长化节能扩建工程项目风险控制研究

发布时间:2018-04-21 01:17

  本文选题:技改项目 + 风险分析 ; 参考:《长春工业大学》2015年硕士论文


【摘要】:近年来,我国化工类企业发展迅猛,竞争日益激烈,化工企业面临生存发展、节约能源和保护自然环境的多重压力。化工技改项目投资大、技术要求高、工程复杂、工期限制严,加强化工企业技改项目风险管理意义重大。进行科学的风险管理从而提高工程项目的成功率就显得非常重要,这已成为化工企业在工程项目建设中面临的共同问题。中化长山改扩建项目是依托部分老系统公用工程,新增的年产18万吨合成氨、30万吨(新建45万吨)尿素工程。项目以褐煤为原料,采用航天粉煤加压气化、全低变换、低温甲醇洗、液氮洗、低压合成、C02气提尿素等国内外先进的技术工艺。项目建成后,中化长山的尿素产能将达60万吨/年,将成为东北区域较大的尿素生产基地,为化肥公司大东北战略实施奠定基础。本文依托中化吉林长山化工有限公司尿素生产装置节能降耗改扩建工程项目,在对项目风险及项目风险管理理论概述的基础上,对长化节能扩建工程项目风险控制进行概述,包括项目概况、项目风险管理机构和职责、项目风险控制评估方法、按工程几个主要阶段对本项目进行风险评估分析。对长化节能扩建工程项目决策阶段、设计阶段、设备装置招投标阶段、施工阶段及竣工验收阶段提出风险应对措施。总结工程项目风险防控的启示。
[Abstract]:In recent years, with the rapid development of chemical enterprises in China and the increasingly fierce competition, chemical enterprises are facing the pressure of survival and development, saving energy and protecting the natural environment. It is of great significance to strengthen the risk management of technical reform project of chemical enterprise because of its large investment, high technical requirement, complex project and strict limit of construction period. It is very important to carry out scientific risk management to improve the success rate of engineering projects, which has become a common problem faced by chemical enterprises in the construction of engineering projects. The Changshan reconstruction and extension project of Sinochem is based on part of the public works of the old system, with a new annual production of 180000 tons of synthetic ammonia and 300000 tons of urea (new 450000 tons). The project uses lignite as raw material and uses advanced technologies at home and abroad, such as pressurized gasification of aerospace pulverized coal, total low shift, low temperature methanol washing, liquid nitrogen washing, low pressure synthesis of C02 air extraction urea and so on. After the completion of the project, the urea production capacity of Changshan Mountain of Sinochem will reach 600000 tons per year, which will become a large urea production base in Northeast China and lay the foundation for the implementation of the strategy of fertilizer company in Northeast China. Based on the energy saving and consumption reduction and expansion project of the urea production plant of Jilin Changshan Chemical Co., Ltd., this paper summarizes the risk control of the Changhua Energy-saving extension Project on the basis of summarizing the project risk and project risk management theory. Including the project profile, project risk management organization and responsibilities, project risk control evaluation methods, according to several major stages of the project risk assessment analysis. The countermeasures are put forward for the decision-making stage, design stage, bidding stage, construction stage and completion acceptance stage of Changhua Energy-saving and extension Project. Summarize the inspiration of project risk prevention and control.
【学位授予单位】:长春工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TQ08;F426.72

【参考文献】

相关期刊论文 前10条

1 鲁红筠;;房地产企业项目设计阶段的风险管理[J];建材世界;2011年03期

2 赵俊花;王芳;;建设工程项目造价竣工结算审核探讨[J];才智;2012年19期

3 王要武,孙成双;建设项目风险分析专家系统框架研究[J];哈尔滨建筑大学学报;2002年05期

4 郑艳平;;建筑工程项目风险应对方法研究[J];山西建筑;2007年08期

5 区钰珍;;论工程项目的动态管理[J];山西建筑;2007年22期

6 赵彦芹;;基于PDCA的施工项目风险管理持续改进模式[J];山西建筑;2007年23期

7 赵增辉;;项目管理基本思想和方法在房地产中的应用分析[J];科技创业月刊;2011年07期

8 韩洁;;引入业主方项目管理的必要性探讨[J];科技致富向导;2012年08期

9 刘小凤;刘文华;;基于层次分析法的房地产项目风险动态管理[J];财会研究;2012年04期

10 杨贵金,田杰芳;承包商的风险管理[J];铁道物资科学管理;2003年05期

相关硕士学位论文 前4条

1 王力颖;张店钢铁总厂技术改造项目投资风险研究[D];中国海洋大学;2010年

2 王锋;建设工程风险管理[D];华中科技大学;2005年

3 赵惠君;国际招投标工程项目承包商风险管理[D];北京交通大学;2007年

4 王婷;S公司冷却塔节能改造项目风险管理研究[D];中国海洋大学;2013年



本文编号:1780290

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1780290.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户2f8ba***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com