项目管理在J市政务云平台建设中的应用研究
发布时间:2018-06-23 13:21
本文选题:项目管理 + 电子政务 ; 参考:《南京邮电大学》2015年硕士论文
【摘要】:建设政务私有云,是解决各级政府在电子政务建设中面临的“信息孤岛、各自为战、资源浪费”等问题带来了行之有效的方法。J市作为一个160万左右人口的县级市,既有建设政务云提高电子政务建设效率、降低资金压力的愿望,又面临着人才、体制、规模等各方面的困扰。其建设政务私有云的实践探索,对其他县级城市都有不错的借鉴意义。本文归纳了当前智慧城市和云计算建设的一些理论研究与实践经验,探讨了J市建设政务云平台的目标、需求和推进策略,设计了J市政务云平台的整体方案,研究了如何将项目管理的方法应用在项目建设中,从而提升项目建设效率。归纳而言,作为县级市,J市建设政务云平台应遵循“先小后大、先易后难”的原则,做好投入与产出的测算,合理确定项目的范围,先完成Iaa S的建设(包括硬件资源池建设、管理平台建设以及相应的管理体制机制建设),待IaaS层服务建设完成后,再测算收益与投入后逐步推荐Paa S和Saa S应用。J市政务云平台的建设,既可以借鉴系统集成项目的普遍经验,又有云平台建设的特有重点,重点需要关注项目的工作分解(WBS)、项目的时间管理、质量管理、风险管理和变更管理,特别是要对云平台的信息安全风险做重点关注。
[Abstract]:The construction of government private cloud is an effective way to solve the problems of "information island, every self fighting, waste of resources" in the construction of e-government at all levels..J city is a county-level city with a population of about 1 million 600 thousand. It has the desire to build government affairs cloud to improve the efficiency of e-government construction and to reduce the pressure of capital. The practice and exploration of the construction of government private cloud has a good reference to other county-level cities. This paper sums up some theoretical research and practical experience of the current intelligent city and cloud computing construction, and probes into the goal, demand and promotion strategy of the construction of the government cloud platform in J City, and designs the city of J. The overall plan of government cloud platform has studied how to apply the project management method to the project construction so as to improve the efficiency of the project construction. As a county-level city, the construction government cloud platform of J city should follow the principle of "the first small, the first and the first difficult", the calculation of the input and output, the reasonable determination of the scope of the project, and the completion of the I first. The construction of AA S (including the construction of the pool of hardware resources, the construction of management platform and the corresponding management system and mechanism construction). After the completion of the IaaS layer service construction, the construction of the Paa S and Saa S application of the.J municipal government cloud platform is gradually recommended after the completion of the service construction of the IaaS layer. It can not only draw lessons from the general experience of the system integration project, but also have the special features of the construction of the cloud platform. The focus needs to be focused on the work decomposition (WBS), time management, quality management, risk management and change management of the project, especially on the risk of information security on the cloud platform.
【学位授予单位】:南京邮电大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TP399-C2;D63
【相似文献】
相关期刊论文 前10条
1 贾光明;找准切入点 探索新途径——中国十三冶北兴特钢项目部结合项目管理开展思想政治工作[J];冶金政工研究;2002年02期
2 周大平;“项目管理”带来的变化[J];w挛胖芸,
本文编号:2057248
本文链接:https://www.wllwen.com/guanlilunwen/xiangmuguanli/2057248.html