矿用变频主通风机性能及噪声实验研究
[Abstract]:In order to solve the problem of large energy saving prediction in frequency conversion regulation, the experimental platform of mine main ventilator developed by ourselves is used. The performance experiment and noise characteristic experiment of K45-4- 9 / 18.5 kW axial flow main ventilator are carried out. Based on the classical formula of proportional law, the experimental data of fan performance parameters at different frequencies are processed by the least square method, and the optimum fitting order between air volume and wind pressure, shaft power and efficiency is obtained. And draw the main fan performance curve family under different frequency; The noise characteristics of main fan inlet at different frequencies are studied. The main noise frequency range and spectrum characteristics of main fan inlet noise are obtained. The main research results obtained in this paper are as follows: (1) the frequency conversion speed regulation of mine main ventilator should not be less than 50 times of rated speed; When the speed of speed is between 50% and 100% of the rated speed, the maximum experimental air flow rate is taken as the best operating point, and the energy saving rate between adjacent frequencies is compared. It is concluded that the maximum energy saving rate is 47. (2) the wind pressure-air volume curve of the main ventilator used in frequency conversion mine is the best fitting result in 5 times; The results of four times fitting are the best. (3) the performance curves of the main ventilator with variable frequency are similar and have remarkable non-equal ratio variation. The formula of the non-equal-ratio variation law provides a method for calculating the energy saving rate of the main fan. (4) the performance curve of the main ventilator is different in reasonable working area under different frequencies; The curve of axial power ratio and air volume ratio presents deceleration and non-equal ratio increasing, and finally tends to a certain limit value, indicating that the main fan frequency conversion to a certain extent will no longer have the benefit of energy saving; With the decrease of frequency, the maximum efficiency corresponding to the performance curve of frequency conversion main ventilator decreases, and the error calculated at similar rate increases. (5) when the frequency is 50Hz, The main fan performance curve of power frequency and frequency conversion 100% is similar; The frequency conversion operation is more energy efficient than the power frequency 100% operation, and the maximum energy saving rate between the two is 2.94. The efficiency of power frequency is a little higher than that of frequency conversion 100%, and the maximum efficiency difference is 2.933. (6) the noise frequency of the main ventilator inlet is mainly distributed in the frequency range of 125Hz?4000Hz, that is, the medium and low frequency noise; The variation trend of the noise spectrum characteristic curve at different frequencies is roughly the same, and the noise of the frequency conversion main ventilator has attenuation characteristics, that is, the noise decreases with the decrease of the frequency, and the noise rate increases during the attenuation process.
【学位授予单位】:湖南科技大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TD441
【相似文献】
相关期刊论文 前10条
1 张宝红,邹爱英;在线条件下煤矿主通风机性能的测试和分析[J];风机技术;2003年03期
2 陈之帅;矿用主通风机风门的节能改造[J];矿山机械;2003年11期
3 张宝红;煤矿主通风机装置性能的测试及应用[J];煤矿机械;2003年04期
4 张步勤;关保生;王磊;;主通风机防腐减阻处理的尝试[J];矿山机械;2007年02期
5 乔海涛;;浅谈矿用主通风机的选型[J];煤矿机电;2008年06期
6 杨行;晁永飞;;主通风机风道的改造[J];煤炭技术;2009年10期
7 许睿;;关于《煤矿在用主通风机检验规范》在实际操作中应进一步修改完善的几点建议[J];山西煤炭;2010年09期
8 魏书华;王萍;;新型高效低噪叶片在主通风机中的应用[J];煤矿机械;2011年06期
9 陈海峰;;一种煤矿主通风机监控系统的设计[J];工矿自动化;2011年09期
10 倪圣功;;榆树井煤矿主通风机在线监测设计与实践[J];山东煤炭科技;2011年03期
相关会议论文 前5条
1 韩艳娟;宋建成;;基于信息融合技术的主通风机故障参数检测系统[A];煤矿自动化与信息化——第19届全国煤矿自动化与信息化学术会议暨中国矿业大学(北京)百年校庆学术会议论文集[C];2009年
2 郭广生;郭申喜;王国保;刘志伟;牛灿辉;霍廷维;;煤矿主通风机自动化控制技术研究与应用[A];煤炭工业节能减排与循环经济发展论文集[C];2012年
3 马修峰;;变频技术在煤矿主通风机设计中的方案优化[A];安全高效矿井机电装备及信息化技术——陕西省煤炭学会学术年会论文集(2011)[C];2011年
4 李占伟;魏晋宏;;基于OPC技术的煤矿主通风机监控系统[A];煤矿机电一体化新技术2011学术年会论文集[C];2011年
5 张玉杰;;S7-300在煤矿主通风机监控系统中的应用[A];煤炭机电与自动化实用技术[C];2012年
相关博士学位论文 前1条
1 吴新忠;煤矿主通风机通风失稳控制的研究与应用[D];中国矿业大学;2010年
相关硕士学位论文 前6条
1 李冲;煤矿主通风机振动信号特征提取技术的研究[D];中国矿业大学;2015年
2 贾腾;矿用变频主通风机性能及噪声实验研究[D];湖南科技大学;2015年
3 王明奎;煤矿用主通风机的振动特性研究[D];太原理工大学;2009年
4 温炳辉;基于LabVIEW的小波神经网络在煤矿主通风机状态监测中的应用研究[D];西安科技大学;2009年
5 王秀秀;矿用主通风机高压电动机机械故障诊断方法研究[D];太原理工大学;2014年
6 刘少荷;矿用主通风机自动化控制系统的研究[D];山东科技大学;2009年
,本文编号:2406800
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2406800.html