立井冻结壁冷量提取与应用研究
[Abstract]:With the rapid development of national economy, the dependence on resources is increasing. The mining intensity of coal, as the most important energy source up to now, is bound to increase gradually, but the shallow resources in our country are decreasing day by day, so it is inevitable to mine deep resources. The deeper the mining depth, the more serious the problem of thermal damage. Solving the problem of high temperature and high humidity in the mine becomes the most important problem in mining deep coal resources. In order to meet the requirement of mining temperature, the necessary cooling measures must be adopted in the mine with serious thermal damage, and at the same time, in the summer high temperature season, the cooling capacity is also needed for the cooling of the surface air conditioning freezing water. If the direct manual cooling to meet the cooling of the mine and building air-conditioning refrigeration, the cost of coal mining will be greatly increased. At present, the mining of deep mineral resources at home and abroad mainly adopts the method of freezing well sinking, the essence of which is to use artificial refrigeration to change the properties of rock and soil temporarily to consolidate the strata. When the freezing is completed and enters the shaft sinking stage, a large amount of cold capacity is stored in the shaft wall. If the former freezing pipe is used to extract part of the cooling amount from the circulating water, it can increase the cooling rate for the mine cooling and air conditioning freezing water cooling. In order to achieve the secondary use of energy. At present, our country and even other countries do not have more mature, efficient freezing wall cold extraction application. In this paper, a series of researches have been carried out under the background of a certain mine. Firstly, based on the field data, the characteristics of the changing characteristics of the cooling requirement of mining and the decrease of the freezing wall cold storage over time have been analyzed. The feasibility of using freezing wall cooling capacity is verified by experiments, and combined with the actual situation in the field, The salt liquid water tank heat exchanger is selected as the test system for the utilization of the freezing wall cooling volume. Through the experiments and related theories, the influence factors of the heat transfer coefficient of the heat exchanger of the freezing wall cooling extraction system are mainly caused by the formation of heat resistance on the heat transfer surface of the heat exchanger. Water flow velocity in water tank, salt flow velocity in pipe, etc. The extraction and application