当前位置:主页 > 管理论文 > 项目管理论文 >

寿光市软件园26#高层住宅楼施工质量控制研究

发布时间:2018-05-16 21:43

  本文选题:全面质量管理 + 质量控制 ; 参考:《中国海洋大学》2015年硕士论文


【摘要】:建筑业是国民经济的支柱产业。建筑质量是与人民生命和财产安全息息相关的重大问题。质量控制是建筑项目管理的核心,是决定项目成败的关键。新中国成立以后,党和国家高度重视建筑质量工作,特别是改革开放以来,在学习国外先进质量管理理念的基础上,逐步制定并实施了一系列建筑质量管理方面的政策措施,极大推动了我国建筑质量的提高。但是,我国建筑质量发展的基础相对薄弱,在经济利益驱动下,追求片面发展而忽视质量的现象依然存在。大大小小的建筑质量问题仍然时有发生。本文以全面质量管理理论为指导,结合TQM统计分析的七大工具,运用PDCA循环法对寿光市软件园26#高层住宅楼项目进行施工质量控制。对该施工项目进行事前分析,制定相关的防控措施和解决方案;在施工过程中积极执行;并采取严格有效的检查措施,来检验、监督质量控制措施的执行情况;对成功的经验加以肯定并予以标准化,对发现的问题或未解决的问题,进入下一个PDCA循环中去解决。将质量问题解决在预控阶段,对于提高建筑项目施工质量,具有一定的借鉴和现实意义。建筑施工质量控制应该坚持预防为主与严格检验相结合的原则,在项目形成的每一个阶段和环节,都要运用PDCA循环进行控制,通过PDCA的不断运转,将各种质量问题消灭于无形,从而提高项目质量,切实保证人民生命和财产的安全完整。
[Abstract]:The construction industry is the pillar industry of the national economy. The quality of the building is a major issue closely related to the people's life and property safety. Quality control is the core of the construction project management. It is the key to determine the success or failure of the project. After the founding of new China, the party and the state attach great importance to the work of building quality, especially since the reform and opening to the outside world. On the basis of the concept of quality management, a series of policies and measures for building quality management have been gradually formulated and implemented, which greatly promoted the improvement of the quality of China's architecture. However, the foundation of the development of China's architecture is relatively weak. Under the drive of economic interest, the phenomenon of pursuing one-sided development and neglecting the quality still exists. The problem of building quality still occurs. This paper, guided by the theory of total quality management, combined with seven tools of TQM statistical analysis, uses the PDCA cycle method to control the construction quality of the 26# high-rise residential building project in Shouguang software park. The construction project is analyzed in advance, and the relevant prevention and control measures and solutions are formulated; the construction is over. Actively carry out the process, and take strict and effective inspection measures to inspect and supervise the implementation of the quality control measures; affirm and standardize the successful experience, enter the next PDCA cycle to solve the problems found or unsolved problems. The quality problem is solved in the pre control stage, and the construction project is improved. Construction quality has a certain reference and practical significance. Construction quality control should adhere to the principle of combination of prevention and strict inspection. In every stage and link of the project, the PDCA cycle should be used to control it. Through the continuous operation of PDCA, all kinds of quality problems are eliminated to the intangible, thus improving the quality of the project. To ensure the safety and integrity of the people's lives and property.
【学位授予单位】:中国海洋大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU974;TU712.3

【参考文献】

相关期刊论文 前10条

1 张卫东;;浅谈建设工程施工过程中的旁站监理[J];中国新技术新产品;2013年16期

2 潘伟寿;;论文明施工在建筑工程管理中的作用[J];中国高新技术企业;2013年21期

3 满俊英;袁致明;米贤中;刘春玲;;PDCA循环在工程项目质量管理中的成功运用——以兰州石化公司研究院实验楼改造为例[J];甘肃科技;2011年19期

4 尤荣作;李学强;;加强建筑施工项目质量管理的研究[J];科技致富向导;2011年29期

5 王丽全;苏振华;;建筑工程项目质量管理方法[J];黑龙江科技信息;2011年11期

6 王雪强;李萍;;市政工程项目质量管理措施探析[J];民营科技;2011年02期

7 赵银柱;;浅谈建筑工程施工质量控制[J];建材技术与应用;2011年01期

8 赵尧良;;建筑工程施工质量过程的管理与控制[J];科技资讯;2011年01期

9 石云峰;;浅谈建筑施工项目的质量控制[J];山西建筑;2010年34期

10 丁权;;施工过程中项目的质量管理与控制[J];建设监理;2010年07期



本文编号:1898531

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/1898531.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户0265b***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com