当前位置:主页 > 科技论文 > 矿业工程论文 >

露天矿短期生产计划优化研究

发布时间:2020-07-15 12:59
【摘要】:露天矿运行的一个关键环节是各块段开采顺序的优化,寻找开采效益最优的方案。在这一部分所面临的难题,即露天矿问题的块调度,是考虑到几个技术和物理约束,确定最终目标以确定块提取的最优调度的安排。本研究引入了解决露天矿问题的综合数学模型,该模型考虑了实际采矿作业的技术条件。在该模型中,对块的属性、目的地分配、块调度、等级控制和库存进行了研究和集成,以满足生产目标,并基本上降低了库存成本。与传统的矿块调度模型相比,该模型是根据块单元(最小挖掘单元)开发的,同时满足等级、处理和优先关系要求的所有约束条件。露天矿块调度是一个非确定性多项式问题,因此,标准整数规划求解器不能解决工业规模问题。因此在MATLAB软件中创建和编码启发式算法和元启发式算法,包括构造启发法、模拟退火法、禁忌搜索法和局部搜索法。禁忌搜索法与模拟退火法是一种新的杂交算法,具有两种特征。为了验证所提出的启发式算法,在这些算法的结果和标准求解器(CPLEX)的结果之间进行比较,对于适用于大规模案例的求解。此外,根据实地的真实数据。进行敏感性分析和数值研究,以定量和洞察力的建议规划师和采矿工程师。
【学位授予单位】:中国矿业大学
【学位级别】:博士
【学位授予年份】:2018
【分类号】:TD804
【图文】:

模型图,模型


d height (z) of the block model. Fig 1-1a and Fig 1-1b demonstrate a 3D and a 2Dck model individually. A block model content of a numerous of the individualck in which various attributes like, specific gravity, rock category, and grade arealuated for every individual block. The model of a big volume of ore may have auple millions of blocks that depending on the volume of the ore and the dimensionsthe blocks (Fig1-2). The average grade of each individual block is assumed byostatistical methods[11]. Geo-statistical and Statistical strategies are mostly used toess the properties of the block depend on the exploration data (data of holes). theiging estimator is a commonly used method for estimating and evaluating the blockributes. Kriging is a type of geostatistical methods and is known as the best linearbiased estimator[12]. In recent times, in order to handle uncertainty in evaluationplied geostatistical simulation methods like sequential Gaussian simulation,ulated annealing[13,14]. At the stage of grade estimation, assuming that theperties distribution is uniform and equal within the whole block.a b

模型图,模型


The block dimensions are defined such that the block model represents orebeometry and characteristics precisely. The block dimensions are determiepending on the geological deposits & formations of the ore body, exploraoreholes, grade fluctuation of ore and the dimensions of the machinery. For mpecification, the tendency is to choose small dimensions for the blocks in the bodeling. However, it is known, decreasing of the block dimensions result inariance of estimation of that block enhances[17]. In addition to this rise in eumulative of estimation, the time which consumes for mine design & planning rade evaluation will rise rapidly as the dimensions of blocks are diminishing. Aependable guideline, the smallest volume of a block must not be less of 25% ofistance between exploration boreholes[18]. also, another defect of the blocks was small dimensions is dilution. The dilution has taken place because of the blendaste with ore in blasting and loading operation and then sent to the stockpile olant. The dilution affecting by excavator's and loader's bucket size; the sizeFig. 1-2 A block model showed thousands of blocks (Hustrulid & Kuchta 1995)图 1-2 显示几千块的块模型(Hustrulid & Kuchta 1995)

示意图,露天矿,示意图


Fig. 1-4 A section view of final pit limit, (Ramazan,2001)图 1-4 露天矿终了示意图 Cut-off graden general, the cut-off grade is specified as smallest quantity of profitaial that should be in one unit (e.g. one ton) of material before this matorted to the processing unit[26]. Actually, the cut-off grade is a scentiate between the ore and the waste in the certain deposit. In a straightfminor cut-off grade meaning is the cost of processing is precisely equivacome gain by the recovered commodity. Consequently, the minor cut-ofputed as the grade g at which the net cost of processing is equivalent to it when the material is handled as waste. many cut-off grades may detding to consideration of which constraint (e.g., mining limit, processing required)[29]. indeed, the cut-off grade does not just depend on the meta market and money expenses of mining, processing, and refining, besidesepends on the limits of these stages and grade-tonnage circulation of the

【参考文献】

相关期刊论文 前10条

1 刘亚兵;严怀民;刘如飞;;基于车载三维激光扫描技术的露天矿三维建模[J];露天采矿技术;2015年04期

2 赵玉国;王旭;张广立;刘孝伟;;块体模型算量方法在宝日希勒露天矿中的应用[J];露天采矿技术;2012年06期

3 周晓将;;Surpac在三道庄露天矿地质建模中的应用[J];有色金属(矿山部分);2012年04期

4 陈毓;;伊敏露天矿地质模型建模方法研究[J];露天采矿技术;2012年03期

5 杨青;张亮;王振;;基于KD树和CDT的露天矿三维建模[J];计算机技术与发展;2011年12期

6 巩哲;宋丽丽;;基于ObjectARX的露天矿三维建模技术与可视化研究[J];内蒙古煤炭经济;2011年04期

7 赵浩;白润才;刘光伟;王金金;赵亮;肖于;;基于AutoCAD的露天矿三维建模与应用研究[J];中国钼业;2011年01期

8 赵浩;白润才;刘光伟;王金金;赵亮;肖于;;基于AutoCAD的露天矿三维建模与应用研究[J];化工矿物与加工;2011年01期

9 孙前芳;刘光伟;赵浩;;三维可视化建模技术在露天矿中的应用[J];采矿技术;2010年06期

10 毕林;王李管;陈建宏;徐志强;;基于CDT与布尔运算的露天矿三维建模[J];辽宁工程技术大学学报(自然科学版);2009年04期

相关会议论文 前1条

1 王植;刘善军;徐白山;吴立新;;无人机影像序列中露天矿三维建模[A];第十七届中国环境遥感应用技术论坛论文集[C];2013年

相关博士学位论文 前2条

1 杨彪;露天矿开采境界动态优化研究及应用[D];中南大学;2011年

2 刘光伟;数字化露天矿虚拟开采模型构建技术及应用研究[D];辽宁工程技术大学;2010年

相关硕士学位论文 前10条

1 黄甫;内排条件下露天矿长远排土规划研究[D];中国矿业大学;2017年

2 狄长江;以运费最小为目标的露天矿剥—排对位算法研究及运用[D];昆明理工大学;2017年

3 宋小美;基于数字化矿床模型的露天开采规划优化研究[D];昆明理工大学;2014年

4 吴洪阳;白音华一号露天矿开采程序优化研究[D];辽宁工程技术大学;2014年

5 赵明;短期进度计划整体优化及在伊敏三号露天矿的应用[D];东北大学;2014年

6 邓为;白音华一号露天矿开采工艺优化研究[D];辽宁工程技术大学;2014年

7 曲业明;吉林郭勒二号露天矿三维地质建模及应用研究[D];辽宁工程技术大学;2013年

8 余文章;基于矿床数字模型的露天采剥方案优化方法研究[D];昆明理工大学;2012年

9 赵浩;宝日希勒露天矿三维地质建模及应用研究[D];辽宁工程技术大学;2012年

10 赵金龙;黑岱沟露天矿地质模型的建立及应用研究[D];辽宁工程技术大学;2011年



本文编号:2756521

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/kuangye/2756521.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户60737***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com