上海NEXX第四循环水场项目风险管理研究

发布时间:2018-05-24 08:04

  本文选题:风险管理 + 石油化工 ; 参考:《华东理工大学》2017年硕士论文


【摘要】:大型石油化工循环水场项目具有规模大,投资大,工程结构复杂等特点,且涉及专业众多,如土建、结构、设备、配管、电气、仪表、给排水、应力等专业。项目的顺利进行需要各专业的深度衔接,整个项目的生命周期充满了各种风险,稍有疏忽,就会出现人员伤亡,项目延期,费用上升等情况,从而使整个项目以及后续装置的运行的进度受到极大的影响,因此对此类项目引入项目风险管理,显得尤为必要。文章以上海NEXX第四循环水场项目为风险管理研究对象,首先对项目风险管理的理论进行了阐述,通过国内外文献资料的引用,简要的叙述了目前国内外在项目风险管理方面研究或实践的现状,然后将风险管理理论运用到上海NEXX第四循环水场项目中去,针对循环水场项目的特点,进行了不确定性分析,结合头脑风暴法,识别出政策风险、经济风险、社会风险、经营风险、安全风险、技术风险等七大类风险,通过使用模糊综合评价法对识别出来的风险进行评估,评估得出风险较大的风险有经营风险、安全风险、技术风险等。根据风险评估的结果采取相应合理的方法如预防、减少、接受、储备等方式来应对风险,并设置风险监控措施对整个项目各个阶段进行监控。最终将整个循环水项目的风险控制在合理的范围内。
[Abstract]:The large-scale petrochemical circulating water field project has the characteristics of large scale, large investment, complex engineering structure, and involves many specialties, such as civil engineering, structure, equipment, piping, electrical, instrumentation, water supply and drainage, stress and so on. The smooth running of the project requires the deep convergence of various professions. The whole life cycle of the project is full of various risks. If you neglect it, there will be casualties, project delays, rising costs, and so on. Therefore, it is necessary to introduce project risk management into the project. In this paper, the project of Shanghai NEXX fourth circulating water farm is taken as the research object of risk management. Firstly, the theory of project risk management is expounded, and the reference of domestic and foreign literature is given. This paper briefly describes the current situation of research or practice in project risk management at home and abroad, and then applies the theory of risk management to the project of Shanghai NEXX fourth circulating water field. According to the characteristics of the project, the uncertainty analysis is carried out. Combining the brainstorming method to identify seven kinds of risks, such as policy risk, economic risk, social risk, management risk, safety risk and technical risk, the identified risks are evaluated by using fuzzy comprehensive evaluation method. The assessment shows that there are operational risks, safety risks, technical risks and so on. According to the results of risk assessment, appropriate and reasonable methods, such as prevention, reduction, acceptance, reserve and so on, are adopted to deal with the risks, and risk monitoring measures are set up to monitor the whole project stages. Finally, the risk of the whole circulating water project is controlled within a reasonable range.
【学位授予单位】:华东理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TE685

【参考文献】

相关期刊论文 前10条

1 李昂;;石油化工建设项目风险管理研究[J];建筑与预算;2013年09期

2 刘洪浩;;浅议项目风险管理理论[J];学理论;2011年34期

3 钱淑红;赵光荣;;浅析化工、石化类建设项目环境风险评价[J];科技资讯;2011年22期

4 成小江;宋加建;;施工企业的项目风险控制[J];江苏建筑;2010年S1期

5 张秀青;曲丹丹;张令戈;孙娜;;石化项目环境风险评价——以某拟建渣油催化裂解制丙烯等化工原料项目为例[J];安全与环境工程;2009年04期

6 张俊;;浅析项目风险管理与项目管理[J];黑龙江科技信息;2007年13期

7 穆梅;穆军;;EPC项目的风险管理[J];国际经济合作;2006年05期

8 武乾;武增海;李慧民;;工程项目风险评价方法研究[J];西安建筑科技大学学报(自然科学版);2006年02期

9 王要武 ,李晨洋;项目风险辨识[J];企业管理;2005年08期

10 张国兴,胡绍兰;项目风险监控研究[J];基建优化;2005年03期



本文编号:1928308

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/1928308.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户5870d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com