不完全合同视角下利率对PPP项目事前投资的影响研究
发布时间:2018-01-29 07:18
本文关键词: 不完全合同 利率 PPP 事前投资 出处:《中南大学学报(社会科学版)》2017年03期 论文类型:期刊论文
【摘要】:由于不能对未来事项进行完备地描述和约定,PPP项目是一种不完全合同的情况,利率的变动会对不可证实的事前投资产生影响。通过构建引入利率项的不完全合同模型,针对利率变动对于PPP项目事前投资的影响进行了研究。研究发现:(1)与社会最优水平相比,两种所有制下成本创新投资和质量创新投资均存在扭曲。(2)利率上升会对外部经营者构成事前投资的负向激励。(3)与社会最优水平相比,利率上升时,事前投资扭曲程度减弱;利率下降时,事前投资扭曲程度增加。(4)政府应当根据不同的目标合理选择财税政策。
[Abstract]:The PPP project is an incomplete contract because it is not possible to fully describe and agree on the future events. Interest rate changes will have an impact on unverifiable prior investment. An incomplete contract model is constructed to introduce interest rate terms. This paper studies the effect of interest rate change on the pre-investment of PPP project. The cost innovation investment and the quality innovation investment under the two kinds of ownership have twisting. 2) the interest rate rise will form the negative incentive. 3) compared with the social optimum level, the interest rate will rise. The distortion degree of investment in advance is weakened; When interest rates fall, the distortion of investment in advance increases. 4) the government should choose fiscal and taxation policies according to different objectives.
【作者单位】: 西安交通大学经济与金融学院;
【基金】:陕西省社科界2016年度重大理论与现实问题研究项目“新丝绸之路经济带产业合作中企业最优化行为问题研究”(2016Z139)
【分类号】:F285;F822.0
【正文快照】: 一、引言PPP(Public-Private-Partnership)模式是一种新型的项目融资模式,是指政府与社会资本之间为了提供某种公共物品和服务,以特许权协议为基础,彼此之间形成一种伙伴式的合作关系,并通过签署合同来明确双方的权利和义务,以确保合作的顺利完成,最终使合作各方达到比预期单
【参考文献】
相关期刊论文 前6条
1 王玺;夏强;;政府与社会资本合作(PPP)财政承诺管理研究——以青岛地铁X号线PPP项目为例[J];财政研究;2016年09期
2 庆丽;;PPP协议中公共工程合作方经营权与公民公共服务选择权的冲突及其协调研究——基于PPP协议排他性条款的分析[J];中南大学学报(社会科学版);2016年02期
3 g,
本文编号:1472872
本文链接:https://www.wllwen.com/guanlilunwen/caiwuguanlilunwen/1472872.html