寿光—东营天然气支干线工程项目的风险管理研究
[Abstract]:In recent years, the Chinese government has attached great importance to the transportation of oil and gas pipelines. By 2012, the total mileage of the pipeline in China had reached 71,000 kilometers. Pipeline transportation has become the main way of onshore oil and gas transportation. With the construction of natural gas trunk pipeline in West to East Gas Transmission Line and the operation of West China Petroleum (refined Oil) pipeline project, the oil and gas pipeline network in our country has been expanded rapidly. However, the existing pipeline risks still exist, not excluding some hidden safety problems, the corresponding regulatory system and laws and regulations system is not perfect. Shouguang-Dongying natural gas branch project is located in Weifang City and Dongying City Shandong Province construction unit for Shandong Lurun Natural Gas Co. The project is expected to be used in January 2015, after the use of 1.003 billion cubic meters of gas. Risk management of natural gas pipeline is an important task. It must have an overall evaluation before the project is carried out, so as to facilitate the planning, decision making and risk control of the project. Effective risk assessment can promote the rational allocation of all kinds of resources, avoid investment risk and maximize investment benefit. In this paper, the risk management in the implementation of Shouguang-Dongying Natural Gas Branch Project is studied by the methods of enumeration, pre-analysis of risk factors and event tree analysis, and based on the analysis of relevant risk management theory, The risk identification, evaluation, response and monitoring of the implementation project are systematically analyzed. Finally, the risk management of the development project is evaluated. Through the research of this paper, the aim is to find out the risk in the implementation of the project and manage it reasonably, so as to ensure the smooth implementation of the project. In this paper, the basic theory system and basis of pipeline project risk management are systematically discussed, and the construction project of Shouguang-Dongying natural gas project is analyzed. Then the risk identification and risk evaluation of Shouguang-Dongying natural gas construction project are carried out. The concrete assessment of the project is made from the internal risk and external risk. Finally, the concrete risk countermeasures are put forward. The risk always exists in the construction of Shouguang-Dongying natural gas pipeline project from the decision-making stage to the commissioning. The overall risk level of the project is high through the risk evaluation results of the project. Among the six kinds of risks, the construction risk is the highest, the economic risk and financing risk is the next, the policy risk is the second, the risk degree of the examination and approval risk is general, and the risk degree of risk decision is the smallest. This paper puts forward the concrete measures to deal with the project risk after evaluation, so that the risk can be controlled in the whole process to ensure the smooth implementation of the construction project of Shouguang-Dongying natural gas project and achieve the expected benefit.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TE88
【相似文献】
相关期刊论文 前10条
1 ;西气东输二线轮吐支干线投产运行[J];石油工程建设;2012年06期
2 本刊通讯员;;西气东输二线轮吐支干线投产运行[J];煤气与热力;2013年01期
3 本刊通讯员;;西气东输二线平泰支干线平薛段建成投产[J];煤气与热力;2012年08期
4 本刊通讯员;;西气东输二线上海支干线一标段主体完工[J];煤气与热力;2011年05期
5 本刊通讯员;;西气东输二线南宁支干线京广铁路穿越工程竣工[J];煤气与热力;2012年07期
6 本刊通讯员;;西气东输二线广南支干线第一标段打火开焊[J];煤气与热力;2011年12期
7 本刊通讯员;;西气东输二线南昌—上海支干线抚河盾构工程贯通[J];煤气与热力;2012年09期
8 本刊通讯员;;西气东输二线湘潭支干线建成投产[J];煤气与热力;2011年09期
9 本刊通讯员;;西气东输二线广南支干线盾构工程如期贯通[J];煤气与热力;2012年12期
10 本刊通讯员;;西气东输二线广南支干线全线贯通[J];煤气与热力;2013年02期
相关重要报纸文章 前10条
1 记者 刘爽;西二线支干线建设驶入快车道[N];中国石油报;2011年
2 洪伟 赵静;二公司南昌~上海支干线七标段最长隧道穿越成功[N];石油管道报;2011年
3 记者 蒋万全;西二线轮南支干线打火开焊[N];中国石油报;2011年
4 特约记者 才永欣;西二线东段召开南昌~上海支干线专题会议[N];石油管道报;2010年
5 记者 林培军 特约记者 张强 郭志英;西二线南宁支干线开工[N];石油管道报;2011年
6 徐江;孙全军到南昌——上海支干线现场督导慰问[N];石油管道报;2011年
7 李兵;建设公司南昌~上海支干线顶管隧道贯通13条[N];石油管道报;2011年
8 本报记者 杜洪武;“数”说广南支干线[N];石油管道报;2011年
9 记者 杜洪武;西二线广南支干线正式投产[N];石油管道报;2012年
10 潘盼;《西二线6条支干线安全设施设计专篇》通过审查[N];石油管道报;2011年
相关硕士学位论文 前1条
1 薛爱英;寿光—东营天然气支干线工程项目的风险管理研究[D];中国海洋大学;2015年
,本文编号:2298495
本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/2298495.html