泸州港项目施工进度控制动态管理研究
[Abstract]:Our country is in the most concentrated infrastructure, the fastest speed of urbanization period, the scale of engineering construction ranks first in the world. Improving the dynamic management level of project construction schedule control will bring great economic benefits and at the same time strictly control the quality of the wharf and improve the efficiency of the whole construction process to a certain extent. Whether the dynamic management mode of construction schedule control of Luzhou Port project is successful or not is directly reflected in the three elements of quality, cost and schedule in engineering construction. This paper makes a comparative study on the dynamic management mode of construction schedule control in Luzhou Port from the three dimensions of quality, cost and schedule, and analyzes the influence of different dynamic management modes on the construction process. In the course of the research, through literature review and expert interview, the author qualitatively analyzed the dynamic management mode of project construction schedule control used both at home and abroad. This paper also analyzes the factors that influence the dynamic management mode selection of the construction schedule control of Luzhou Port Project based on the 4M1E method. In order to achieve the objective conditions necessary for the implementation of the foreign advanced project construction schedule control dynamic management mode in Luzhou Port project. Finally, the dynamic management mode of Luzhou Port project construction schedule control is obtained under the current conditions. The analysis and comparison of the dynamic management mode of construction schedule control at home and abroad will help to improve the dynamic management mode of domestic project construction schedule control. There are still many obstacles and problems in the development of the dynamic management mode of construction schedule control in Luzhou Port Project. In the future, it needs to be further promoted and applied in the fields of information management, labor integration, the perfection of contracts, and so on. Only in this way can the whole domestic construction enterprises gradually move towards standardization and internationalization. The innovation of this paper is to focus on the dynamic management mode of project construction schedule control. Based on the comparative analysis of the quality, cost and schedule management of the Luzhou Port project, the factors influencing the dynamic management mode selection of the project construction schedule control are theoretically analyzed based on the 4M1E method. Through the discussion of this paper, it is possible to make the practitioners of dynamic management of construction schedule control of Luzhou Port realize the importance and necessity of studying the dynamic management mode of project construction schedule control. This paper also introduces the influence of construction technology and labor quality on the dynamic management mode of project construction schedule control, and makes a case study. The research shows that the time limit can be shortened effectively by improving it to a certain extent.
【学位授予单位】:电子科技大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU722
【相似文献】
相关期刊论文 前10条
1 李金锋;;探析如何保障建设工程施工进度控制[J];中小企业管理与科技(下旬刊);2010年08期
2 阮敏飚;;谈如何保障建设工程施工进度控制[J];价值工程;2010年22期
3 王志坚;王中明;;浅析工程项目施工进度控制[J];黑龙江科技信息;2011年01期
4 雷军;杨欢民;;工程施工进度控制浅析[J];河南水利与南水北调;2011年14期
5 郭庆丰;;对做好建筑工程施工进度控制的探讨[J];河北企业;2013年10期
6 黄正东;;建筑施工进度控制探析[J];河南建材;2013年06期
7 朱生;;关于建筑工程之中施工进度控制的探究[J];科技资讯;2013年35期
8 郭小平,黄小斌;浅析现代工程项目施工进度控制[J];当代建设;2003年04期
9 刘肇生,李满瑞,杨倩;综合楼工程的施工进度控制解析[J];北京建筑工程学院学报;2005年02期
10 王东胜,杨佃忠;工程项目的施工进度控制[J];煤矿现代化;2005年04期
相关会议论文 前2条
1 鲁顺伟;孙翠萍;;马关拉气水电站工程施工进度控制与管理[A];2009年云南电力技术论坛论文集(文摘部分)[C];2009年
2 张思源;崔振豹;李辉;;浅谈工程项目的施工进度控制[A];土木建筑学术文库(第8卷)[C];2007年
相关重要报纸文章 前3条
1 中国新兴建设开发总公司三公司 张宏;浅谈工程施工进度控制对项目经济效益的影响[N];中华建筑报;2012年
2 通讯员 尚念圣 刘金栋;市公路局打响重点工程建设百日攻坚战[N];莱芜日报;2009年
3 记者 穆广田 通讯员 马永良;“项目法”树立管理新形象[N];中国石油报;2003年
相关硕士学位论文 前8条
1 岳大云;AP1000核电项目施工进度控制研究[D];大连海事大学;2015年
2 黄身望;楼盘住宅精装修施工进度控制系统研究与开发[D];浙江大学;2015年
3 李应祥;泸州港项目施工进度控制动态管理研究[D];电子科技大学;2014年
4 王伟夫;青岛市大村河工程施工进度控制研究[D];中国海洋大学;2008年
5 李季;建设工程施工进度控制研究[D];中国海洋大学;2008年
6 赵中光;华夏麒麟工程项目施工进度控制研究[D];华南理工大学;2012年
7 杜云峰;长春国际广场工程项目施工进度控制研究[D];吉林大学;2015年
8 王雪艳;多项目并行施工进度控制与协调研究[D];西安建筑科技大学;2011年
,本文编号:2179794
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2179794.html