普朗铜矿底部结构应力变化模拟分析研究
[Abstract]:According to the sequence of bottom structure design and engineering construction of Prang Copper Mine, the stress changes of stope bottom structure after excavation of ore drawing vein, drawing roadway, ore drawing approach, drawing bottom operation and drawing funnel are simulated and studied by using FLAC~ (3D) numerical analysis software. The results show that after the construction of ore drawing funnel, there is a stress concentration area around the ore accumulation trough, and the top and floor of the eyebrow line of the ore drawing approach are the maximum principal stress concentration area, so it is necessary to strengthen the support.
【作者单位】: 云南迪庆有色金属有限责任公司;
【分类号】:TD862.1
【相似文献】
相关期刊论文 前10条
1 杨祖印 ,吴毅;短颈堑沟式底部结构的试验[J];化工矿山技术;1985年02期
2 郝建彬;漏斗式底部结构简化的探讨[J];有色金属(矿山部分);2000年04期
3 杨尚真;应用振动出矿技术完善大量崩矿采矿方法底部结构[J];化工矿山技术;1994年04期
4 杨仕教,李明;某铀矿就地破碎浸出采场底部结构的选择与施工[J];中南工学院学报;1998年02期
5 曾伦生;罗先伟;;92~#矿体出矿底部结构工程优化[J];采矿技术;2008年03期
6 朱栗宝;罗周全;罗贞焱;黄准生;刘晓明;;采场底部结构斜面角优化研究[J];矿冶工程;2012年01期
7 刘国栋;我国金属矿山底部结构的应用评价及选择[J];湖南冶金;1996年04期
8 阳雨平;新桥硫铁矿采场底部结构及参数优化[J];化工矿物与加工;2001年05期
9 王天民;谈电耙耙矿底部结构设计[J];黄金;1984年04期
10 孟稳权;冬瓜山铜矿阶段空场嗣后充填采矿法的底部结构选择及优化[J];矿冶;2004年04期
相关会议论文 前3条
1 张俊;;底部结构在无底柱采场回收分层中的应用[A];2010全国采矿科学技术高峰论坛论文集[C];2010年
2 束国才;祁保明;;自然崩落法采场底部结构的选择[A];第六届全国采矿学术会议论文集[C];1999年
3 代生伟;;降低大爆破对底部结构的破坏[A];中国采选技术十年回顾与展望[C];2012年
相关硕士学位论文 前2条
1 廖江海;龙首矿贫矿体崩落采矿中第一个底部结构力学稳定性研究[D];兰州大学;2008年
2 朱栗宝;冲击荷载作用下采场底部结构损伤机理研究及应用[D];中南大学;2012年
,本文编号:2508483
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2508483.html