J油田堵水调剖措施效果评价
[Abstract]:When the target block of J oilfield enters the stage of middle and high water cut, the efficiency of water drive decreases and the plane contradiction intensifies. In order to improve oil recovery and alleviate plane contradiction, water plugging and profile control measures have become one of the main countermeasures. According to the characteristics of low permeability fractured reservoir, through the systematic analysis and summary of theoretical calculation, laboratory experimental data, field dynamic and static data and test data, the variation law of water cut and production rate in target block of J Oilfield is studied in depth. The change trend of each index is forecasted. By comparing the indexes before and after the water shutoff and profile control measures, the effects of water shutoff profile control on the control of water cut rising speed and production decline rate are studied, and the oil increment, precipitation and validity period of the measures in the study area are calculated. The technical effect of profile control and profile control for water plugging was evaluated. Based on the comparison of development effects among different profile control wells in the study area, the effects of reservoir permeability, heterogeneity, water cut before profile control and injection profile control system on profile control were studied. By means of statistical regression analysis, the relationship between profile control effect and influencing factors was studied quantitatively, and the relationship chart between profile control oil quantity and influencing factors was established. The research results show that the water cut rising law of target block in J oilfield has the characteristics of typical low permeability fractured reservoir, and the water cut rising pattern is divided into three types: fracture, fracture-porosity and porosity. The whole water cut rising pattern of the block shows the characteristics of fracture and porosity, the water cut rising speed is fast in the middle and low water cut period, the water cut rising speed is slowed down after the high water cut period, and it is in the water cut fast rising stage at present. The effect of water shutoff and profile control measures on water shutoff and profile control has been observed in different types of wells in target blocks. After 34 profile control measures, the average cumulative precipitation of single well group is 2076.37 m3, and the water cut rise rate is reduced by 0.77%. The decline rule of water drive production in target block is hyperbolic decline type. After 34 profile control well groups, the cumulative oil increment of single well group is 784.29 t, and the validity period is 19 months. The important factors influencing the effect of water plugging and profile control include the timing of measures, injection system, permeability, thickness and fracture development of reservoir. According to the results of quantitative study on the influencing factors of water shutoff and profile control measures, the water cut and non-uniform coefficient of water cut before the measures have the greatest influence on the oil increasing amplitude of the measures. The effect of reservoir permeability and thickness on the oil increase amplitude is relatively small. In J Oilfield, the regional measures with large reservoir thickness, high permeability and prominent plane contradiction are better in selecting wells by water plugging and profile control. In terms of the type of water appearing, the effect of the measures of the porosity well group is better, and the effect of the measures before the middle water cut period (less than 60% of the water cut) is better than that of the other measures. In the selection of profile control system, the composite plugging agent of association gel pre-crosslinked particle inorganic gel and the sealing agent of weak gel particle inorganic system are better. Through the research, a set of evaluation method of field test effect is formed, which takes oil production and water cut as the main evaluation index. Through the study of the change law of each index under the condition of no measure of water flooding, the characteristics of actual development indexes of water plugging and profile control field are compared. The oil increase and precipitation of profile control measures for water shutoff are calculated. Based on the percolation mechanism of ultralow permeability oil field and the combination of theoretical analysis and oilfield development practice, each index calculation method has high application value.
【学位授予单位】:东北石油大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TE358.3
【参考文献】
相关期刊论文 前10条
1 朱圣举;赵向原;张皎生;王靖华;张阳禹;刘萍;焦军;曾联波;;低渗透砂岩油藏天然裂缝开启压力及影响因素[J];西北大学学报(自然科学版);2016年04期
2 刘传斌;姜汉桥;李俊键;糜利栋;赵林;乐雪霖;;预测页岩气产量递减组合模型的研究[J];断块油气田;2015年04期
3 聂延波;吴晓慧;乔霞;王月艳;张少伟;;丁型水驱特征曲线在东河砂岩油藏开发指标预测中的应用[J];新疆石油地质;2015年02期
4 薛颖;石立华;席天德;;童氏水驱曲线的改进及应用[J];西南石油大学学报(自然科学版);2015年01期
5 王涛;邓晗;高档;张钧茹;;神经网络在底水油藏直井含水上升预测中的应用[J];中国石油和化工;2014年12期
6 苗彦平;唐林;高遵美;刘玉奎;;边水油藏水平井含水上升规律影响因素研究[J];油气藏评价与开发;2013年05期
7 王涛;;底水油藏直井含水上升预测新方法的建立[J];岩性油气藏;2013年05期
8 蔡华;付随艺;程时清;;裂缝性页岩气藏考虑应力敏感的产量递减模型构建[J];科技导报;2013年24期
9 宋兆杰;李治平;赖枫鹏;刘刚;甘火华;;高含水期油田水驱特征曲线关系式的理论推导[J];石油勘探与开发;2013年02期
10 刘英宪;赵春明;马奎前;周海燕;任晓宁;;一种新的稠油油藏双曲递减模型[J];中国海上油气;2012年05期
相关硕士学位论文 前3条
1 宫壮壮;西峰油田深部调剖技术研究与应用[D];西安石油大学;2014年
2 李锋;低渗透油田产量递减规律研究[D];西安石油大学;2013年
3 徐群;非线性回归分析的方法研究[D];合肥工业大学;2009年
,本文编号:2305407
本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/2305407.html