of frozen wall cooling amount is actually the secondary utilization of resources. To a greater extent, the utilization ratio of resources can be improved, and the decreasing resources can be saved to the maximum extent, and the economic and social benefits can be improved. In line with the current vigorously advocated "green construction" requirements. Therefore, the extraction and application of frozen wall cooling is of great research value and the inevitable trend of social development in the future.
【学位授予单位】:安徽理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD265.3
【相似文献】
相关期刊论文 前10条
1 彭承;;人工冻结工程中的冻结壁设计探讨[J];科技风;2009年09期
2 范存辉;高修海;;冻结壁的强度研究[J];科技风;2010年12期
3 郭永富;;深表土冻结壁变形规律[J];中国工程科学;2011年11期
4 杨维好;杜子博;杨志江;柏东良;;基于与围岩相互作用的冻结壁塑性设计理论[J];岩土工程学报;2013年10期
5 沈国富;苏立凡;;弹塑性冻结壁厚度的计算[J];煤炭科学技术;1977年12期
6 袁文伯;马英明;陈宽德;;非均质弹性冻结壁应力分析[J];煤炭学报;1983年02期
7 剑万禧;冻结壁的有限元分析[J];淮南矿业学院学报;1984年01期
8 尤春安;;非均质冻结壁弹塑性应力分析及壁厚的计算[J];煤炭学报;1986年02期
9 翁家杰 ,张铭;冻结壁弹塑性反演分析[J];中国矿业大学学报;1991年01期
10 刘亚军;;特殊地层冻结壁的设计与控制[J];山西建筑;2014年06期
相关会议论文 前10条
1 彭承;;人工冻结工程中冻结壁设计探讨[A];矿山建设工程技术新进展——2009全国矿山建设学术会议文集(上册)[C];2009年
2 汪仁和;;冻结壁的力学特性与计算[A];地层冻结工程技术和应用——中国地层冻结工程40年论文集[C];1995年
3 周希圣;梁晋东;翁家杰;;隧道软土冻结壁厚度设计研究[A];矿井建设与岩土工程技术新发展[C];1997年
4 陈红蕾;王建平;李长忠;胡翠平;;砌壁后冻结壁内表面环向温度变化特征分析[A];矿山建设工程技术新进展——2009全国矿山建设学术会议文集(上册)[C];2009年
5 顾孟寒;;冻结壁模拟试验的温度控制[A];地层冻结工程技术和应用——中国地层冻结工程40年论文集[C];1995年
6 崔广心;;关于冻结壁几个问题的探讨[A];地层冻结工程技术和应用——中国地层冻结工程40年论文集[C];1995年
7 王长生;;深井冻结壁变形的分析[A];地层冻结工程技术和应用——中国地层冻结工程40年论文集[C];1995年
8 汤志斌;陈文豹;李功洲;;冻结壁温度场的实测研究及在工程中的应用[A];地层冻结工程技术和应用——中国地层冻结工程40年论文集[C];1995年
9 张开顺;李炳胜;杨维好;王衍森;宋雷;;某井筒冻结壁径向位移规律计算研究[A];矿山建设工程新进展——2005全国矿山建设学术会议文集(上册)[C];2005年
10 卢相忠;宋世宏;;丁集主、副井冻结工程冻结壁分析[A];矿山建设工程新进展——2005全国矿山建设学术会议文集(上册)[C];2005年
相关重要报纸文章 前3条
1 张子倩;向地球深处要煤炭[N];青岛日报;2007年
2 李俊林;马鞭山铁矿采掘工艺填补国内空白[N];巢湖日报;2010年
3 卜现山 胡矿礼;“亚洲第一井”冻结深井达到开挖标准[N];淮南日报;2007年
相关博士学位论文 前8条
1 王建州;深厚表土层非均质厚冻结壁力学特性研究[D];中国矿业大学;2008年
2 奚家米;深厚富水软岩井筒冻结壁力学特性及应用研究[D];西安科技大学;2011年
3 宋常军;厚表土立井冻结工程热—力耦合效应模型试验及数值分析[D];中国矿业大学(北京);2012年
4 吉植强;季节冻土地区圆形基坑冻结壁模型试验研究[D];哈尔滨工业大学;2010年
5 荣传新;深厚冲积层冻结壁与井壁的力学特性及其共同作用机理研究[D];中国科学技术大学;2006年
6 陈志宇;冻结工程项目管控研究[D];中国矿业大学(北京);2013年
7 贾进锋;深厚富水表土层斜井冻结技术研究[D];中国矿业大学(北京);2012年
8 郑铁骑;白垩系含水软岩地层冻结与强制解冻规律研究[D];中国矿业大学(北京);2013年
相关硕士学位论文 前10条
1 王磊;弱胶结地层冻结壁变形研究与影响因素敏感性分析[D];山东科技大学;2010年
2 沈阳;多排管人工冻结平均温度及厚度计算方法研究[D];南京林业大学;2015年
3 许磊;表土段冻结壁解冻过程中斜井井壁受力规律研究[D];中国矿业大学;2015年
4 王志;基于温度场梯形分布的冻结壁力学特性研究[D];安徽理工大学;2016年
5 周瑜;黄土地层冻结壁厚度预测方法及工程应用研究[D];西安建筑科技大学;2016年
6 梁博;新庄煤矿风立井考虑冻结壁解冻井壁的稳定性影响分析[D];西安科技大学;2015年
7 孙杰龙;穿越富水砂层冻结斜井冻结壁变形规律研究[D];西安科技大学;2015年
8 胡兵;深埋隧道水平竖直冻结壁相互影响研究[D];中国矿业大学;2016年
9 甄田田;基于黏弹塑性理论的冻结壁与井壁共同作用机理分析[D];安徽理工大学;2017年
10 郭建;任楼矿北风井冻结方案及实测分析[D];安徽理工大学;2017年
,本文编号:2302660
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2302660.html