当前位置:主页 > 管理论文 > 物流管理论文 >

新城金矿污水处理厂设施布置设计研究

发布时间:2020-11-21 17:55
   Mineral resources are the material foundation of human civilization,and mines throughout the production process produce large amounts of waste water,waste water discharged from the place of stope,dressing to the tailings and living areas,without processing or processing standards will result in soil surface water and underground water pollution,causing serious damage to the mine environment,the growth of animals and plants and human health adverse impact.But the shortage of water resources has become one of the key reasons which restrict the sustainable development of social economy,so the sewage treatment and reuse of wastewater has attracted much attention.At present,the world is paying more attention to the construction of sewage treatment plant,is through a variety of technical means,to further improve the quality,efficiency and automation of sewage treatment sewage treatment process.In the process of construction of wastewater treatment plant,wastewater treatment facilities layout design as an important work of plant construction,its quality directly affects the entire wastewater treatment of logistics,information flow,production capacity and technological process,flexibility,efficiency,cost and safety aspects of facility layout good,should be all factors influencing the facility layout are taken into account,so that the material handling cost is reduced to a minimum,so that the efficiency of process improvement,reasonably full and effective use of regional space,and as far as possible due to bring various factors change layout changes into consideration,to extend and adjust to facilitate future.Therefore,how to do well the facility layout design of wastewater treatment plant is very important.This paper around the Xincheng Gold mine wastewater treatment.plant facility layout were studied,taking Xincheng Gold mine wastewater treatment renovation project and tailings backwater system system as a case study,combined with the existing conditions,status of sewage treatment plant in Xincheng Gold Mine and put forward the question,to solve the problem,the main use of SLP system analysis,based on the sewage treatment method of data analysis,each operating unit logistics mutual relationship analysis and comprehensive relationship analysis,through the analysis of drawing activity position relationship graph,with each operating unit area draw the relevant map area,and then consider the actual layout of influence factors of sewage treatment plant,sewage treatment plant facility layout drawing up the design scheme,then has carried on the analysis and comparison 'of quantitative and'qualitative to layout and by using the weighted factor comparison method to carry on comprehensive evaluation to the scheme,put forward relevant Xincheng Gold mine wastewater treatment system facilities layout planning and design of optimal solution.This paper aims to taking Xincheng Gold Mine sewage treatment system upgrade project as a case study,the facility layout with layout design system theory,according to the system layout design in the application of plant facility layout design of wastewater treatment,will explore the various management methods applied in the project practice,break through the SLP is commonly used in industrial manufacturing workshop practice,expand the SLP theory methods in the application range of industrial facilities layout,the traditional method at the same time in the facility layout of the sewage treatment plant to break through on the qualitative analysis and the combination of personal experience,method of generation with quantitative analysis and system layout design,combined with the sewage treatment plant facility layout requirements for the application of perfecting the theory in the practice,the reasonable processing related data and provide the beneficial exploration and the reference for the facility planning layout of sewage treatment plants or similar items.
【学位单位】:东北大学
【学位级别】:硕士
【学位年份】:2014
【中图分类】:X753
【部分图文】:

组成图,组成图,服务系统


??规划与设计是指从工程项目建设流程上讲,设施规划与设计贯竣工始终。狭义的设施规划与设计是为生产或服务系统合理配或扩建的生产或服务系统,综合考虑相关因素,进行分析、规理配置资源,使系统能够有效运行,达到预期目标的一门学科与设计一般是指,以企业生产系统的结构布局为研究对象,从探讨企业平面布置设计目标及原则,着重研究设计方法与设计、物流、信息流得到最科学、合理、经济、有效的配置和安排,现以最少的投入获得最大收益的目标。??划与设计的研究范围??从工业工程角度上分为场址选择和设施设计两部分。设施设计设计、建筑设计、公用工程设计及信息通信设计五部分组成,组成图所示。??——场(厂)址选择??

布置图,布置图,成组技术,产品


图2.5成组技术布置图??Fig.2.5?Layout?of?Group?Technology??

布置图,成组技术,设施布置,基本流


??加:C#?元3??图2.5成组技术布置图??Fig.2.5?Layout?of?Group?Technology??表2.4成组技术布置的优缺点???Table2.4?The?Advantages?and?Disa
【参考文献】

相关期刊论文 前10条

1 陈雷雷;沈妙妙;王玥莹;;基于SLP的食品物流设施平面布局方法研究[J];安徽农业科学;2011年03期

2 杨嘉伟;黄浪;;系统化布置设计在物流公司仓储布局优化中的应用[J];产业与科技论坛;2010年07期

3 林清恋;刘胧;李萍;;SLP在医院手术室布置设计中的应用[J];工业工程;2009年05期

4 周三元;;物流设施布置程序模式浅析[J];物流技术;2009年03期

5 于宏朋;;基于SLP的短流程炼钢车间工艺布置设计研究[J];现代冶金;2009年01期

6 刘光富;陈晓莉;;系统布置设计在生产系统优化中的应用[J];工业工程与管理;2008年03期

7 欧洋逗;;制造型企业物流分析与优化[J];柴油机设计与制造;2008年01期

8 琚科昌;王转;;基于SLP的流程型制造企业物流设施布局分析方法及应用[J];物流技术;2006年10期

9 马光锋,奚文;设施规划在我国的应用与发展[J];机械设计与制造;2005年10期

10 刘正刚,姚冠新;设施布置设计的回顾、现状与展望[J];江苏理工大学学报(社会科学版);2001年01期


相关硕士学位论文 前6条

1 戴岩;MD公司芜湖工厂内部设施布局的研究[D];华南理工大学;2011年

2 王哲;基于精益生产的OTIS公司工厂布局改善研究[D];天津大学;2009年

3 盛茜;基于精益生产思想的厂房设施规划与布局研究[D];上海交通大学;2009年

4 吴琨;LX集团RDC布局规划研究[D];北京交通大学;2008年

5 关健;基于多目标规划的物流中心设施布置设计的研究[D];西南交通大学;2008年

6 唐小明;物流节点设施布置设计方法研究[D];长安大学;2006年



本文编号:2893386

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/wuliuguanlilunwen/2893386.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f4c61***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com