当前位置:主页 > 科技论文 > 石油论文 >

石油修井破碎地锚机的研制

发布时间:2018-10-15 10:22
【摘要】:使用修井作业过程中,经常需要经常进行起下地锚作业,而完成此项作业的设备就是地锚机。修井作业过程中需要井架承受井内管柱及钻具的全部重量,而井架立起来时由于底座面积较小,井架高度均在18米以上,高度较高,如果没有固定装置对井架进行固定,井架便会倒下因此需要用拉线将地锚和地面连接起来,使井架与井口成一定的角度而竖立起来,拉线与地面连接的部件叫地锚。辽河油田所处地区每年冰冻时间长达4个月,且很多井场都是用大块石头垫起,原有地锚机在冬季不能破碎冻土层,需要人工用风镐破碎冻土层;遇到大块石头需要人工进行挖掘,劳动强度大,效率低,基于以上原因研制了破碎地锚机。该地锚机依据东风卡车为载体,采用挖掘机回转方式,能够实现地锚钻头360度旋转,从而扩大了施工范围。本文主要讨论了石油修井破碎地锚机的整体结构,根据设计要求,完成破碎地锚机的总体方案设计,确定主要零部件的结构和尺寸,对主要零部件进行仿真建模及受力分析;并且利用AutoCAD软件画出其主要零部件图及总装配图。最后在机加工车间、铆焊车间对其零部件进行加工、制造、组装,对地锚机现场操作进行了技术要求,最后对该地锚机进行现场使用试验。
[Abstract]:In the process of using workover, it is often necessary to carry on the ground anchor operation, and the equipment that completes this work is the ground anchor machine. During the workover operation, the Derrick needs to bear the full weight of the pipe string and drilling tools in the well, and when the Derrick is erected because of the small base area, the Derrick height is above 18 meters and the height is higher, if there is no fixing device to fix the Derrick, The Derrick will fall, so it is necessary to tie the anchor with the ground, so that the Derrick is set up at a certain angle to the head of the well, and the part connected with the ground is called the anchor. The freezing time of Liaohe oil field is 4 months per year, and many wells are covered with large stones. The original anchor machine can not break the frozen soil layer in winter, but needs manual pneumatic pick to break the frozen soil layer. It is necessary to excavate large blocks of rock by hand, which has the advantages of high labor intensity and low efficiency. Therefore, a broken ground anchor machine is developed for the above reasons. According to the Dongfeng truck as the carrier and the excavator rotary mode, the anchor bit can rotate 360 degrees in this area, thus expanding the scope of construction. This paper mainly discusses the whole structure of the oil workover ground anchor, according to the design requirements, complete the overall scheme design of the crushing ground anchor, determine the structure and size of the main parts, and carry out simulation modeling and force analysis of the main parts. And use AutoCAD software to draw its main parts and assembly drawing. Finally, the parts and components are processed, manufactured and assembled in the machining workshop and riveting workshop, and the technical requirements for the field operation of the ground anchor machine are carried out. Finally, the field use test of the local anchor machine is carried out.
【学位授予单位】:东北石油大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TE935

【相似文献】

相关期刊论文 前10条

1 李剑锋;新一代钻装锚机组诞生[J];有色金属(矿山部分);1997年05期

2 徐锁庚;;国内外掘锚机组的现状及发展趋势[J];煤矿机械;2006年10期

3 平静;齐远智;;退锚机增压设计[J];中小企业管理与科技(下旬刊);2011年05期

4 徐锁庚;;国内外掘锚机组的现状及发展趋势[J];凿岩机械气动工具;2008年03期

5 姚玉煌,刘会文;12—20m~2液压钻装锚机组及其作业线施工分析[J];江苏煤炭;1990年04期

6 张勇;;寸草塔煤矿掘锚机双巷掘进工艺浅析[J];陕西煤炭;2014年02期

7 魏苍栋;焦敬榜;;新型掘锚机的研制及应用[J];科技资讯;2008年15期

8 伍光东;万学锋;;掘锚机组在羊场湾煤矿的应用实践[J];煤炭工程;2009年07期

9 马洪峰;王峗;;掘锚机后配套形式[J];煤矿机械;2009年01期

10 ;EBZ160-JM11掘锚机出厂评议意见[J];煤矿机械;2006年12期

相关会议论文 前1条

1 吴臻;;由两起锚泊作业引发的一些思考[A];2008船舶安全管理论文集[C];2008年

相关重要报纸文章 前2条

1 记者 周升友;以新产品抢占市场制高点[N];中国船舶报;2003年

2 刘林黄 莉忠华;润达新型煤矿用钻装锚机组问世[N];中国工业报;2009年

相关硕士学位论文 前4条

1 张东亮;石油修井破碎地锚机的研制[D];东北石油大学;2015年

2 刘鎏;锚机支撑结构设计方法研究[D];大连理工大学;2013年

3 汪建波;船舶锚机液压集成块设计研究[D];大连海事大学;2010年

4 林恩灵;渔船锚机可视化远程控制系统设计[D];浙江海洋学院;2013年



本文编号:2272239

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/2272239.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户a3f87***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com