亭子口水库淹没区迁建项目委托建设管理实践

发布时间:2018-04-14 14:02

  本文选题:委托建设管理 + 库区迁移复建项目 ; 参考:《人民长江》2012年04期


【摘要】:亭子口水利枢纽库区交通复建和农田防护工程采取委托建设管理模式,由于淹没区迁移复建项目的复杂性和工程本身的特殊性,要求现场建设管理机构具有较高的专业管理水平。较详细介绍了加强该项目建设管理如工程质量控制、施工安全管理、工程进度控制和参建各方关系协调等方面的具体措施和对策,对于落实并体现国家关于政府投资项目管理改革的精神,提供了有价值的参考管理模式和可资借鉴的实例。
[Abstract]:The traffic rehabilitation and farmland protection projects in the reservoir area of the Tingzikou water conservancy project adopt the mode of entrusted construction management. Due to the complexity of the relocation and rehabilitation project in the flooded area and the particularity of the project itself,Field construction management agencies are required to have a higher level of professional management.The concrete measures and countermeasures for strengthening the construction management of the project, such as engineering quality control, construction safety management, project schedule control and coordination between the parties involved in the construction, are introduced in detail.For implementing and embodying the spirit of the government investment project management reform, this paper provides a valuable reference management model and some examples to be used for reference.
【作者单位】: 长江勘测规划设计有限责任公司工程建设与监理公司;
【分类号】:TU71


本文编号:1749607

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1749607.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户fa6bc***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com