地铁车站近建筑物深基坑施工安全风险因素及评估方法研究
[Abstract]:At present, with the rapid development of urbanization in our country, the shortage of urban space resources is becoming more and more obvious. The construction of subway can greatly relieve the pressure of ground transportation and reduce the demand of urban ground space. However, often the ground buildings in cities are already full of tall buildings, and the subway has only begun to plan and build the subway. In addition, the intersection of the lines also causes the stations to become deeper and deeper. This kind of lag in the development of underground space has brought a lot of difficulties to the later construction of the subway. It also gives safety to the construction of the project. In particular, the safety of subway station construction put forward a severe challenge. This paper makes a deep theoretical study on the risk factors and evaluation of the construction safety of the near building deep foundation pit in subway construction. The full text is divided into six parts. The first chapter is the introduction, expounding the research background and present situation of the safety risk factor cause theory, and through the research to the existing literature, then gives the research method, the second chapter summarizes the construction characteristic and the dangerous source of the deep foundation pit near the building; In the third chapter, through the research of hazard identification and accident cause mechanism, as well as the field investigation, the key influencing factors system of the construction safety of the near building deep foundation pit is designed synthetically. In the fourth chapter, the comparative judgment matrix is constructed by using the analytic hierarchy process (AHP), and the relative weights among the factors in the safety risk evaluation index system are calculated when the deep foundation pit is close to the existing building. In the fifth chapter, the basic problems of extension theory and matter-element are studied, and the evaluation index system is constructed, and based on the matter-element extension theory, the multi-factor comprehensive assessment of the construction safety risk of the deep foundation pit near the building is carried out. The sixth chapter is the conclusion and prospect, including the conclusion of this paper and the direction of further research.
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753
【参考文献】
相关期刊论文 前10条
1 董康;郭勇;李鹏;;简析建筑施工中安全管理的问题及防止措施[J];科技与企业;2012年22期
2 杜佐光;徐智棋;;公路及市政交通工程的安全管理[J];建筑;2012年22期
3 何贵霞;;施工人员不安全行为产生原因及管理对策[J];安全、健康和环境;2011年09期
4 王海军;;模糊综合评价在地铁盾构进出工作井施工风险分析中的应用[J];西部探矿工程;2011年03期
5 李卫华;;Agent协助建立矛盾问题的可拓模型研究[J];数学的实践与认识;2009年04期
6 陈一壮;;论贝塔朗菲的“一般系统论”与圣菲研究所的“复杂适应系统理论”的区别[J];山东科技大学学报(社会科学版);2007年02期
7 石少华;;《生产安全事故报告和调查处理条例》系列解读之二 事故报告和调查处理的若干基本问题[J];现代职业安全;2007年06期
8 韦晨;孙俊;;城市地铁站点施工期交通组织方案研究——以南京市地铁二号线为例[J];现代城市研究;2006年10期
9 吕胜普;李建设;杨飞雪;;多事件交叉干扰下的工期索赔方法[J];土木工程学报;2005年11期
10 陈科荣;城市建设施工安全重大危险源辨识与防治[J];施工技术;2004年08期
相关博士学位论文 前4条
1 徐圆;可拓理论在过程工业中的应用研究[D];北京化工大学;2010年
2 苏楠;基于可拓逻辑的产品族配置设计方法[D];浙江工业大学;2009年
3 杨涛;技术灾害的致灾因素分析及其风险评价体系的研究[D];中国地震局地球物理研究所;2007年
4 郑余朝;三孔并行盾构隧道近接施工的影响度研究[D];西南交通大学;2007年
相关硕士学位论文 前1条
1 宋平;铁路隧道施工安全风险管理研究[D];中南大学;2009年
,本文编号:2420211
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2420211.html