当前位置:主页 > 科技论文 > 施工技术论文 >

建筑工程前期阶段造价的控制与管理

发布时间:2018-04-03 03:11

  本文选题:建筑工程 切入点:造价 出处:《科技与企业》2016年08期


【摘要】:造价控制与管理是建筑工程开展前的重要内容,如果工程造价不合理,不仅阻碍建筑工程的顺利进行,而且会损害建筑企业的经济效益,因此,对工程前期造价进行合理控制和管理至关重要。虽然我建筑工程行业规范已逐步完善,但是在实际情况中,很多制度规范已经难以适应社会的发展形势,而且有关部门执行不力,一些建筑企业又不具有较好的工程造价管理意识,致使建筑工程的开展出现了较多问题。本文主要对建筑工程前期阶段造价的控制与管理进行分析,提出了一些建议。
[Abstract]:Cost control and management is an important content before the construction project is carried out. If the construction cost is unreasonable, it will not only hinder the smooth progress of the construction project, but also damage the economic benefits of the construction enterprise.It is very important to control and manage the construction cost reasonably.Although the code of our construction engineering industry has been gradually improved, in the actual situation, many institutional norms have become difficult to adapt to the development of society, and the relevant departments have not implemented them well.Some construction enterprises do not have a good sense of project cost management, resulting in a lot of problems in the development of construction engineering.This paper mainly analyzes the cost control and management in the early stage of construction engineering, and puts forward some suggestions.
【作者单位】: 河北兴冀工程项目管理有限公司;
【分类号】:TU723.3

【相似文献】

相关期刊论文 前5条

1 李艳云;;建筑工程项目前期投资估算的重要性研究[J];山西建筑;2014年21期

2 彭寿长;;市政道路工程前期阶段快速组价方法与动态调整[J];铁路工程造价管理;2012年02期

3 徐宏燕;;浅谈全过程工程造价的管理及控制[J];科技与企业;2014年05期

4 于o';云南临沧第三系硅藻土的研究[J];云南建材;1989年01期

5 ;[J];;年期

相关硕士学位论文 前1条

1 黄志挺;建筑工程前期阶段造价的控制与管理[D];浙江大学;2013年



本文编号:1703351

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/sgjslw/1703351.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d23b4***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com