浅谈三代核电建设中设备竣工文件的管理

发布时间:2018-06-16 18:02

  本文选题:浅谈 + 三代 ; 参考:《兰台世界》2013年S2期


【摘要】:正三代核电站建造是有别于二代核站的,它的特点采用的模块式的建造方式,AP1000核电机组共有119个结构模块和65个设备模块。在现场建造前,可以同时制造多个模块,模块制造完成后,在现场就可以像设备一样拼装起来,从而节约施工时间。在三代核电站建设中不仅有大量设备模块,还要有很多A1类设备和非A1类设备,与之对应的设备文件的量之大是可想而知,每天文档中心将要接收大量设备文件,如何
[Abstract]:The construction of the third generation nuclear power station is different from that of the second generation nuclear power station. The modular construction mode used in the construction of the nuclear power plant AP1000 has 119 structural modules and 65 equipment modules. Several modules can be manufactured at the same time before the site is built. After the module is manufactured, the equipment can be assembled in the field, thus saving the construction time. In the construction of the third generation nuclear power plant, there are not only a large number of equipment modules, but also a lot of A1 and non-A1 equipment. It can be imagined that the amount of equipment files corresponding to them is large, and the document center will receive a large number of equipment files every day.
【作者单位】: 国核工程有限公司;
【分类号】:G275.3


本文编号:2027620

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2027620.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f6649***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com