当前位置:主页 > 管理论文 > 项目管理论文 >

收益激励的优化与最优工期的选择

发布时间:2018-06-23 09:37

  本文选题:项目管理 + 时间-费用交换 ; 参考:《系统工程》2000年03期


【摘要】:时间-费用交换的进度计划问题着重研究如何以最少的费用对工期进行 压缩,,而没有考虑收益的影响。本文首先研究了以净收益为优化目标的时 间-费用交换问题,讨论了总价合同中的奖惩手段对承包商选择最优工期 的激励作用。建立了主从递阶决策模型,从业主的角度出发,研究了如何 选择最优的激励强度,协调业主和承包商的利益,使双方的决策达到一种 均衡状态,并分析了有关因素对均衡状态的影响。
[Abstract]:The scheduling problem of time-cost exchange focuses on how to reduce the duration with minimum cost without considering the effect of revenue. In this paper, the time-cost exchange problem with net income as the optimization objective is studied, and the incentive effect of rewards and punishments in the total price contract on the contractor to choose the optimal duration is discussed. In this paper, a hierarchical decision-making model is established. From the angle of the owner, this paper studies how to choose the optimal incentive intensity and coordinate the interests of the owner and the contractor, so that the decision-making of both parties can reach a balanced state. The influence of relevant factors on the equilibrium state is analyzed.
【作者单位】: 清华大学核能技术设计研究院!北京
【分类号】:F426.9

【相似文献】

相关期刊论文 前10条

1 黄安平;蒋金良;;智能电网的发展和应用研究[J];电气应用;2011年13期

2 ;康明斯2011年二季度业绩创历史新高[J];建设机械技术与管理;2011年07期

3 吴爽;;大连建投如此国有[J];东北之窗;2011年13期

4 ;IT未来发展趋势[J];软件;2010年01期

5 徐丽蓉;李文娟;;不同贴现率下的发电商报价微分博弈模型仿真分析[J];韶关学院学报;2011年08期

6 ;斯道拉恩索2011年第二季度营业利润保持稳健[J];造纸信息;2011年09期

7 ;凌特公司季度财务报告飘红[J];电源世界;2004年06期

8 ;政策全力加码 水利建设将迎十年黄金期[J];中国招标;2011年28期

9 ;全球财富500强中88%的企业采用Blue Coat改善应用交付[J];计算机与网络;2010年17期

10 ;Diva中国:目前期酒投资不存在泡沫[J];酒世界;2011年07期

相关会议论文 前1条

1 陈斌文;李光;罗铁军;吴琴;;湖南省矿业经济发展战略选择[A];资源·环境·和谐社会——中国地质矿产经济学会2007年学术年会论文集[C];2007年

相关硕士学位论文 前3条

1 柴永斌;绿色建筑的政策环境分析与对策研究[D];同济大学;2006年

2 薛江慧;兰州鹏飞有限责任公司6万m~3/Y泡沫玻璃项目的财务可行性分析[D];兰州大学;2008年

3 魏杰;云南烤烟生产成本研究[D];昆明理工大学;2007年



本文编号:2056688

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2056688.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户a68d3***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com