二滩水电站计算机监控系统问题分析与改造
[Abstract]:With the rapid economic growth of our country, the demand for energy, especially for electricity, has increased correspondingly, which has also promoted the rapid development of the electric power industry. With the increasing scale of power network and the increasingly severe network security situation, the security, reliability, stability and power quality of power supply enterprises are required higher. Especially for the power generation enterprise computer monitoring system put forward higher requirements. Ertan Hydropower Station is the largest hydropower station in China in the 20th century. At present, Ertan Hydropower Station is still the main power station in Southwest Power Grid, which is responsible for peak-shaving, frequency modulation and other important functions. Ertan Hydropower Station has been in operation since 1998, and the computer monitoring system has been in operation for more than ten years. Since Ertan Hydropower Station, a number of large and even giant hydropower stations have been built in China. This paper analyzes the defects of the original computer monitoring system of Ertan Hydropower Station, the equipment performance can not meet the requirements of power standards, and the inextensibility of the system, and analyzes the inevitability of the transformation of the original computer monitoring system of Ertan Hydropower Station. Then, by studying the feasibility of computer monitoring system network structure, upper computer, lower computer, AGC/AVC system, hydrologic communication and dispatching communication, we find a safe and feasible reconstruction scheme that meets the practical requirements. The key points and difficulties in the reconstruction work are analyzed, and the technical innovation points of the transformation of the computer monitoring system of Ertan Hydropower Station are listed. Finally, by analyzing the technical advantages of the computer monitoring system after the transformation, and comparing with the original monitoring system, the improvement work of the computer monitoring system is evaluated. This paper summarizes and refines the technical strategy of safety reformation of large-scale hydropower station calculation and monitoring system.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TP277
【参考文献】
相关期刊论文 前8条
1 彭永锋;;104规约通信在远动系统的应用[J];科技资讯;2010年02期
2 刘小力;;二滩电厂监控系统简介[J];科协论坛(下半月);2009年01期
3 裘坤;李华军;何应坚;;控制系统冗余设计和分析[J];自动化仪表;2008年12期
4 刘念,滕福生,谢驰;发电厂计算机监控技术[J];电气时代;2004年02期
5 陈邦蓉;水电厂计算机监控系统发展趋势[J];四川电力技术;2003年05期
6 方辉钦,施冲,朱辰,庞敏,彭永,吴正义;水电厂无人值班与监控系统改造[J];水电自动化与大坝监测;2003年01期
7 杨金栋;我国水电厂技术改造综述[J];水力发电;1999年09期
8 蔡运清;北美变电站自动化现状[J];电力系统自动化;1997年07期
相关硕士学位论文 前10条
1 张俊玮;柘林水电厂计算机监控系统改造的研究与应用[D];华北电力大学;2015年
2 汪正江;基于网络监听的IEC60870-5-104通信规约测试方法研究[D];上海交通大学;2013年
3 余明明;基于混沌粒子群算法的大型水电站自动电压控制优化研究[D];华中科技大学;2013年
4 周彤;水电站计算机监控系统的设计与实现[D];北京工业大学;2012年
5 李岚;水电厂计算机监控系统的研究与设计[D];太原理工大学;2011年
6 方荣华;某水电厂计算机监控系统的设计与实现[D];华中科技大学;2010年
7 何旭东;小型水电站技改监控系统的设计与实现[D];电子科技大学;2010年
8 王凤利;太平哨水电厂计算机监控系统的设计与实现[D];华北电力大学(河北);2010年
9 洪浩;三峡电源电站计算机监控系统的研究与实现[D];重庆大学;2008年
10 赵会成;基于PCC的水电站计算机监控系统的研究[D];河北工业大学;2007年
,本文编号:2370128
本文链接:https://www.wllwen.com/kejilunwen/zidonghuakongzhilunwen/2370128.html