HC钢材物流基地建设投资项目经济性评价
本文选题:钢材物流 + 建设投资项目 ; 参考:《哈尔滨工程大学》2015年硕士论文
【摘要】:随着经济全球化、区域经济一体化进程的加快,我国现代物流业的发展呈现出新的态势。目前,区域钢材消费日益旺盛,市场需求快速增长。然而,国内各大型钢铁企业还没有一家在哈尔滨乃至黑龙江设立钢材流通加工与配送中心,且哈尔滨既有钢材市场流通加工能力有限、产品单一,不具有为高端客户提供钢材流通加工与配送服务的能力。此时建设HC钢材物流基地,开展钢材流通加工配送和电子商务业务,是快速抢占哈尔滨钢材物流市场,特别是高端市场的迫切需要。由于钢材物流基地建设项目投资具有金额大、风险高等特点,因而在投资之前进行项目的经济效益评价与分析对降低投资风险具有重要的意义。本论文对HC钢材物流基地建设投资项目的论文写作背景、研究目的及写作意义进行了阐述。对HC钢材物流基地建设投资项目建设单位基本情况、建设内容、项目建设的需求分析、组织结构和市场分析等方面做了介绍,为经济效益评价提供真实的基础信息;本文对该项目的投资回收期、内部收益率和财务净现值进行了预测;运用经济效益评价的相关理论对项目进行了盈亏平衡分析、财务评价、敏感性分析;为防止项目失去控制深入分析了该项目存在的风险,并结合项目的实际研究相应有效的控制措施;建成本项目可以从环境保护效益、就业效益、区域经济效益等方面为公司带来众多的社会效益;结合HC钢材物流基地建设投资项目的特点,构建了 HC钢材物流基地建设投资项目的经济效益评价指标体系,对该项目的经济效益进行评价和分析,给出了相应投资决策意见,评价结果显示本文提出的经济性评价方法具有较好的经济性,是切实可行的。
[Abstract]:With the development of economic globalization and regional economic integration, the development of modern logistics industry in China presents a new trend. At present, regional steel consumption is increasingly strong, rapid growth in market demand. However, none of the large domestic iron and steel enterprises have set up a steel circulation processing and distribution center in Harbin or even Heilongjiang, and Harbin has a limited circulation and processing capacity in the steel market and a single product. Do not have the ability to provide high-end customers with steel circulation processing and distribution services. At this time the construction of HC steel logistics base, steel circulation, processing, distribution and e-commerce business, is the urgent need to seize the Harbin steel logistics market, especially the high-end market. Because the investment of the steel logistics base construction project has the characteristics of large amount of money and high risk, it is of great significance to evaluate and analyze the economic benefits of the project before the investment. This paper describes the background, purpose and significance of the investment project of HC steel logistics base. This paper introduces the basic situation, construction content, demand analysis, organization structure and market analysis of the construction investment project of HC steel logistics base in order to provide real basic information for economic benefit evaluation. This paper predicts the investment payback period, the internal rate of return and the financial net present value of the project, analyzes the break-even, the financial evaluation and the sensitivity of the project by using the relevant theory of economic benefit evaluation. In order to prevent the project from losing control, the risk of the project is deeply analyzed, and the corresponding effective control measures are studied in combination with the actual situation of the project, and the benefits of environmental protection and employment can be obtained from the completion of the project. According to the characteristics of HC steel logistics base construction investment project, the evaluation index system of HC steel logistics base construction investment project is established. The economic benefits of the project are evaluated and analyzed, and the corresponding investment decision opinions are given. The evaluation results show that the economic evaluation method proposed in this paper has good economy and is feasible.
【学位授予单位】:哈尔滨工程大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.31;F252
【参考文献】
相关期刊论文 前10条
1 陈梓炜;李圆;;多因素敏感性分析在项目经济评价中的运用[J];价值工程;2014年33期
2 李宏艳;;浅析工程建设投资项目的经济评价[J];黑龙江科技信息;2014年10期
3 张群桥;;石油勘探开发项目经济评价方法研究[J];中国石油和化工标准与质量;2013年11期
4 梁冬梅;;哈大齐工业走廊物流区域运输网络研究[J];物流工程与管理;2013年05期
5 邢玉玲;;浅谈建筑工程项目的经济评价[J];中国高新技术企业;2013年13期
6 翟三社;李林伟;;建设项目经济评价若干问题探讨[J];建筑经济;2013年01期
7 王成;姜在炳;;煤矿区煤层气抽采项目经济评价方法及其应用[J];煤田地质与勘探;2012年05期
8 李岚;;建设项目经济评价指标同一性的理论与应用[J];建筑经济;2012年03期
9 江大庆;贾彪;;论建设项目经济评价方法及方案优选[J];商场现代化;2008年25期
10 张慧洁;;建设项目财务评价基准收益率的确定方法[J];商场现代化;2007年19期
相关硕士学位论文 前9条
1 魏建叠;S公司年产5万吨环保型增塑剂投资项目经济评价[D];中南大学;2014年
2 张国东;新沪昆铁路客运专线贵州段项目管理研究[D];大连海事大学;2014年
3 彭丰年;GYGJ项目经济评价与投资风险分析[D];华南理工大学;2013年
4 薛雯;S市钢铁物流中心项目建筑施工成本控制研究[D];中国海洋大学;2013年
5 胡晓宇;锡林河化肥公司工程项目经济性评价研究[D];华北电力大学;2013年
6 郝志刚;集宁北220kV变电站10kV配出工程项目经济性评价[D];华北电力大学;2012年
7 庄严;粉煤灰综合利用建设项目经济效益评价[D];哈尔滨工程大学;2011年
8 王凡;基于多重评价模型的配电网经济性评价[D];燕山大学;2010年
9 焦峰;祥和水电站项目经济评价与风险评价研究[D];中南大学;2009年
,本文编号:1871560
本文链接:https://www.wllwen.com/guanlilunwen/wuliuguanlilunwen/1871560.html