【摘要】:针对煤矿井下采煤机电缆在工作过程中容易发生二次或多次弯曲,造成电缆过度挤压、磨损、掉道等恶劣工况这一现象,设计一种采煤机电缆自动拖拽控制系统,适用于一般长度综采工作面,拖拽装置安装在电缆槽中,跟随采煤机电缆同步运行。该系统可实现拖缆装置自动控制功能,解决了电缆过分挤压、磨损和掉道等问题,保障了作业人员的安全。本文在分析采煤机电缆实际工况的基础上,设计采煤机电缆拖拽装置,对其结构组成与工作原理进行分析与说明;在明确系统设计原则与要求的基础上,完成了采煤机电缆自动拖拽控制系统方案设计,提出了恒扭矩与速度跟随两种控制思路并分别对其控制原理进行说明,分析了控制系统软件与硬件组成部分及其具体功能;对采煤机电缆拖拽装置进行受力分析,对电机、减速器、控制器、变频器等硬件系统进行设计选型,确定硬件通信技术;编写两种控制思路下系统主程序与子程序并进行调试,建立控制系统上位监控界面;搭建实验台对采煤机自动拖缆控制系统进行可行性验证。以上研究工作验证了采煤机电缆自动拖拽控制系统实施的可行性,可与煤矿井下采煤机配合使用。
[Abstract]:In view of the phenomenon that the cable of coal miner in coal mine is easy to bend twice or many times in the working process, which results in excessive extrusion, wear and drop of the cable, a kind of automatic towing control system for the cable of shearer is designed. Suitable for full mechanized mining face of general length, towing device is installed in cable slot, following the synchronous operation of shearer cable. The system can realize the automatic control function of the towing device, solve the problems of over-extrusion, wear and drop of the cable, and ensure the safety of the operators. Based on the analysis of the actual working conditions of the shearer cable, this paper designs the cable towing device of the shearer, and analyzes and explains its structure and working principle. On the basis of clear system design principles and requirements, the scheme design of automatic towing control system for shearer cable is completed. Two control ideas, constant torque and speed following, are put forward and their control principles are explained respectively. The software and hardware components of the control system and their specific functions are analyzed. The mechanical analysis of cable towing device of shearer, the design and selection of hardware system, such as motor, reducer, controller, frequency converter and so on, are carried out, and the hardware communication technology is determined. The main program and subroutine of the system are written and debugged under two control ideas, the upper monitoring interface of the control system is established, and the feasibility of the automatic towing cable control system of the shearer is verified by setting up an experimental bench. The above work verifies the feasibility of the automatic towing control system of shearer cable, which can be used in cooperation with coal miner.
【学位授予单位】:西安科技大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TD632.1

【参考文献】

相关期刊论文 前10条

1 J.DziuraM.Sc.Eng;;黑龙系统:在开采薄煤层上兼具创新和艺术色彩的综采设备[J];中国煤炭工业;2015年10期

2 王国志;陈卫;李璇;;如何提高国产采煤机电缆的使用寿命[J];电线电缆;2015年03期

3 符秀青;;基于PLC的采煤机控制系统研究[J];煤炭与化工;2015年04期

4 王道平;杜海蕾;;钢铁行业“十三五”发展趋势及对煤炭产业影响分析[J];煤炭经济研究;2015年01期

5 胡晓卉;;电力通讯自动化设备的设计研究[J];信息通信;2014年12期

6 兰天安;;煤矿用采煤机电缆线芯断裂问题的分析与预防[J];科技创新与应用;2014年32期

7 解波;秦天武;;电缆自动拖拽装置在综采工作面的应用[J];安徽科技;2014年08期

8 王华平;秦书明;;采煤机托缆装置的改进与应用[J];山西煤炭;2014年06期

9 杨建华;;关于采煤机电缆拖曳方式的优化改进措施分析[J];科技创新与应用;2014年09期

10 阚锦彪;;电牵引采煤机新型拖缆装置的开发研制[J];煤矿机械;2014年03期

相关硕士学位论文 前1条

1 李旺年;基于虚拟现实技术的综采“三机”联动过程仿真[D];西安科技大学;2014年



本文编号:2328230

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/2328230.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户55800***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com