庆铁线扩能安全改造工程后评价研究
[Abstract]:Post-project evaluation occupies an important position in the whole project cycle. The domestic industries pay more and more attention to the post-project evaluation, and strengthen the research and application of the theory and method of post-project evaluation. In order to improve the project management level and investment income of the project, CNPC put forward the requirements of post-project evaluation. However, in the current petroleum enterprises, many enterprises carry out the post-project evaluation work is simplified post-evaluation, there is no in-depth analysis and evaluation of the project. The purpose of this paper is to set up a complete evaluation index system of Qingtie railway line expansion safety reconstruction project, and then to carry out detailed post-evaluation and find out the problems, taking the Qingqing railway line capacity expansion safety reconstruction project as an example. It can be used for reference in the later stage of pipeline construction. On the basis of deep research on the relevant theory of post-evaluation work, combined with the actual situation of the QingyingRailway line capacity expansion and reconstruction project, this paper constructs the post-evaluation index system of the QingyingRailway line expansion safety reconstruction project. In the post-evaluation index system of the project, five primary evaluation indexes, namely, pre-work, construction implementation, production operation, investment and financial benefit, impact and sustainability, are set. Several secondary evaluation indexes are set up under each evaluation index, and the weight of each index is determined by using the analytic hierarchy process (AHP). Based on the post-evaluation index system of Qingtie railway line capacity expansion and reconstruction project, this paper makes a detailed post evaluation on the Qingtie railway line expansion safety reconstruction project. The fuzzy comprehensive evaluation method of degree of success is applied to the comprehensive post-evaluation of the project of capacity expansion and reconstruction of Qing-tie railway line. Based on the analysis of the post-evaluation results, this paper summarizes the problems existing in the development, construction and operation of the Qingqing Railway Line's capacity expansion and transformation project, extracts the representative problems, and provides a reference for the later construction of pipeline engineering. Thus, the investment income of pipeline engineering is improved.
【学位授予单位】:中国石油大学(华东)
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TE973
【参考文献】
相关期刊论文 前10条
1 段云龙;周静斌;申晓静;;基于熵权TOPSIS法的房地产项目后评价模型研究[J];项目管理技术;2011年09期
2 孙慧;范志清;孙晓鹏;;基于模糊综合评价的BOT高速公路建设项目后评价[J];统计与决策;2011年04期
3 牛东晓;李建青;;基于物元可拓模型的火电厂建设项目过程后评价研究[J];华北电力大学学报(自然科学版);2010年06期
4 高军;高颖;;对成品油销售网络投资项目后评价指标体系构建的探讨[J];国际石油经济;2010年07期
5 方兴君;赵连增;杜敏;高军;丁世强;;对改进投资项目后评价方法体系的探讨[J];国际石油经济;2010年04期
6 黄旭楠;李华启;王锡柱;;油气勘探项目后评价指标体系与定量化评价[J];国际石油经济;2010年01期
7 杜静;;对汶川震后恢复重建项目后评价工作的探讨[J];科技进步与对策;2009年21期
8 关永;蹇瑞红;刘景武;;项目后评价工作实践探讨[J];当代化工;2009年03期
9 丁海潮;陈惠玲;管殿聆;张伟;;城市基础设施建设项目施工阶段后评价及案例分析[J];建筑经济;2009年04期
10 王尊先;;基于成功度综合评价模型的水电工程施工后评价[J];南水北调与水利科技;2008年05期
相关博士学位论文 前1条
1 杨文升;油气田产能建设项目后评价研究[D];哈尔滨工程大学;2009年
相关硕士学位论文 前5条
1 张程;东北电力市场试点项目的后评价研究[D];华北电力大学(北京);2010年
2 王宝光;LB地区原油勘探项目技术经济后评价研究[D];吉林大学;2010年
3 高芳;中石大青岛校区一期工程建设项目后评价研究[D];中国石油大学;2009年
4 文俊;青龙路加油站工程建设项目后评价[D];重庆大学;2008年
5 赵雪;高速公路项目过程后评价研究及应用[D];南京航空航天大学;2007年
,本文编号:2331991
本文链接:https://www.wllwen.com/kejilunwen/shiyounenyuanlunwen/2331991.html