南宁A公司5754合金声屏障产品开发项目风险管理研究
发布时间:2018-04-01 02:20
本文选题:南宁 切入点:5754合金 出处:《广西大学》2017年硕士论文
【摘要】:本文以南宁A公司5754合金声屏障产品开发项目为研究对象,对相关文献进行了查阅及研究分析,联系国外及国内声屏障行业的发展历程,结合A公司现有资源配置,运用项目管理学习中学到的项目风险管理理论知识,对南宁A公司5754合金声屏障开发项目研究背景意义、研究内容和方法、项目存在风险的识别、评估及应对措施进行研究。本文通过六个章节展开分析和论述:第一章主要分析南宁A公司5754合金声屏障产品开发项目研究的背景和意义,研究的内容和方法;第二章介绍南宁A公司5754合金声屏障产品开发项目研究开发基础;第三章对南宁A公司5754合金声屏障产品开发项目进行风险识别;第四章对南宁A公司5754声屏障产品研究开发项目风险评估;第五章主要论述分析了对南宁A公司5754声屏障产品研究开发项目存在风险的应对措施;第六章是项目的结论及研究展望。本文通过对5754声屏障产品研究开发项目的风险进行识别和评估、提出风险应对措施,得出如下结论:项目实施符合国家相关产业政策,各种风险可控。
[Abstract]:This paper takes Nanning A Company 5754 alloy sound barrier product development project as the research object, has carried on the consultation and the research analysis to the related literature, contacts the foreign and domestic sound barrier industry development history, unifies the A company existing resources disposition, the article takes the Nanning A company 5754 alloy sound barrier product development project as the research object. Based on the theoretical knowledge of project risk management, the significance of research background, research contents and methods of 5754 alloy sound barrier development project in Nanning A Company, and the identification of existing risks in the project are analyzed. This paper analyzes and discusses through six chapters: the first chapter mainly analyzes the background and significance of the development project of 5754 alloy noise barrier products of Nanning A Company, the contents and methods of the research; The second chapter introduces the research and development foundation of the 5754 alloy sound barrier product of Nanning A Company, the third chapter identifies the risk of the 5754 alloy sound barrier product development project of Nanning A Company. The fourth chapter discusses the risk assessment of the research and development project of the 5754 sound barrier product of Nanning A Company, the fifth chapter mainly discusses the countermeasures of the risk of the research and development project of the 5754 sound barrier product of Nanning A Company. The sixth chapter is the conclusion and prospect of the project. By identifying and evaluating the risk of the research and development project of 5754 noise barrier product, the paper puts forward the risk countermeasures, and draws the following conclusions: the implementation of the project conforms to the relevant industrial policy of the country. The risks are manageable.
【学位授予单位】:广西大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U491.91
【参考文献】
相关期刊论文 前10条
1 黄岳宏;甄丽明;;新能源汽车企业的盈利能力及财务风险研究——以比亚迪公司为例[J];环球市场信息导报;2015年30期
2 周小平;王晓丽;;浅谈噪声污染与控制[J];科技创新与应用;2015年20期
3 冯珍;;新产品开发的生产风险控制研究[J];电子科技大学学报(社科版);2011年03期
4 潘晓东;;“六招”应对生产成本上升[J];印刷经理人;2010年09期
5 王爱生;;浅谈国内外公路声屏障技术发展状况及趋势[J];山西交通科技;2010年02期
6 赵新利;郑永革;;强化项目成本管理提高施工企业效益[J];前沿;2007年12期
7 谢志华;;内部控制、公司治理、风险管理:关系与整合[J];会计研究;2007年10期
8 骆s,
本文编号:1693543
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1693543.html