10 刘民强;;综采工作面过空巷的支护效果浅析[J];山西煤炭;2010年03期
相关会议论文 前1条
1 李焕民;张海波;管学茂;;综采工作面空巷新型材料充填试验研究[A];创新发展——河南省第五届学术年会论文选集[C];2009年
相关重要报纸文章 前1条
1 记者 李兵;矸石不出井 回填采空区[N];山西日报;2011年
相关硕士学位论文 前3条
1 张德宝;马营煤矿复采工作面过老空巷矿压显现特征及关键技术研究[D];辽宁工程技术大学;2015年
2 郭富利;综合放工作面空巷围岩控制理论研究[D];太原理工大学;2003年
3 杜科科;千万吨综采工作面等压过空巷技术研究[D];山东科技大学;2011年
,本文编号:2273395
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2273395.html