三峡翻坝铁路年底前开建
发布时间:2018-01-06 22:33
本文关键词:三峡翻坝铁路年底前开建 出处:《施工技术》2017年05期 论文类型:期刊论文
更多相关文章: 点军区 铁水联运 线路全长 前开 通过能力 设计能力 武汉铁路局 极限值 茅坪 交通运输体系
【摘要】:正三峡翻坝铁路是长江三峡江南铁水联运项目重要组成部分,投资32.97亿元,线路全长42.56km,铁路等级II级,自宜万铁路宜昌南站引出,经宜昌市点军区、夷陵区,终点接入秭归县三峡翻坝物流园茅坪港。据了解,按最大设计能力,三峡大坝永久船闸到2030年货物通过能力达到极限值1亿t。但2011年,三峡大坝永久船闸货物通过能力已提前
[Abstract]:Is the Three Gorges Fanba railway is an important part of the Three Gorges of the Yangtze River south of iron transport projects, investment of 3 billion 297 million yuan, the line length of 42.56km, railway grade II, Wanzhou railway from Yichang south station leads through Yichang City District, Yiling District, Zigui County, the Three Gorges end point access over Port Logistics Park Dam Ping Mao. It is understood, according to the maximum ability to design, the Three Gorges Dam permanent shiplock to 2030 goods through the capacity reaches the limit value of 100 million T. in 2011, Three Gorges Permanent Shiplock capacity has been advanced by the goods
【分类号】:F532.8
【正文快照】: 三峡翻坝铁路是长江三峡江南铁水联运项目重要组成部分,投资32.97亿元,线路全长42.56km,铁路等级II级,自宜万铁路宜昌南站引出,经宜昌市点军区、夷陵区,终点接入秭归县三峡翻坝物流园茅坪港。据了解,按最大设计能力,三峡大坝永久船闸到2030年货物通过能力达到极限值1亿t。但20
【相似文献】
相关期刊论文 前1条
1 李伟;刘晓华;;宜昌点军区五龙片区修建性详规设计方案向国内招标[J];城市规划通讯;2002年13期
相关重要报纸文章 前10条
1 通讯员 王新 赵启喜;点军区以项目带动“三城联创”[N];三峡日报;2007年
2 通讯员 赵启喜邋万桥;点军区:“三个必须”推进“三城联创”[N];三峡日报;2008年
3 通讯员 王树华邋杨劭羽;点军区实施教育五年脱困进步工程[N];三峡日报;2008年
4 通讯员 王新 董军;点军区第一季度工业产值增一倍[N];三峡日报;2006年
5 记者 龚昌俊 通讯员 望进;点军区连续3年经济增长14%[N];三峡日报;2007年
6 通讯员 王新;下决心解决农民的实际问题[N];三峡日报;2007年
7 邬晓光邋程会农;宜昌市点军区政协围绕“科教兴区”履职成效显著[N];人民政协报;2007年
8 通讯员 陈轩邋王新;点军区着力建设效能型机关[N];三峡日报;2008年
9 通讯员 赵启喜;点军区千余农户自购体育器械[N];湖北日报;2008年
10 通讯员 赵启喜 余恒 张勇;点军区百名党代表主动认“穷亲”[N];三峡日报;2009年
,本文编号:1389819
本文链接:https://www.wllwen.com/guanlilunwen/wuliuguanlilunwen/1389819.html