神东矿区综采面采高对来压步距的影响分析
[Abstract]:The distribution state of the data of mining height, first pressure step and periodic pressure step of working face in Shendong mining area is determined by using statistical principle. The relationship between mining height increase and working face pressure step distance is deeply studied by using rock mechanics and rock pressure theory. The results show that the relationship between the mining height and the average initial pressure step is exponential function, and the relationship between the average period pressure step distance and the average period pressure step distance is a binomial function. On the whole, the mining height increased and the average initial pressure step increased synchronously. The increase of mining height results in the conversion of the basic top strata into direct top strata under the condition of common mining height. The basic roof lithology and fracture development degree of stope are closely related to the working face pressure step distance, which will lead to the increase or decrease of the pressure step distance. In Shendong coal mining area, the pressure step distance from the stope of No. 7 and No. 2 coal groups is longer than that of No. 4 coal group, and the pressure step distance of the stope face is longer than that of No. 4 coal group. The caving gangue has a high degree of filling in the goaf and increases the initial pressure step, but has a limited effect on the periodic pressure step. This paper applies the law of the influence of the increase of mining height on the step distance of pressure to the practice of final mining in Shendong mining area, which guides the final mining of 22306 working face in Bulianta Coal Mine.
【作者单位】: 贵州理工学院矿业工程学院;河南理工大学能源科学与工程学院;河南工程学院安全工程学院;
【基金】:国家自然科学基金煤炭联合基金重点项目(U1261207);国家自然科学基金项目(51564004)
【分类号】:TD323
【相似文献】
相关期刊论文 前10条
1 范孝锋;张友军;;无底柱分段崩落法崩矿步距优化的数值模拟[J];中国水运(理论版);2007年10期
2 王晓玲;中型轧钢厂的新型冷床──变步距冷床[J];冶金设备;1995年04期
3 武国平;;大型破碎站的移设步距确定方法应用研究[J];煤质技术;2007年05期
4 高永涛,任伍元,孙金海;无底柱分段崩落法下盘切岩及合理步距确定的研究[J];有色金属;1993年02期
5 周传波;无底柱分段崩落法崩矿步距及贫损指标的计算模型与实例[J];有色矿冶;1994年04期
6 余健;刘培慧;寇永渊;;高分段大间距结构合理崩矿步距研究[J];矿业研究与开发;2008年06期
7 陈朋飞;蔡吉飞;吕传东;;单自由度无级变步距输纸机的设计[J];北京印刷学院学报;2011年04期
8 安龙;徐帅;李元辉;彭建宇;;基于多方法联合的崩落法崩矿步距优化[J];岩石力学与工程学报;2013年04期
9 吴荣高;安龙;江学;王鹏;;梅山铁矿大结构参数下合理崩矿步距研究[J];金属矿山;2012年05期
10 刘胜富,苏靖,张延忠;间断连续运输工艺破碎站移设步距与周期研究[J];中国矿业;1997年01期
相关会议论文 前4条
1 李萍;柯波;赵菲;;小东沟钼矿最优崩矿步距研究[A];中国力学学会工程爆破专业委员会2013年年度工作会议暨学术交流会论文集[C];2013年
2 傅学松;;一种消除累积步距误差影响的方法及应用[A];2010年西南三省一市自动化与仪器仪表学术年会论文集[C];2010年
3 王日斌;郑海峰;陈晓云;田迎春;李显利;;弓长岭井下铁矿中厚矿体崩矿步距优化研究[A];全国金属矿山采矿新技术学术研讨与技术交流会论文集[C];2007年
4 蒋金泉;;长壁工作面老顶初次断裂步距及类型的研究[A];水电与矿业工程中的岩石力学问题——中国北方岩石力学与工程应用学术会议文集[C];1991年
相关硕士学位论文 前3条
1 陈朋飞;变步距多功能输纸机分析与研究[D];北京印刷学院;2012年
2 安龙;梅山铁矿多端壁倾角下崩矿步距的优化研究[D];东北大学;2011年
3 张泽龙;大倾角综放条件下老顶来压步距的综合预测[D];西安科技大学;2013年
,本文编号:2368560
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2368560.html