H电梯成品仓储管理改善研究
[Abstract]:The logistics warehousing operation of elevator finished goods is a link of warehousing integration on the basis of "manufacturer's inventory plus direct delivery". Because of the large fluctuation of the terminal customer's job demand, the imperfection of the job plan arrangement and the lack of effective operation efficiency management system, the problem of resource allocation waste exists in the operation of the finished product warehouse of H elevator. Therefore, on the basis of the current operation mode, it is of great practical significance to take some targeted improvement measures to further optimize the utilization ratio of site, personnel and equipment, and to provide service quality. In this paper, the present situation, existing problems and reasons of warehouse operation are described qualitatively, and the operational capacity and operational requirements are quantitatively analyzed. Especially focus on the key position crane group and forklift hand in the front line operation, the routine work contents of the working day, receiving, unloading, stocking, loading and unloading, and the distribution of demand and the urgency of completion of the work in different time periods (by the hour). Then, based on the theory of queuing theory and man-hour quota method, a loading and unloading operation model is established by using Arena simulation software. In this paper, the personnel and other resource requirements are simulated, and the reasons for the difference between the theoretical calculation of man-hour and the actual allocation of personnel are pointed out by combining with the theoretical man-hour demand of storage and stock-keeping operations. Finally, three improvement measures are put forward, which are reducing the uncertainty of operation demand, standardizing the operation standard and improving the work efficiency, and optimizing the work schedule. Furthermore, the effect of improvement is predicted and analyzed by combining simulation model and man-hour accounting. This paper provides a more scientific and effective reference for the operation and management of the finished product warehouse of H elevator. Although there are some limitations, it breaks through the management thinking that only stays in oral and subjective consciousness in the past.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.4;F274
【相似文献】
相关期刊论文 前10条
1 魏瑜;刘伟;;基于误差分析的需求不确定性研究[J];工业工程与管理;2009年05期
2 张福利;施建军;徐小林;;基于多零售商和不确定需求的制造商退货政策研究[J];预测;2013年04期
3 张智楠;;需求不确定性下的柔性响应能力研究[J];商业经济;2010年23期
4 陈淮莉;李丹妮;郑建华;;大规模定制型企业需求不确定下订单优化配置[J];上海海事大学学报;2013年04期
5 吴美丽;;供应链环境下降低需求不确定性策略研究[J];中国商贸;2012年02期
6 蒋智凯;;医药供应链需求不确定性仿真研究[J];物流技术;2012年03期
7 蒋相岚;;零售商需求不确定性对供应链的影响[J];决策与信息(中旬刊);2013年05期
8 胡翠红;杜文;;引发顾客需求不确定的因素分析[J];商场现代化;2008年19期
9 冯泰文;;客户参与和企业竞争优势——基于需求不确定性的调节效应[J];软科学;2014年05期
10 孙叶晶;顾锋;;消费者需求不确定下的产品差异化竞争策略[J];陕西科技大学学报(自然科学版);2011年03期
相关会议论文 前1条
1 陈剑;刘运辉;宋西平;;需求不确定性条件下逢低买入网上拍卖中买方策略的研究[A];Well-off Society Strategies and Systems Engineering--Proceedings of the 13th Annual Conference of System Engineering Society of China[C];2004年
相关重要报纸文章 前7条
1 王蓁;做好“需求不确定”下的理想补给[N];中国商报;2004年
2 中国经济导报记者 刘宝亮;“扩需求控产能”成中国经济当务之急[N];中国经济导报;2013年
3 潘利军 银河期货 王明义;分歧渐增 领跌沪锌何去何从?[N];期货日报;2010年
4 张效;第二季度小尺寸面板需求不确定性增高 台面板厂转趋保守[N];电子资讯时报;2008年
5 本报记者 周冬梅;别揪着库存不放![N];中国纺织报;2012年
6 证券时报记者 张珈;上市公司各出奇招应对三重挑战[N];证券时报;2010年
7 商福民;明年进出口有望恢复性增长[N];中国工业报;2009年
相关博士学位论文 前4条
1 易东波;基于不确定性时变需求的动态批量决策研究[D];华中科技大学;2012年
2 王容;需求不确定性下移动通信消费者行为研究[D];电子科技大学;2012年
3 王娟丽;基于QFD的概念设计方法研究[D];浙江大学;2011年
4 黄洋;考虑风险的双源供应模式管理研究[D];华中科技大学;2011年
相关硕士学位论文 前10条
1 李赢丽;供应与需求风险下供应链协调机制研究[D];上海交通大学;2012年
2 陈智云;H电梯成品仓储管理改善研究[D];华南理工大学;2015年
3 李理;以客户需求为导向的产品化软件管理研究[D];复旦大学;2009年
4 沈璇;需求不确定性下的三级库存鲁棒控制模型研究[D];南京航空航天大学;2009年
5 苏良蒙;不确定性需求下供应链库存管理策略[D];南京理工大学;2009年
6 汪中;用户互动、需求不确定性、人员冲突与软件项目绩效关系研究[D];浙江大学;2006年
7 刘静;贝叶斯预测下需求连续的采购策略研究[D];南京理工大学;2010年
8 吕国华;P公司面向个性化需求的运营模式变革及实施过程研究[D];上海交通大学;2009年
9 陈婷;基于需求扰动的供应链协调[D];厦门大学;2009年
10 江文斌;基于大规模定制的客户需求有效化处理研究[D];重庆工商大学;2009年
,本文编号:2346382
本文链接:https://www.wllwen.com/guanlilunwen/wuliuguanlilunwen/2346382.html